← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
3009 AVENUE I
BROOKLYN · Flatbush · BIN 3429624
💬 Discuss this project
2024Year Built
7Stories
RMBuilding Class
R6Zoning
78,059 sfGross Floor Area
82Units
0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: NOSTRAND LAND LLC · 14,653 sf lot · 5.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof224p · 2 filings · 20 docs
Floor 7212p · 1 filing · 20 docs
Floor 6215p · 1 filing · 20 docs
Floor 5209p · 1 filing · 20 docs
Floor 4208p · 1 filing · 20 docs
Floor 3209p · 1 filing · 20 docs
Floor 2242p · 1 filing · 20 docs
Floor 1249p · 3 filings · 20 docs
Cellar246p · 1 filing · 20 docs
Site & exteriorUnder Construction63p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP504/09/2026
CAVU PROPERTY GROUP404/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group1803/21/2026
THE GREEN STUDIO103/21/2026
BRICOLAGE DESIGNS103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDERS NYC LLCGeneral Contractor2107/08/2026
PRIME PIPING & HEATING INFire Protection407/08/2026
GWT ENTERPRISES INCGeneral Contractor204/09/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
MJM ASSOCIATES CONSTR LLCGeneral Contractor104/09/2026
S F ELECTRICAL SERVICE IN 004727General Contractor103/22/2026
ARYEH SIMONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681807/07/2026
SHAHRISH SHUVO ENGINEERIN8524105/26/2022
Building Lifecycle
All (189)Filed (23)Permit Issued (20)Signed Off (10)Violation (9)Inspection (14)Objection (80)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
08/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
08/10/2026
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
08/10/2026
Special inspection requirement — Lighting controls
Soorjbally Harilall
08/10/2026
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
08/10/2026
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
08/10/2026
Special inspection requirement — Vestibules
Soorjbally Harilall
08/10/2026
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
08/10/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
08/10/2026
Special inspection requirement — Metering
Soorjbally Harilall
08/10/2026
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
08/10/2026
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
08/10/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
08/10/2026
Special inspection requirement — Fenestration areas
Soorjbally Harilall
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
08/10/2026
Special inspection requirement — Interior lighting power
Soorjbally Harilall
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
07/07/2026
Filed — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-A7
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
07/06/2026
Special inspection requirement — Vestibules
Soorjbally Harilall
07/06/2026
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
07/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
07/06/2026
Special inspection requirement — Fenestration areas
Soorjbally Harilall
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
07/06/2026
Special inspection requirement — Interior lighting power
Soorjbally Harilall
07/06/2026
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
07/06/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
07/06/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
05/28/2026
Signed off — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-S4
04/28/2026
Filed — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-A5
04/20/2026
Filed — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-A2
02/18/2026
Permit issued — Foundation
B00737630-I1-GC-CX
12/09/2025
Filed — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-P8
12/08/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
09/16/2025
Objection resolved — Addressed
09/02/2025
Objection raised — Other
08/08/2025
Filed — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-P7
07/31/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, OVERHEAD PROTECTION, AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01030598-I1
07/16/2025
Signed off — Alteration
Application herewith filed for a Curb Cut installation in conjunction with NB job number B00721545-I1.
B00892740-I1
07/16/2025
Signed off — Alteration
Application herewith filed for a Curb Cut installation in conjunction with NB job number B00721545-I1.
B01180906-I1
07/15/2025
Signed off — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-S5
06/26/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/16/2025
Violation issued (HPD, closed)
A
06/12/2025
Signed off — Alteration
Construction Fence filed in conjunction with NB job numbers B00721545-I1 & B00852545-I1.
B00952510-I1
05/13/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/07/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/07/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/05/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/29/2025
Signed off — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-S7
04/29/2025
Signed off — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-S3
04/29/2025
Signed off — New Building
Mechanical System filed in conjunction with NB job number B00721545-I1.
