← Back
Other college and university
Hewitt Hall
3009 BROADWAY · BIN 1082349
💬 Discuss this project
1901Year Built
14Stories
W6Building Class
R8Zoning
698,122 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Other college and university · Owner of record: BARNARD COLLEGE · 151,100 sf lot · 4.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 12 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARNARD COLLEGE - COLUMBIA UNIVERSI409/13/2026
BARNARD COLLEGE1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A E C CONSULTING EXPEDITING403/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEDROCK PLBG. & HTG., INCPlumbing607/08/2026
DAVID KLEEMANElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor109/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983107/31/2026
SOCOTEC, INC.301107/31/2026
GUTH DECONZO CONSULTING E1210212/22/2020
ATLANTIC ENGINEERINGLABOR1381110/06/2020
Building Lifecycle
All (26)Filed (6)Permit Issued (4)Signed Off (1)Facade (FISP) (3)Violation (4)Special Inspection (8)
09/04/2026
Permit issued — Supported Scaffold
M01419010-S1-SF
07/31/2026
Filed — Alteration
EXTERIOR FACADE REPAIRS ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01419010-I1
07/23/2026
Filed — Alteration
Application filed for plumbing work to support MEP equipment. No change to use, egress or occupancy.
M01414287-I1
06/30/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01372786-I1
06/23/2026
Special inspection requirement — Post-installed Anchors
Jesse Rushworth
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/23/2026
Special inspection requirement — Final
Jesse Rushworth
06/23/2026
Special inspection requirement — Masonry
Jesse Rushworth
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
03/19/2026
Permit issued — Suspended Scaffold
M01372786-I1-SC
03/17/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01372786-I1
02/12/2026
Violation issued (FDNY_NOV, closed)
10/02/2025
Violation issued (FDNY_ORDER, closed)
12/22/2020
Filed — Alteration
M00423950-P1
12/22/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
MATTHEW DECONZO
12/21/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
MATTHEW DECONZO
11/10/2020
Permit issued — Plumbing
M00423950-I1-PL
11/05/2020
Filed — Alteration
M00423950-I1
10/09/2020
Permit issued — Plumbing
M00373885-I1-PL
10/06/2020
Filed — Alteration
plumbing modifications
M00373885-I1
10/09/2019
Violation issued (FDNY_ORDER, closed)
03/31/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2007
Cycle 6 facade report submitted
02/16/2007
Cycle 6 facade report signed — SAFE
08/16/2006
Cycle 6 facade inspection completed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP09/04/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM03/19/2026
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC11/10/2020
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC10/09/2020
BISOTISSUEDVANGUARD CONSTRUCTION AND10/02/2020
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C02/08/2016
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C07/17/2015
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C02/11/2015
BISEQISSUEDMETROPOLITAN ENTERPRISES05/09/2012
BISEQISSUEDMETROPOLITAN ENTERPR INC02/09/2012
BISSPISSUEDCODE FIRE PROTECTION CORP.11/14/2005
BISPLISSUEDGEORGE BRESLAW AND SONS INC07/11/2005
BISMHISSUEDCORP. INTER. CONTR.07/08/2005
BISOTISSUEDCORP. INTER. CO05/25/2005
BISMHISSUEDA.W. & S. CONSTRUCTION CO07/22/2003
BISOTISSUEDA.W. & S. CONSTRUCTION CO07/22/2003
BISPLISSUEDPACE PLBG CORP07/21/2003
2 projects · most recent 07/23/2026
Water/Sanitary
FiledStatusContractorScope
07/23/2026——Water/Sanitary
10/06/2020Signed-offBEDROCK PLBG. & HTG., INCWater/Sanitary
3 projects · most recent 09/02/2026
General Wiring
FiledStatusContractorScope
09/02/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/22/2026Permit IssuedHESO ELECTRICAL INC—
10/19/2020CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
1 project · most recent 03/17/2026
FiledStatusContractorScope
03/17/2026Signed-offSTRUCTUAL PRESV SYSTEM—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/23/2026Post-installed AnchorsJesse Rushworthspecial
06/23/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/23/2026FinalJesse Rushworthprogress
06/23/2026MasonryJesse Rushworthspecial
06/09/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
06/09/2026Energy Code Compliance InspectionsMARISA HARTEprogress
12/22/2020Fire-Resistant Penetrations and JointsMATTHEW DECONZOspecial
12/21/2020Fire-Resistant Penetrations and JointsMATTHEW DECONZOspecial
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00373885-I1Request digital key ↗
09/04/2026M00423950-I1Request digital key ↗
08/15/2026M00423950-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/18/2026M01372786-I1Request digital key ↗
08/16/2026M01419010-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION6
10/02/2020140955143Open ↗
02/23/2016122270078Open ↗
07/31/2015122470860Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/21/2020140955143Open ↗
07/31/2015122470860Open ↗
02/10/2012120972206Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01419010-S1Open ↗
09/18/2026M01414287-I1Open ↗
08/28/2026M00423950-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/31/2015122470860Open ↗
02/23/2015122270078Open ↗
02/26/2013120972206Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/04/2026M00423950-I1Open ↗
09/04/2026M00423950-P1Open ↗
08/16/2026M01419010-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/21/2020140955143Open ↗
07/31/2015122470860Open ↗
02/23/2015122270078Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/31/2015122470860Open ↗
02/23/2015122270078Open ↗
02/10/2012120972206Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/18/2026M01414287-I1Open ↗
08/23/2026M01419010-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/21/2020140955143Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/10/2012120972206Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/21/2020140955143Open ↗
▸Safety & Tenant Protection1
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
02/10/2012120972206Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/04/2026M00423950-P1Open ↗
09/04/2026M00423950-I1Open ↗
08/16/2026M01419010-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/21/2020140955143Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/02/2020140955143Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00373885-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/04/2021140955143Open ↗
10/02/2020140955143Open ↗
09/21/2020140955143Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/21/2020140955143Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/04/2021140955143Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/07/2022122270078Open ↗
06/04/2021140955143Open ↗
10/02/2020140955143Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/04/2026M00423950-P1Open ↗
09/04/2026M00423950-I1Open ↗
08/16/2026M01419010-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/24/2025140955143Open ↗
02/26/2013120972206Open ↗
▸BISSHED LETTER1
05/11/2012120972206Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
02/28/2013120972206Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/10/2012120972206Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/23/2016122270078Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/04/2021140955143Open ↗
09/21/2020140955143Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
07/31/2015122470860Open ↗
02/23/2015122270078Open ↗
02/10/2012120972206Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/21/2020140955143Open ↗
02/23/2015122270078Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/31/2015122470860Open ↗
02/24/2015122270078Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
09/21/2020140955143Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01372786-I1Open ↗