Community center
3002 FOSTER AVENUE
BROOKLYN · East Flatbush-Farragut · BIN 3427491
💬 Discuss this project
2023Year Built
1Stories
P5Building Class
PARKZoning
75,340 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Community center · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 131,700 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 20 docs
Floor 3Under Construction13p · 2 filings · 20 docs
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction13p · 4 filings · 20 docs
CellarUnder Construction13p · 3 filings · 20 docs
Site & exteriorUnder Construction51p · 2 filings · 20 docs
Filed — no permit issued8p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSIGLI CONSTRUCTION CO INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THORNTON TOMASETTI1403/11/2026
WSP1310/10/2025
STUDIO GANG ARCHITECTS, LTD.1010/03/2025
360 ENGINEERING P.C.106/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO5403/21/2026
CODE2203/21/2026
360 ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URBAN FOUNDATION ENGINEERINGGeneral Contractor1007/08/2026
CONSIGLI CONSTRUCTION COGeneral Contractor907/08/2026
DEBORAH BRADLEY CONS & MGGeneral Contractor507/08/2026
FIRST WOMEN'S FIRE SYS CRFire Protection407/08/2026
PARKVIEW P&H INCPlumbing307/08/2026
LENDLEASE(US)CONSTRUCTIONGeneral Contractor304/09/2026
VITELLO SEWER W.M H&P SERPlumbing107/08/2026
PRIMA PAVING CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS14382210/10/2025
WOMEN IN ENGINEERING DESI7524204/01/2024
Building Lifecycle
All (230)Filed (38)Permit Issued (35)Signed Off (14)Violation (2)Inspection (31)Objection (80)Special Inspection (30)
06/18/2026
Signed off — Alteration
Remedial work to the existing curb cut at Farragut Place
B01367287-S1
06/18/2026
Signed off — Alteration
Remedial work to the existing curb cut at Farragut Place
B01367287-I1
06/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/23/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Violation issued (FDNY_ORDER, closed)
04/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/30/2026
Permit issued — Curb Cut
B01367287-I1-CC
03/30/2026
Permit issued — Curb Cut
B01367287-S1-CC
03/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2026
Filed — Alteration
Remedial work to the existing curb cut at Farragut Place
B01367287-S1
03/11/2026
Filed — Alteration
Remedial work to the existing curb cut at Farragut Place
B01367287-I1
03/11/2026
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S8
02/19/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/02/2026
Signed off — Alteration
CONSTRUCTION FENCE FOR PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00882373-I1
01/28/2026
Filed — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-A8
01/26/2026
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S7
01/26/2026
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S9
01/23/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/23/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/13/2026
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-Z4
12/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S3
12/12/2025
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S6
12/09/2025
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S5
12/01/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/14/2025
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-Z2
11/14/2025
Signed off — Alteration
Fuel storage for Day Tank related to the emergency generator.
B01224114-S1
11/14/2025
Signed off — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-S4
11/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/10/2025
Filed — Alteration
Fuel storage for Day Tank related to the emergency generator.
B01224114-P1
10/08/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
10/08/2025
Special inspection requirement — Insulation placement and R values
JAMES WILSON
10/08/2025
Special inspection requirement — Seismic Isolation Systems
JAMES WILSON
10/08/2025
Special inspection requirement — Air barrier - visual inspection
JAMES WILSON
10/08/2025
Special inspection requirement — Fenestration areas
JAMES WILSON
10/08/2025
Special inspection requirement — Protection of exposed foundation insulation
JAMES WILSON
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
10/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES WILSON
10/08/2025
Special inspection requirement — Masonry
JAMES WILSON
10/08/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
JAMES WILSON
10/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
10/08/2025
Special inspection requirement — Fenestration air leakage
JAMES WILSON
10/08/2025
Special inspection requirement — Vestibules
JAMES WILSON
10/08/2025
Special inspection requirement — Air barrier continuity plan testing
JAMES WILSON
10/07/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JAMES WILSON
10/06/2025
Permit issued — Boiler Equipment
B01224114-S1-BE
10/06/2025
Special inspection requirement — Public Assembly Emergency Lighting
JAMES WILSON
10/03/2025
Filed — No Work
B01127705-P2
09/24/2025