B00721545-S2
04/24/2025
Objection resolved — Addressed
04/10/2025
Permit issued — General Construction
B00721545-I1-GC
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedCITY BUILDERS NYC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDERS NYC04/10/2025
DOB NOWCurb CutSigned-offCITY BUILDERS NYC03/27/2025
DOB NOWCurb CutSigned-offCITY BUILDERS NYC03/27/2025
DOB NOWPlumbingSigned-offA M B MECHANICAL INC02/18/2025
DOB NOWPlumbingSigned-offA M B MECHANICAL INC02/18/2025
DOB NOWStandpipeSigned-offPRIME PIPING & HEATING IN02/18/2025
DOB NOWMechanical SystemsSigned-offCITY BUILDERS NYC07/05/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC04/10/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC04/10/2024
DOB NOWStructuralSigned-offCITY BUILDERS NYC04/03/2024
DOB NOWFoundationSigned-offCITY BUILDERS NYC04/03/2024
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDERS NYC03/06/2024
DOB NOWPlumbingSigned-offA M B MECHANICAL INC02/22/2024
DOB NOWPlumbingSigned-offA M B MECHANICAL INC02/22/2024
DOB NOWStandpipeSigned-offPRIME PIPING & HEATING IN02/22/2024
DOB NOWSupport of ExcavationSigned-offCITY BUILDERS NYC12/12/2023
DOB NOWFoundationSigned-offCITY BUILDERS NYC12/12/2023
DOB NOWConstruction FenceSigned-offCITY BUILDERS NYC12/08/2023
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC06/09/2022
BISEQISSUEDYRS BUILD LLC02/09/2006
BIS—ISSUEDYSR BULLDING LLC02/06/2006
BISEQISSUEDYSR BULLDING LLC01/27/2006
BISEQISSUEDBTA BUILDING & DEVELOING INC01/12/2004
BISPLISSUEDDURR PLUMBING INC11/18/1994
1 project · most recent 07/07/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Permit IssuedCITY BUILDERS NYC LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RXSQ24TBVJUB 23,000 BTU · Condensing Unit ×116
RXSQ24TBVJU 23,000 BTU · Vrf Outdoor ×26
RXSQ36TBVJUB 38,000 BTU · Vrf Outdoor ×10
RXTQ48TBVJUB 48,000 BTU · Vrf Outdoor ×10
RXYQ96AATJB 96,000 BTU · Vrf Outdoor ×8
Heating
Daikin RXSQ24TBVJUB 25,800 BTU · Condensing Unit ×142
RXSQ36TBVJUB 43,000 BTU · Vrf Outdoor ×10
RXTQ48TBVJUB 54,000 BTU · Vrf Outdoor ×10
RXYQ96AATJB 108,000 BTU · Vrf Outdoor ×8
ARUM144BTE5 162,000 BTU · Vrf Outdoor ×1
— ARUM144BTE5 162,000 BTU · Condensing Unit ×1
Ventilation
— CSP-A200 82 CFM · Exhaust Fan ×2
CSP-A390-VG 70 CFM · Exhaust Fan ×2
GB-100HP 590 CFM · Exhaust Fan ×2
SQ-97-VG 150 CFM · Exhaust Fan ×2
SQ-99-VG 500 CFM · Exhaust Fan ×2
CSP-A250 105 CFM · Exhaust Fan ×1
G-097-VG 100 CFM · Exhaust Fan ×1
Daikin SQ-22-M2 6,902 CFM · Exhaust Fan ×4
CSP-A200 82 CFM · Exhaust Fan ×2
CSP-A390-VG 70 CFM · Exhaust Fan ×2
GB-100HP 590 CFM · Exhaust Fan ×2
SQ-97-VG 150 CFM · Exhaust Fan ×2
SQ-99-VG 500 CFM · Exhaust Fan ×2
CSP-A250 105 CFM · Exhaust Fan ×1
G-097-VG 100 CFM · Exhaust Fan ×1
1 project · most recent 07/07/2026
Sprinkler System
FiledStatusContractorScope
07/07/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 07/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/07/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
4 projects · most recent 07/29/2024
General Wiring
FiledStatusContractorScope
07/29/2024CompleteS&F ELECTRICAL SERVICE INGeneral Wiring
05/13/2024CompletePOWER DIRECT ELECTRIC INC—
04/18/2024CompleteSOLAS ELECTRICAL CORP—
12/18/2023CompleteS&F ELECTRICAL SERVICE IN—
2 projects · most recent 07/07/2026
Concrete
FiledStatusContractorScope
07/07/2026Permit IssuedCITY BUILDERS NYC LLCConcrete
05/26/2022Permit IssuedCITY BUILDERS NYC LLC1 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/08/2025Fail-Final Boiler Equipment InspectionFailView ↗
06/26/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/07/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/07/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/05/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/05/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/21/2024Pass-Final PL - UndergroundPassView ↗
02/29/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/10/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
08/10/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
08/10/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
08/10/2026Maintenance informationSoorjbally Harilallenergy_progress
08/10/2026Interior lighting powerSoorjbally Harilallenergy_progress
08/10/2026VestibulesSoorjbally Harilallenergy_progress
08/10/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
08/10/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
08/10/2026Exterior lighting powerSoorjbally Harilallenergy_progress
08/10/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
08/10/2026Lighting controlsSoorjbally Harilallenergy_progress
08/10/2026Fenestration air leakageSoorjbally Harilallenergy_progress
