| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/24/2026 | — | — | Others | Other Bell & Gossett ap19-84-tktm-84 6,630,000 BTU · Heat Exchanger ×2 |
| 10/16/2025 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Others | Cooling Mitsubishi Electric PKA-A36KA7 705 CFM · Fan Coil Indoor ×2 PKA-A36KA8 705 CFM · Vrf Indoor ×2 PKA-A36KAS 705 CFM · Vrf Indoor ×2 PUY-A36NKA7 3,885 CFM · Split System ×2 Heating Trane FF-H-B-020 FF-B-B-020 207 CFM · Electric Heater ×4 FF-BB-030 277 CFM · Electric Heater ×2 TRAN UHA090S 1,215 CFM · Electric Heater ×2 TRANE UHSA042S 590 CFM ×2 Ventilation Greenheck GREENHECK QEI-18 5,000 CFM · Exhaust Fan ×4 GREENHECK QEI-12 2,700 CFM · Exhaust Fan ×2 GREENHECK USF-10B1 1,000 CFM · Exhaust Fan ×2 Ducts & Piping __Junk__ 0 Ductwork ×2 Other Mitsubishi Electric PUMY-P112VKM-A 3,885 CFM · Vrf Outdoor ×2 PUY-A36NKA7 3,885 CFM · Condensing Unit ×2 Aaon V3-CRB-8-0-26HB-12R 3,000 CFM · Ahu ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2025 | Signed-off | KG SPRINKLER CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/24/2026 | — | — | Water/Sanitary |
| 10/16/2025 | Signed-off | DONATO PLUMBING, INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 12/02/2024 | Complete | KRAFT ELECTRIC CORP | — |
| 10/16/2024 | Complete | LAURA ELEC'L LIGHTING & | — |
| 05/04/2023 | Complete | JSP ELECTL CNTNG CORP | General Wiring |
| 12/08/2020 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 09/10/2020 | Cancelled | TOP SHELF ELECTRIC CORP | — |
| 01/17/2020 | Complete | STRIANO ELECTRIC CO., INC | General Wiring |
| 07/29/2019 | Complete | DAL ELECTRICAL CORP. | General Wiring |
| 07/26/2019 | Complete | DAL ELECTRICAL CORP. | General Wiring |
| 06/21/2019 | Complete | ARCADIA ELECT'L CO. INC. | General Wiring |
| 05/15/2018 | Complete | TOP SHELF ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2025 | Signed-off | DONATO PLUMBING, INC | Steel, Concrete |
| Owner | Filings | Most Recent |
|---|---|---|
| BARNARD COLLEGE - COLUMBIA UNIVERSI | 30 | 09/14/2026 |
| COLUMBIA UNIVERSITY | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| STUDIO HUJI | 1 | 08/07/2026 |
| LORING CONSULTING ENGINEERS, INC. | 12 | 07/24/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 06/22/2026 |
| MITCHELL / GIURGOLA ARCHITECTS | 13 | 10/16/2025 |
| SILMAN | 7 | 06/05/2025 |
| ANTONIO LEO ARCHITECT | 29 | 05/06/2025 |
| AMM ENGINEERING PC | 1 | 07/08/2024 |
| RLM ENGINEERING PLLC | 1 | 12/13/2023 |
| PATUXENT ENGINEERING LLC | 1 | 06/06/2023 |
| PAUL PERDEK, PROF. ENG. PLLC | 4 | 01/27/2023 |
| KZ ENGINEERING, P.C | 1 | 07/05/2022 |
| FXCOLLABORATIVE ARCHITECTS LLP | 1 | 01/20/2021 |
| URBAN INTEGRATIONS | 2 | 11/19/2020 |
| DOOLING & COMPANY ARCHITECTS | 1 | 06/04/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| CONVERSANO ASSOCIATES, INC. | 62 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 54 | 03/21/2026 |
| AE DESIGN SOLUTION | 10 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 2 | 03/21/2026 |
| PATUXENT ENGINEERING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SPRING SCAFFOLDING LLC | General Contractor | 24 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 19 | 07/08/2026 |
| STAMFORD TENT & EQUIP CO | General Contractor | 4 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 3 | 07/08/2026 |
| TODD, MICHAEL | Electrical | 3 | 03/21/2026 |
| EFRAIM ALTER | Electrical | 2 | 03/21/2026 |
| DONATO PLUMBING, INC | Plumbing | 2 | 07/08/2026 |
| ROTHOWSKI, EDWARD | Electrical | 1 | 03/21/2026 |
| STRIANO ELECTRIC CO., INC | Electrical | 1 | 03/22/2026 |
| SUTTON, ALEX | Electrical | 1 | 03/21/2026 |
| VIALVA, JOSEPH | Electrical | 1 | 03/21/2026 |
| KG SPRINKLER CORP | Fire Protection | 1 | 07/08/2026 |
| CS BRIDGE CORP | General Contractor | 1 | 07/08/2026 |
| KSW MECHANICAL,LLC | General Contractor | 1 | 04/09/2026 |
| A & M WARSHAW PLBG & HTG | Plumbing | 1 | 07/08/2026 |
| SATELLITE EAST PLBG. INC | Plumbing | 1 | 07/08/2026 |
| ANTHONY LUCIANO | Electrical | 1 | 03/21/2026 |
