← Back
BROOKLYN
3004 BRIGHTON 7 STREET
BROOKLYN · Brighton Beach · BIN 3429733
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof57p · 1 filing · 20 docs
Floor 552p · 1 filing · 20 docs
Floor 451p · 1 filing · 20 docs
Floor 351p · 1 filing · 20 docs
Floor 254p · 1 filing · 20 docs
Floor 152p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILD R US CORPGeneral Contractor1307/28/2026
AMOK INCFire Protection207/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor207/08/2026
AMOK INCPlumbing207/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING PROFESSIONAL63931106/29/2026
STEEL CORE ENGINEERING PL1098406/29/2026
Building Lifecycle
All (162)Filed (17)Permit Issued (14)Signed Off (7)Violation (7)Inspection (7)Objection (80)Special Inspection (30)
08/06/2026
Signed off — Alteration
NEW CURB CUT
B00991600-S1
08/06/2026
Signed off — Alteration
NEW CURB CUT
B00991600-I1
08/04/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/23/2026
Permit issued — Curb Cut
B00991600-I1-CC
07/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/02/2026
Objection raised — Structural
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Structural
06/29/2026
Filed — New Building
PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING
B00986248-P8
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
OLEG RUDITSER
06/25/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
OLEG RUDITSER
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
OLEG RUDITSER
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
OLEG RUDITSER
06/25/2026
Special inspection requirement — Maintenance information
OLEG RUDITSER
06/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
OLEG RUDITSER
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
06/25/2026
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
06/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/08/2026
Permit issued — Plumbing
B00986248-S4-PL
04/08/2026
Permit issued — Sprinklers
B00986248-S4-EW-SP
04/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/20/2026
Permit issued — Curb Cut
B00991600-S1-CC
01/21/2026
Special inspection requirement — Maintenance information
OLEG RUDITSER
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
OLEG RUDITSER
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
OLEG RUDITSER
01/21/2026
Special inspection requirement — Final
OLEG RUDITSER
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
OLEG RUDITSER
01/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
OLEG RUDITSER
01/21/2026
Special inspection requirement — Mechanical Systems
OLEG RUDITSER
01/21/2026
Special inspection requirement — Shutoff dampers
OLEG RUDITSER
01/21/2026
Special inspection requirement — Heating Systems
OLEG RUDITSER
01/07/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Scope
01/06/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/29/2025
Objection raised — Admin
12/24/2025
Filed — New Building
PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING
B00986248-P7
12/24/2025
Objection raised — Energy
12/17/2025
Filed — New Building
PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING
B00986248-P6
12/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
OLEG RUDITSER
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
12/15/2025
Special inspection requirement — Maintenance information
OLEG RUDITSER
12/15/2025
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
12/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
OLEG RUDITSER
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
12/15/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
OLEG RUDITSER
12/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
OLEG RUDITSER
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
OLEG RUDITSER
10/10/2025
Objection raised — Energy
10/10/2025
Objection resolved — Addressed
10/10/2025
Special inspection requirement — Air barrier - visual inspection
OLEG RUDITSER
09/26/2025
Filed — New Building
PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING
B00986248-P4
09/08/2025
Permit issued — Mechanical Systems
B00986248-S5-MS
08/12/2025
Permit issued — General Construction
B00986248-I1-GC
06/03/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01150281-I1
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBUILD R US CORP07/23/2026
DOB NOWPlumbingSigned-offAMOK INC04/08/2026
DOB NOWSprinklersSigned-offAMOK INC04/08/2026
DOB NOWCurb CutSigned-offBUILD R US03/20/2026
DOB NOWMechanical SystemsSigned-offBUILD R US09/08/2025
DOB NOWGeneral ConstructionPermit IssuedBUILD R US08/12/2025
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC02/19/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/04/2024
DOB NOWPlumbingSigned-offAMOK INC11/15/2024
DOB NOWPlumbingSigned-offAMOK INC11/15/2024
DOB NOWGeneral ConstructionPermit IssuedBUILD R US11/04/2024
DOB NOWSupport of ExcavationSigned-offBUILD R US10/28/2024
DOB NOWStructuralSigned-offBUILD R US10/28/2024
DOB NOWFoundationSigned-offBUILD R US10/28/2024
1 project · most recent 06/29/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Signed-offBUILD R US CORPHeating and Air Conditioning Systems
Heat / Cool
Samsung AJ036BXJ4CH 32,000 BTU · Vrf Outdoor ×16