Filed — No Work
B01127701-P1
09/23/2025
Objection raised — Scope
09/23/2025
Objection resolved — Addressed
09/22/2025
Permit issued — Structural
B08048502-S4-ST
09/16/2025
Filed — New Building
MECHANICAL WORK IN CONJUCTION WITH THE NB B08048502-I1
B08048502-A7
09/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
09/15/2025
Special inspection requirement — Vestibules
JAMES WILSON
09/15/2025
Special inspection requirement — Fenestration areas
JAMES WILSON
09/15/2025
Special inspection requirement — Protection of exposed foundation insulation
JAMES WILSON
Latest 60 of 230 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDEBORAH BRADLEY CONS & MG03/30/2026
DOB NOWCurb CutSigned-offDEBORAH BRADLEY CONS & MG03/30/2026
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO. OF BROOK10/06/2025
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO09/22/2025
DOB NOWConstruction FenceSigned-offCONSIGLI CONSTRUCTION CO09/09/2025
DOB NOWEarth WorkSigned-offCONSIGLI CONSTRUCTION CO07/10/2025
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO06/10/2025
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO06/10/2025
DOB NOWEarth WorkSigned-offPRIMA PAVING CORP06/04/2025
DOB NOWSprinklersSigned-offFIRST WOMEN'S FIRE SYS CR04/22/2025
DOB NOWStandpipeSigned-offFIRST WOMEN'S FIRE SYS CR04/22/2025
DOB NOWCurb CutSigned-offDEBORAH BRADLEY CONS & MG03/28/2025
DOB NOWCurb CutSigned-offDEBORAH BRADLEY CONS & MG03/28/2025
DOB NOWCurb CutSigned-offDEBORAH BRADLEY CONS & MG03/28/2025
DOB NOWPlumbingSigned-offPARKVIEW P&H INC01/03/2025
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO12/30/2024
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO09/23/2024
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO09/20/2024
DOB NOWFoundationSigned-offURBAN FOUNDATION ENGINEERING09/05/2024
DOB NOWConstruction FenceSigned-offURBAN FOUNDATION ENGINEERING09/05/2024
DOB NOWSprinklersSigned-offFIRST WOMEN'S FIRE SYS CR05/14/2024
DOB NOWStandpipeSigned-offFIRST WOMEN'S FIRE SYS CR05/14/2024
DOB NOWSupport of ExcavationSigned-offURBAN FOUNDATION ENGINEERING03/20/2024
DOB NOWPlumbingSigned-offVITELLO SEWER W.M H&P SER02/29/2024
DOB NOWGeneral ConstructionPermit IssuedLENDLEASE(US)CONSTRUCTION02/13/2024
DOB NOWPlumbingSigned-offPARKVIEW P&H INC01/24/2024
DOB NOWStructuralSigned-offLENDLEASE(US)CONSTRUCTION01/19/2024
DOB NOWGeneral ConstructionPermit IssuedLENDLEASE(US)CONSTRUCTION12/12/2023
DOB NOWPlumbingSigned-offPARKVIEW P&H INC10/17/2023
DOB NOWSupport of ExcavationSigned-offURBAN FOUNDATION ENGINEERING08/30/2023
DOB NOWFoundationSigned-offURBAN FOUNDATION ENGINEERING08/29/2023
DOB NOWConstruction FenceSigned-offURBAN FOUNDATION ENGINEERING08/29/2023
DOB NOWSupport of ExcavationSigned-offURBAN FOUNDATION ENGINEERING06/23/2023
DOB NOWFoundationSigned-offURBAN FOUNDATION ENGINEERING06/23/2023
DOB NOWConstruction FenceSigned-offURBAN FOUNDATION ENGINEERING06/05/2023
2 projects · most recent 01/28/2026
Air Conditioning Systems Heating Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
01/28/2026Signed-offCONSIGLI CONSTRUCTION COAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Iec CPY12 31,890 BTU · Fan Coil Indoor ×6
HPY16 61,620 BTU · Fan Coil Indoor ×6
Haakon AIRPAK 15,900 CFM · Fan Coil Indoor ×9
Price HPY12 32,756 BTU · Fan Coil Indoor ×3
Heating
Bell & Gossett e-1510 3EB, e-1510 3GB 78 CFM ×15
Stelpro ASHU0721CTCHAR 19,200 BTU · Electric Heater ×9
Qmark WH4508FC 16,400 BTU · Electric Heater ×6
__Junk__ ARA030LNAC3ABAA2I--DGCGCA-WCA---A 90 CFM · Heat Pump Outdoor ×3
Ventilation
Desertaire SA35EG4TWH240013 35 tons ×3
06/26/2025——Generators
Generators
__Junk__ QAS410SDT4F 8 tons · Generator ×1
1 project · most recent 01/28/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/28/2026Signed-offPARKVIEW P&H INCStorm, Water/Sanitary
9 projects · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026CompleteS. J. ELECTRIC INC.General Wiring
09/11/2025CompleteS. J. ELECTRIC INC.General Wiring
05/15/2025CompleteS. J. ELECTRIC INC.—
11/25/2024CompleteS. J. ELECTRIC INC.—
11/25/2024CompleteS. J. ELECTRIC INC.—
07/09/2024CompleteTF ELECTRICAL CORPGeneral Wiring
02/01/2024CompleteS. J. ELECTRIC INC.General Wiring
10/31/2023CompleteS. J. ELECTRIC INC.General Wiring
10/31/2023CompleteS. J. ELECTRIC INC.1 meters, 1 new_meters
1 project · most recent 01/28/2026
Steel Concrete Wood
FiledStatusContractorScope
01/28/2026Signed-offCONSIGLI CONSTRUCTION COSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
06/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/23/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/23/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2025Pass-Final PL - UndergroundPassView ↗
11/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/20/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2024Pass-Final PL - UndergroundPassView ↗
04/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/08/2025Fire-Resistance Rated ConstructionJAMES WILSONprogress
10/08/2025Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
10/08/2025Fenestration air leakageJAMES WILSONenergy_progress
