1949Year Built
6Stories
D3Building Class
R5Zoning
521,976 sfGross Floor Area
572Units
LL97 Covered1 Open Violation ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 592,000 sf lot · 0.88 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Roof26p · 1 filing · 10 docs
Bulkhead1p · 1 filing · 4 docs
Site & exterior13p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2007/08/2026
NYCHA 99203/22/2026
NYC HOUSING AUTHORITY403/21/2026
CRANE MECHANICAL CORP103/21/2026
NY CITY HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC109/30/2022
AK CONSULTING SERVICES, INC109/20/2022
BITOPI CONSULTANTS LLC209/18/2022
SUPERSTRUCTURES ENG. + ARCH.104/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH103/21/2026
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N CONSTRUCTION GROUPGeneral Contractor1207/08/2026
ORTEGA-CEDENO, DAVIDElectrical203/21/2026
CHRYSSIADIS, NICOLASElectrical203/21/2026
JOSEPH SEGRETIElectrical103/21/2026
ALVARADO, JUANElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
SEGRETI JOSEPHElectrical103/21/2026
TRI-STATE ELECL & MECHL IElectrical103/22/2026
LCJ ELEC'L CONTR'S INCElectrical103/22/2026
ANZELM KRYSAElectrical103/21/2026
HALPERN, SElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416109/30/2022
BITOPI CONSULTANTS LLC7036109/18/2022
TECTONIC ENGINEERING CONS106104/12/2021
Building Lifecycle
All (32)Filed (5)Permit Issued (6)Signed Off (5)Violation (10)Special Inspection (6)
11/10/2025
Violation issued (FDNY_NOV, closed)
10/25/2025
Violation issued (FDNY_NOV, closed)
06/02/2025
Violation issued (FDNY_NOV, closed)
09/17/2024
Violation issued (FDNY_NOV, closed)
06/03/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 3062 AVENUE V, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08005355-I1
01/25/2024
Signed off — Alteration
NYCHA Nostrand Bldg 05, Roofing & roof structure repairs as per the plans filed including: Removal/replacement/repairs of existing roofing system, penthouse vent, roof drains, spalled/cracked masonry & concrete, removal of parapet & install of guardrail.
B00495998-I1
10/24/2023
Permit issued — General Construction
B00495998-I1-GC
10/02/2023
Violation issued (FDNY_NOV, closed)
05/30/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 3062 AVENUE V, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08005330-I1
05/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 3062 AVENUE V, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08005365-I1
04/24/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. TEMPORARY DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08013520-I1
10/21/2022
Permit issued — General Construction
B00495998-I1-GC
10/01/2022
Permit issued — Protection and Mechanical Methods
B08013520-I1-PM
09/30/2022
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. TEMPORARY DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08013520-I1
09/30/2022
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
09/21/2022
Permit issued — Construction Fence
B08005365-I1-FN
09/20/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 3062 AVENUE V, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08005365-I1
09/19/2022
Permit issued — Supported Scaffold
B08005355-I1-SF
09/19/2022
Permit issued — Sidewalk Shed
B08005330-I1-SH
09/18/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 3062 AVENUE V, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08005355-I1
09/18/2022
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 3062 AVENUE V, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08005330-I1
09/18/2022
Special inspection requirement — Post-installed Anchors
KAMRUL AHSAN
04/12/2021
Filed — Alteration
NYCHA Nostrand Bldg 05, Roofing & roof structure repairs as per the plans filed including: Removal/replacement/repairs of existing roofing system, penthouse vent, roof drains, spalled/cracked masonry & concrete, removal of parapet & install of guardrail.
B00495998-I1
03/31/2021
Special inspection requirement — Masonry
GEORGE GHEBRYAL
03/31/2021
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
03/31/2021
Special inspection requirement — Final
Paul Millman
03/31/2021
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
07/23/2011
Violation issued (ECB, closed)
Elevators
07/23/2011
Violation issued (ECB, closed)
Construction
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP10/24/2023
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP10/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offJ & N CONSTRUCTION GROUP10/01/2022
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP09/21/2022
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP09/19/2022
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP09/19/2022
BISPLISSUEDDYNAMIC CONTRACTING CORP03/11/2011
BISOTISSUEDDYNAMIC ENERGY GROUP INC10/30/2009
BISOTISSUED4A GENERAL CONTRACTING CORP.06/08/2001
BISPLISSUEDDNA PLUMBING CONTR. INC03/26/2001
BISOTISSUEDCRANE MECHNICAL01/06/2001
BISPLISSUEDDNA PLUMBING CONTR. INC09/28/2000
BISOTISSUEDCRANE MECHNICAL09/26/2000
BISOTISSUEDLITHOS CONSTRUCTION LTD03/10/2000
BISPLISSUEDDNA PLUMBING CONTR. INC06/25/1999
BISOTISSUEDCRANE MECH CORP06/23/1999
6 projects · most recent 08/01/2025
General Wiring
FiledStatusContractorScope
08/01/2025CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
08/01/2025CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
04/17/2024CompleteAUJLA ELECTRIC CORP—
04/17/2024CompleteAUJLA ELECTRIC CORP—
09/19/2022CompleteLCJ ELEC'L CONTR'S INC—
09/19/2022CompleteLCJ ELEC'L CONTR'S INC—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/30/2022Post-installed AnchorsJOEL PHAGOOspecial
09/18/2022Post-installed AnchorsKAMRUL AHSANspecial
03/31/2021MasonryGEORGE GHEBRYALspecial
03/31/2021Post-installed AnchorsGEORGE GHEBRYALspecial
03/31/2021FinalPaul Millmanprogress
03/31/2021Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00495998-I1Request digital key ↗
08/28/2026B08005355-I1Request digital key ↗
08/28/2026B08005330-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
03/17/2011320057601Open ↗
11/04/2009320057601Open ↗
10/30/2009320057601Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
08/26/2009320057601Open ↗
08/26/2009320057601Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00495998-I1Open ↗
08/28/2026B08005355-I1Open ↗
08/28/2026B08005365-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/28/2011320057601Open ↗
06/28/2011320057601Open ↗
08/26/2009320057601Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B08013520-I1Open ↗
08/28/2026B00495998-I1Open ↗
08/28/2026B00495998-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/01/2009320057601Open ↗
08/26/2009320057601Open ↗
08/26/2009320057601Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/26/2009320057601Open ↗
08/26/2009320057601Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00495998-I1Open ↗
08/28/2026B00495998-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
04/12/2011320057601Open ↗
▸BISSCHEDULE B - PLUMBING1
08/26/2009320057601Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/26/2009320057601Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00495998-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00495998-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/01/2026B00495998-I1Open ↗
08/13/2026B08005355-I1Open ↗
08/13/2026B08005365-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/25/2011320057601Open ↗
06/28/2011320057601Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/26/2009320057601Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/01/2026B00495998-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/28/2011320057601Open ↗
08/26/2009320057601Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/26/2009320057601Open ↗
08/26/2009320057601Open ↗