1 project · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026Signed-offAMOK INCSprinkler System
1 project · most recent 06/29/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026Signed-offAMOK INCStorm, Water/Sanitary
3 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026CompleteMAC ELECT'L CONTR. INC.General Wiring
12/10/2024CompletePOWER DIRECT ELECTRIC INC—
12/06/2024CompleteRICHARD NEU—
1 project · most recent 06/29/2026
FiledStatusContractorScope
06/29/2026Signed-offAMOK INC2 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/04/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
06/25/2026Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
06/25/2026Maintenance informationOLEG RUDITSERenergy_progress
06/25/2026HVAC-R and service water heating system controlsOLEG RUDITSERenergy_progress
06/25/2026HVAC-R and service water piping design and insulationOLEG RUDITSERenergy_progress
06/25/2026HVAC-R and service water heating equipmentOLEG RUDITSERenergy_progress
06/25/2026Energy Code Compliance InspectionsOLEG RUDITSERprogress
06/25/2026Sprinkler SystemsAlexander Sheymanspecial
06/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationOLEG RUDITSERspecial
06/25/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)OLEG RUDITSERspecial
01/21/2026Maintenance informationOLEG RUDITSERenergy_progress
01/21/2026Duct leakage testing, insulation and designOLEG RUDITSERenergy_progress
01/21/2026HVAC-R and service water heating equipmentOLEG RUDITSERenergy_progress
01/21/2026HVAC-R and service water heating system controlsOLEG RUDITSERenergy_progress
01/21/2026HVAC-R and service water piping design and insulationOLEG RUDITSERenergy_progress
01/21/2026Heating SystemsOLEG RUDITSERspecial
01/21/2026Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
01/21/2026Mechanical SystemsOLEG RUDITSERspecial
01/21/2026FinalOLEG RUDITSERprogress
01/21/2026Energy Code Compliance InspectionsOLEG RUDITSERprogress
01/21/2026Shutoff dampersOLEG RUDITSERenergy_progress
12/15/2025HVAC-R and service water heating system controlsOLEG RUDITSERenergy_progress
12/15/2025HVAC-R and service water piping design and insulationOLEG RUDITSERenergy_progress
12/15/2025HVAC-R and service water heating equipmentOLEG RUDITSERenergy_progress
12/15/2025Maintenance informationOLEG RUDITSERenergy_progress
12/15/2025Energy Code Compliance InspectionsOLEG RUDITSERprogress
Latest 25 of 75.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/26/2026B00991600-P1Request digital key ↗
08/26/2026B00991600-S1Request digital key ↗
08/26/2026B00991600-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/12/2024340908423Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/12/2024340908423Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/25/2026B00986248-P9Open ↗
08/13/2026B00986248-P4Open ↗
08/13/2026B00986248-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/25/2026B00986248-P9Open ↗
08/13/2026B00986248-I1Open ↗
08/13/2026B00986248-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00986248-I1Open ↗
▸Seals & Professional Certifications95
▸DOB NOWProgress Inspector Seal & Signature53
08/31/2026B00986248-P7Open ↗
08/31/2026B00986248-P7Open ↗
08/31/2026B00986248-P7Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
08/31/2026B00986248-P7Open ↗
08/31/2026B00986248-P7Open ↗
08/31/2026B00986248-P7Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026B00991600-I1Open ↗
08/25/2026B00986248-P8Open ↗
08/25/2026B00986248-P7Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/12/2024340908423Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/12/2024340908423Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00986248-P4Open ↗
08/13/2026B00986248-P3Open ↗
08/13/2026B00986248-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/25/2026B00986248-P9Open ↗
08/13/2026B00986248-I1Open ↗
08/13/2026B00986248-P4Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
06/11/2025340908423Open ↗
▸BISSTREET TREE CHECKLIST1
06/11/2025340908423Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00986248-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00986248-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/25/2026B00986248-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00986248-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00986248-S2Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00986248-S2Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/12/2024340908423Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/12/2024340908423Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/25/2026B00986248-P9Open ↗
08/13/2026B00986248-P1Open ↗
08/13/2026B00986248-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/25/2026B00986248-P9Open ↗
08/13/2026B00986248-P1Open ↗
08/13/2026B00986248-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026B00986248-P1Open ↗
08/25/2026B00986248-I1Open ↗
08/25/2026B00986248-P9Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
06/11/2025340908423Open ↗
06/11/2025340908423Open ↗
02/12/2024340908423Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00986248-S1Open ↗
▸DOB NOWFinal Survey1
08/25/2026B00986248-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/25/2026B00986248-I1Open ↗