10/08/2025Fenestration areasJAMES WILSONenergy_progress
10/08/2025VestibulesJAMES WILSONenergy_progress
10/08/2025Air barrier continuity plan testingJAMES WILSONenergy_progress
10/08/2025Protection of exposed foundation insulationJAMES WILSONenergy_progress
10/08/2025Insulation placement and R valuesJAMES WILSONenergy_progress
10/08/2025Air barrier - visual inspectionJAMES WILSONenergy_progress
10/08/2025Energy Code Compliance InspectionsJAMES WILSONprogress
10/08/2025Construction Utilizing CLT or SCL, Type IVJAMES WILSONspecial
10/08/2025Seismic Isolation SystemsJAMES WILSONspecial
10/08/2025MasonryJAMES WILSONspecial
10/08/2025Fire-Resistant Penetrations and JointsJAMES WILSONspecial
10/07/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsJAMES WILSONspecial
10/06/2025Public Assembly Emergency LightingJAMES WILSONprogress
09/15/2025Protection of exposed foundation insulationJAMES WILSONenergy_progress
09/15/2025Air barrier continuity plan testingJAMES WILSONenergy_progress
09/15/2025Fenestration air leakageJAMES WILSONenergy_progress
09/15/2025VestibulesJAMES WILSONenergy_progress
09/15/2025Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
09/15/2025Fenestration areasJAMES WILSONenergy_progress
09/15/2025Insulation placement and R valuesJAMES WILSONenergy_progress
09/15/2025Air barrier - visual inspectionJAMES WILSONenergy_progress
09/15/2025Fire-Resistance Rated ConstructionJAMES WILSONprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shirley Chisholm Recreation CenterFitness / RecreationFloor 1
Project B01127698 No Work · PA Certificate of Operation Issued · 01/23/2025
Project B01127705 No Work · PA Certificate of Operation Issued · 01/23/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 371 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch33
08/27/2026B00882373-I1Request digital key ↗
08/27/2026B08048502-S7Request digital key ↗
08/27/2026B08048502-S6Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Applications & Permits12
▸DOB NOWDEP Stormwater Construction Permit5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/03/2026340886429Open ↗
01/26/2026340886429Open ↗
08/18/2023340886429Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
11/28/2018321656392Open ↗
11/21/2018321656392Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/29/2023340886429Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications199
▸DOB NOWProgress Inspector Seal & Signature99
10/01/2026B08048502-P4Open ↗
10/01/2026B08048502-P4Open ↗
10/01/2026B08048502-P4Open ↗
Showing 3 of 99 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
10/01/2026B08048502-P4Open ↗
10/01/2026B08048502-P4Open ↗
10/01/2026B08048502-P4Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
08/27/2026B08048502-S6Open ↗
08/27/2026B08048502-S5Open ↗
08/27/2026B08048502-S4Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/26/2017321656392Open ↗
09/22/2017321656392Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/22/2017321656392Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/18/2023340886429Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/22/2017321656392Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/18/2023340886429Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/29/2023340886429Open ↗
▸BISSTREET TREE CHECKLIST1
08/29/2023340886429Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/31/2022321656392Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/22/2017321656392Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/01/2022321656392Open ↗
08/31/2022321656392Open ↗
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
10/12/2022321656392Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/12/2022321656392Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs54
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/02/2022321656392Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
10/12/2022321656392Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
08/18/2023340886429Open ↗
▸BISFINAL1
10/12/2022321656392Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/22/2017321656392Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/31/2022321656392Open ↗
▸Filing & Intake Forms4
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/18/2023340886429Open ↗
▸BISEFILING COVER SHEET1
09/22/2017321656392Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/18/2023340886429Open ↗
▸BISADDITIONAL INFORMATION1
01/27/2026340886429Open ↗
▸Other Documents35
▸DOB NOWSite Survey: Initial4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
08/29/2023340886429Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
08/18/2023340886429Open ↗
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
08/18/2023340886429Open ↗
▸BISSupporting Document: Fee Exempt1
11/15/2022321656392Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/26/2017321656392Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/18/2023340886429Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/29/2023340886429Open ↗
▸DOB NOWFinal Survey1
08/27/2026B08048502-I1Open ↗