← Back
BuildNYC
Public elementary, junior or senior high
P.S. 370
3000 WEST 1ST STREET · BIN 3196587
💬 Discuss this project
1931Year Built
4Stories
W1Building Class
R6Zoning
37,240 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 37,384 sf lot · 1 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 37011p · 1 filing · 13 docs
BulkheadP.S. 3702p · 1 filing · 13 docs
Floor 4P.S. 37012p · 1 filing · 13 docs
Floor 3P.S. 37013p · 1 filing · 13 docs
Floor 2P.S. 37012p · 3 filings · 18 docs
Floor 1P.S. 37012p · 2 filings · 18 docs
MezzanineP.S. 3701p · 1 filing · 13 docs
Site & exteriorP.S. 37017p · 4 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority4010/15/2026
NYC Department of Education203/22/2026
NYC Department of Design and Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashok Architecture Design, PL/310/14/2026
Stephen B Jacobs Group205/12/2025
KNF Services Crop310/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stephen B Jacobs Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New American ConstructionScaffold407/08/2026
New Touch ConstructionGeneral Contractor307/08/2026
New Touch ConstructionScaffold307/08/2026
Anco Electl ContctngElectrical103/22/2026
Vitale EricElectrical103/21/2026
Interphase ElectricElectrical103/21/2026
Johnson BrothersElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317305/12/2025
Building Lifecycle
All (103)Filed (8)Permit Issued (8)Signed Off (2)Violation (60)Objection (11)Special Inspection (14)
10/14/2026
Filed — Alteration
Existing School Auditorium PA Space Modification in the Number of Seating as a result of Alteration Work.
B01473794-I1
10/13/2026
Special inspection requirement — Final
09/30/2026
Objection resolved — Resolved
09/30/2026
Special inspection requirement — Final
09/17/2026
Objection raised — Other
09/17/2026
Objection raised — Other
09/08/2026
Filed — Alteration
ADA Path of Travel Bathroom Upgrades for First and Second Floor including ADA Drinking Fountains and Water Bottle Refill Stations.
B01454597-S1
09/08/2026
Filed — Alteration
ADA Path of Travel Bathroom Upgrades for First and Second Floor including ADA Drinking Fountains and Water Bottle Refill Stations.
B01454597-I1
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Special inspection requirement — Post-installed Anchors
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
09/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/03/2026
Special inspection requirement — Interior lighting power
09/03/2026
Special inspection requirement — Lighting controls
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2026
Violation issued (FDNY_ORDER, closed)
03/23/2026
Violation issued (FDNY_ORDER, closed)
03/23/2026
Violation issued (FDNY_ORDER, closed)
01/22/2026
Signed off — Alteration
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
B01126786-I1
01/22/2026
Signed off — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
B01126783-I1
11/18/2025
Permit issued — General Construction
B00889746-I1-GC
11/18/2025
Permit issued — Construction Fence
B01126790-I1-FN
10/17/2025
Permit issued — General Construction
B00889746-I1-GC
10/17/2025
Permit issued — Construction Fence
B01126790-I1-FN
09/08/2025
Violation issued (FDNY_ORDER, closed)
07/09/2025
Violation issued (ECB, closed)
Construction
05/19/2025
Permit issued — General Construction
B00889746-I1-GC
05/13/2025
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
05/12/2025
Filed — Alteration
MASONRY: REPAIR/REPLACE DAMAGE FACE BRICK CUT AND REPOINT MASONRY JOINTS PROVIDE SEALANT AT OPEN JOINTS REPAIR DAMAGED LIMESTONE ; INTERIOR FINISHES: REPAIR WALL PLASTER REPAIR CEILING PLASTER REPAINT WALLS AND CEILINGS
B00889746-P1
04/25/2025
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
03/10/2025
Permit issued — Supported Scaffold
B01126786-I1-SF
03/07/2025
Permit issued — Sidewalk Shed
B01126783-I1-SH
03/06/2025
Permit issued — Construction Fence
B01126790-I1-FN
03/05/2025
Objection resolved — Addressed
02/14/2025
Objection resolved — Addressed
02/14/2025
Objection resolved — Addressed
12/17/2024
Violation issued (FDNY_ORDER, closed)
12/17/2024
Violation issued (FDNY_ORDER, closed)
12/17/2024
Violation issued (FDNY_ORDER, closed)
12/17/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Objection raised — Other
10/23/2024
Violation issued (FDNY_ORDER, closed)
10/23/2024
Violation issued (FDNY_ORDER, closed)
10/23/2024
Violation issued (FDNY_ORDER, closed)
10/18/2024
Objection raised — Other
10/18/2024
Objection raised — Other
10/15/2024
Filed — Alteration
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
B01126786-I1
10/15/2024
Filed — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
B01126783-I1
10/15/2024
Filed — Alteration
Filing for temporary construction fence. No change in use, egress or occupancy.