08/10/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
08/10/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
08/10/2026MeteringSoorjbally Harilallenergy_progress
08/10/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
08/10/2026Fenestration areasSoorjbally Harilallenergy_progress
08/10/2026Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
07/06/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
07/06/2026Fenestration areasSoorjbally Harilallenergy_progress
07/06/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
07/06/2026Maintenance informationSoorjbally Harilallenergy_progress
07/06/2026VestibulesSoorjbally Harilallenergy_progress
07/06/2026Exterior lighting powerSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 241 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/29/2026B00737630-I1Request digital key ↗
08/26/2026B00952510-I1Request digital key ↗
08/25/2026B01030598-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION9
07/24/2025300338944Open ↗
07/22/2025340894189Open ↗
12/11/2024340894189Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
08/02/2023340894189Open ↗
▸Zoning, Tax Lot & Property Records24
▸DOB NOWZD1: DOB Zoning Diagram9
08/17/2026B00721545-A7Open ↗
08/13/2026B00721545-P8Open ↗
08/13/2026B00721545-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZoning Exhibit form (1-5)9
08/17/2026B00721545-A7Open ↗
08/13/2026B00721545-I1Open ↗
08/13/2026B00721545-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/15/2024322114975Open ↗
08/02/2023340894189Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/15/2024322114975Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
11/15/2024322114975Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
11/15/2024322114975Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00721545-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWProgress Inspector Seal & Signature49
09/28/2026B00721545-P2Open ↗
09/28/2026B00721545-P2Open ↗
09/28/2026B00721545-P2Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/28/2026B00721545-P2Open ↗
09/28/2026B00721545-P2Open ↗
09/28/2026B00721545-P2Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/29/2026B00737630-I1Open ↗
08/27/2026B00892740-I1Open ↗
08/25/2026B01030598-I1Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/02/2023340894189Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/02/2023340894189Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/13/2026B00721545-P7Open ↗
08/13/2026B00721545-P8Open ↗
08/13/2026B00721545-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist9
08/17/2026B00721545-P4Open ↗
08/17/2026B00721545-A7Open ↗
08/17/2026B00721545-P8Open ↗
Showing 3 of 9 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/02/2023340894189Open ↗
▸BISSTREET TREE CHECKLIST1
10/16/2023340894189Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00721545-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00721545-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026B00721545-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/17/2026B00721545-S4Open ↗
08/13/2026B00721545-S5Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00721545-S3Open ↗
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/15/2024322114975Open ↗
10/09/2024322114975Open ↗
10/09/2024322114975Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
12/12/2024340894189Open ↗
09/09/2024340894189Open ↗
10/16/2023340894189Open ↗
▸BISBOROUGH INTAKE FORM2
12/27/2019301538110Open ↗
12/20/2019302015815Open ↗
▸BISEFILING COVER SHEET1
10/01/2024322114975Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/02/2023340894189Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/02/2023340894189Open ↗
▸Other Documents38
▸DOB NOWSite Survey: Initial9
08/17/2026B00721545-A7Open ↗
08/13/2026B00721545-I1Open ↗
08/13/2026B00721545-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/17/2026B00721545-A7Open ↗
08/13/2026B00721545-P1Open ↗
08/13/2026B00721545-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
08/17/2026B00721545-A7Open ↗
08/17/2026B00721545-P8Open ↗
08/17/2026B00721545-P6Open ↗
Showing 3 of 9 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/13/2025340894189Open ↗
09/18/2024340894189Open ↗
08/02/2023340894189Open ↗
▸DOB NOWHPD - Completion Notice2
08/23/2026B00721545-I1Open ↗
08/13/2026B00721545-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00721545-S6Open ↗
08/13/2026B00737630-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/15/2024322114975Open ↗
▸BISPLOT DIAGRAM1
10/09/2024322114975Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
09/18/2024340894189Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type