← Back
Three families
3002 VOORHIES AVENUE
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R3-2Zoning
1,744 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: MALLORY ONE MGMT LLC · 4,554 sf lot · 0.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Floor 11p · 1 filing · 2 docs
Cellar2p · 1 filing · 7 docs
Sub-Basement4p · 1 filing · 7 docs
Site & exterior1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VOORHIES MNGT LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2021$1.3M—— → —$745/sf building
10/11/2013$718K—Private party → Private party$412/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC201/30/2024
A&B WORLD CONSULTING202/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIMEX GROUP INCGeneral Contractor507/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738104/18/2023
A&B WORLD CONSULTING, INC5704202/15/2023
Building Lifecycle
All (45)Filed (4)Permit Issued (5)Signed Off (1)Violation (9)Inspection (3)Objection (22)Special Inspection (1)
09/24/2025
Permit issued — Foundation
B00857128-I1-GC
09/26/2024
Permit issued — Curb Cut
B00996167-I1-CC
09/26/2024
Permit issued — General Construction
B00857128-I1-FO
09/26/2024
Permit issued — General Construction
B00857128-I1-GC
01/30/2024
Filed — Alteration
INSTALLATION OF NEW 7' CURB CUT
B00996167-I1
04/18/2023
Filed — Alteration
B00857128-I1
03/23/2023
Signed off — Alteration
Alteration type 2, PL work type to replace 3 new condensing gas combination boilers and re-connect 3 existing gas dryers. No change of use, occupancy, or egress.
B08039674-I1
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/03/2023
Objection raised — Other
03/03/2023
Objection raised — Other
03/03/2023
Objection raised — Other
03/03/2023
Objection raised — Other
03/03/2023
Objection raised — Admin
03/03/2023
Objection raised — Admin
03/03/2023
Objection raised — Inspections
03/03/2023
Objection raised — Inspections
02/27/2023
Objection raised — Scope
02/27/2023
Objection resolved — Addressed
02/27/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Scope
02/15/2023
Filed — Alteration
Alteration type 2, PL work type to replace 3 new condensing gas combination boilers and re-connect 3 existing gas dryers. No change of use, occupancy, or egress.
B08039674-P1
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
02/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/05/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/28/2022
Permit issued — Plumbing
B08039674-I1-PL
12/07/2022
Objection raised — Zoning
12/07/2022
Objection resolved — Addressed
11/22/2022
Filed — Alteration
Alteration type 2, PL work type to replace 3 new condensing gas combination boilers and re-connect 3 existing gas dryers. No change of use, occupancy, or egress.
B08039674-I1
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/15/2018
Violation issued (HPD, closed)
I
11/17/2017
Violation issued (HPD, closed)
I
11/03/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedDIMEX GROUP INC09/24/2025
DOB NOWCurb CutPermit IssuedDIMEX GROUP INC09/26/2024
DOB NOWGeneral ConstructionPermit IssuedDIMEX GROUP INC09/26/2024
DOB NOWGeneral ConstructionPermit IssuedDIMEX GROUP INC09/26/2024
DOB NOWPlumbingSigned-offNICE PLUMBING CORP12/28/2022
2 projects · most recent 03/24/2022
General Wiring
FiledStatusContractorScope
03/24/2022CompleteKINGS ELECTRIC CO., INC.General Wiring
01/25/2022CompleteKINGS ELECTRIC CO., INC.4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/05/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/15/2023Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B08039674-I1Request digital key ↗
08/27/2026B00857128-I1Request digital key ↗
08/26/2026B00996167-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
03/24/2022321572302Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/28/2022321572302Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B08039674-I1Open ↗
08/27/2026B00857128-I1Open ↗
08/26/2026B00996167-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B08039674-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B08039674-I1Open ↗
08/13/2026B08039674-P1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00857128-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00857128-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/24/2022321572302Open ↗