B01126790-I1
10/14/2024
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
07/22/2024
Violation issued (ECB, closed)
Construction
04/17/2024
Violation issued (FDNY_NOV, closed)
08/02/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Other
06/15/2023
Filed — Alteration
MASONRY: REPAIR/REPLACE DAMAGE FACE BRICK CUT AND REPOINT MASONRY JOINTS PROVIDE SEALANT AT OPEN JOINTS REPAIR DAMAGED LIMESTONE ; INTERIOR FINISHES: REPAIR WALL PLASTER REPAIR CEILING PLASTER REPAINT WALLS AND CEILINGS
B00889746-I1
12/07/2022
Violation issued (FDNY_ORDER, closed)
12/07/2022
Violation issued (FDNY_ORDER, closed)
12/07/2022
Violation issued (FDNY_NOV, closed)
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNew Touch Construction11/18/2025
DOB NOWConstruction FencePermit IssuedNew Touch Construction11/18/2025
DOB NOWGeneral ConstructionPermit IssuedNew Touch Construction10/17/2025
DOB NOWConstruction FencePermit IssuedNew Touch Construction10/17/2025
DOB NOWGeneral ConstructionPermit IssuedNew Touch Construction05/19/2025
DOB NOWSupported ScaffoldSigned-offNew American Construction03/10/2025
DOB NOWSidewalk ShedSigned-offNew American Construction03/07/2025
DOB NOWConstruction FencePermit IssuedNew Touch Construction03/06/2025
BISOTISSUEDGold Star Electrical11/03/2015
BISPLISSUEDVarsity Plumbing and Heating12/03/2012
BISPLISSUEDVarsity Plumbing and Heating10/10/2012
BISOTISSUEDAdam's European Contracting04/16/2012
BISOTISSUEDAdam's European Contracting04/16/2012
BISMHISSUEDACS System Associates11/14/2011
BISPLISSUEDVarsity Plumbing and Heating11/14/2011
BISOTISSUEDAdam's European Contracting11/14/2011
BISOTISSUEDAdam's European Contracting11/14/2011
BISEQISSUEDAdam's European Contracting10/27/2011
BISPLISSUEDVarsity Plumbing and Heating10/03/2011
BISOTISSUEDGazebo Contracting09/19/2011
BISEQISSUEDGazebo Contracting04/21/2011
BISEQISSUEDAdam's European Contracting01/04/2011
BISEQISSUEDAdam's European Contracting01/04/2011
BISEQISSUEDAdam's European Contracting01/04/2011
BISOTISSUEDAdam's European Contracting11/19/2010
BISMHISSUEDACS System Associates11/19/2010
BISPLISSUEDVarsity Plumbing and Heating11/19/2010
BISOTISSUEDAdam's European Contracting11/19/2010
BISPLISSUEDVarsity Plumbing and Heating10/04/2010
BISEQISSUEDAdam's European Contracting09/28/2010
BISEQISSUEDAdam's European Contracting09/27/2010
BISEQISSUEDGazebo Contracting04/07/2010
BISPLISSUEDVarsity Plumbing and Heating10/02/2009
BISEQISSUEDBridgeworks of Greater NY06/12/2000
BISPLISSUEDVarsity Plumbing and Heating07/08/1999
BISOTISSUEDL.A. Wenger Contracting Co07/08/1999
BISEQISSUEDProtchester Scaffolding01/06/1999
BISEQISSUEDProtchester Scaffolding09/17/1998
BISFPISSUEDB & J09/02/1994
BISOTISSUEDIannelli Construction Co09/17/1993
+ 3 more permits on file
1 project · most recent 09/08/2026
Water/Sanitary
FiledStatusContractorScope
09/08/2026——Water/Sanitary
12 projects · most recent 03/27/2025
General Wiring Lighting
FiledStatusContractorScope
03/27/2025Permit IssuedLit Mode Electrical Contg—
02/24/2025CompleteRichard Neu—
11/11/2024Permit IssuedThreetech ElectricLighting
05/11/2023CompleteElmhurst ElectricGeneral Wiring
01/31/2023CompleteCharan Electrical Enterp's—
06/28/2021CompleteAbm ElectricGeneral Wiring
10/21/2020Permit IssuedGemini Electric CoGeneral Wiring
03/20/2020CompleteCharan Electrical Enterp's—
05/13/2019CompleteAnco Electl ContctngGeneral Wiring
01/16/2019Permit IssuedSamco Electric—
01/15/2019CompleteCharan Electrical Enterp's—
07/16/2018CompleteAll Volts ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/13/2026Final—progress
09/30/2026Final—progress
09/03/2026Fire-Resistant Penetrations and Joints—special
09/03/2026Post-installed Anchors—special
09/03/2026Energy Code Compliance Inspections—progress
09/03/2026Fire-Resistance Rated Construction—progress
09/03/2026Interior lighting power—energy_progress
09/03/2026Lighting controls—energy_progress
09/03/2026Energy Code Compliance Inspections—progress
09/03/2026Fire-Resistant Penetrations and Joints—special
09/03/2026HVAC-R and service water piping design and insulation—energy_progress
05/13/2025MasonryMIKHAIL ZEYGMANspecial
04/25/2025MasonryMIKHAIL ZEYGMANspecial
10/14/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 370EducationEntire building
Project B01454597 Alteration · Plan Examiner Review · 09/08/2026
Project B01126783 Alteration · LOC Issued · 10/15/2024
Project B01126786 Alteration · LOC Issued · 10/15/2024
Project B01126790 Alteration · Permit Entire · 10/15/2024
Project B00889746 Alteration · Permit Entire · 06/15/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
10/15/2026B01473794-I1Request digital key ↗
10/04/2026B01454597-S1Request digital key ↗
10/04/2026B01454597-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/15/2026B01473794-I1Open ↗
10/04/2026B01454597-I1Open ↗
10/04/2026B01454597-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01126786-I1Open ↗
08/25/2026B00889746-P1Open ↗
08/24/2026B00889746-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01126783-I1Open ↗
08/13/2026B01126786-I1Open ↗
08/13/2026B01126790-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B00889746-P1Open ↗
08/21/2026B00889746-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
10/15/2026B01473794-I1Open ↗
10/04/2026B01454597-I1Open ↗
10/04/2026B01454597-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
10/04/2026B01454597-I1Open ↗
10/04/2026B01454597-S1Open ↗
08/13/2026B01126783-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00889746-I1Open ↗
08/13/2026B01126786-I1Open ↗
08/13/2026B01126783-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
10/15/2026B01473794-I1Open ↗
10/04/2026B01454597-I1Open ↗
10/04/2026B01454597-S1Open ↗
Showing 3 of 8 on file for this type