| SIGNS CAD | Scaffold | 1 | 08/26/2026 |
| BECKER, CHARLES | Electrical | 1 | 03/21/2026 |
| COLE, VINCENT | Electrical | 1 | 03/21/2026 |
| DAL ELECTRICAL CORP. | Electrical | 1 | 03/22/2026 |
| FILARDI, JAMES | Electrical | 1 | 03/21/2026 |
| JOHN FELBINGER | Electrical | 1 | 03/21/2026 |
| LAZO, DARWIN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 1 | 07/24/2026 |
| LOMBARDO PROF ENGINEERING | 8566 | 1 | 06/22/2026 |
| AMARACON TESTING & INSPEC | 5842 | 28 | 10/16/2025 |
| FUTURE TECH CONSULTANTS O | 589 | 1 | 09/04/2025 |
| AMM ENGINEERING PC | 725 | 1 | 07/08/2024 |
| RLM ENGINEERING PLLC | 6913 | 1 | 12/13/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 08/07/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | PALLADIUM WINDOW SOLUTION | 06/24/2026 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 10/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | KSW MECHANICAL,LLC | 09/10/2025 |
| DOB NOW | Foundation | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/07/2025 |
| DOB NOW | General Construction | Signed-off | STAMFORD TENT & EQUIP CO | 05/09/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ARSENAL SCAFFOLD INC | 07/08/2024 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 06/28/2024 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/21/2024 |
| DOB NOW | Plumbing | Signed-off | SATELLITE EAST PLBG. INC | 05/23/2024 |
| DOB NOW | General Construction | Signed-off | STAMFORD TENT & EQUIP CO | 05/07/2024 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 03/04/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 03/01/2024 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 02/29/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 02/29/2024 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 12/19/2023 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 12/07/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 06/14/2023 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/13/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARSENAL SCAFFOLD INC | 06/09/2023 |
| DOB NOW | General Construction | Signed-off | STAMFORD TENT & EQUIP CO | 05/05/2023 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 03/06/2023 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 02/27/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 01/30/2023 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 01/26/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 01/26/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 01/25/2023 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 01/03/2023 |
| DOB NOW | Plumbing | Signed-off | A & M WARSHAW PLBG & HTG | 12/30/2022 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 12/20/2022 |
| DOB NOW | Supported Scaffold | Signed-off | CS BRIDGE CORP | 07/06/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 03/05/2021 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 03/02/2021 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 11/19/2020 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 09/11/2020 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 12/19/2019 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 12/27/2018 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 06/05/2018 |
| BIS | OT | ISSUED | STAMFORD TENT & EQUIP CO | 06/23/2022 |
| BIS | OT | ISSUED | STAMFORD TENT & EQUIP CO | 08/04/2021 |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/04/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/18/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/13/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/10/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/02/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/02/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/05/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/01/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 01/10/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/22/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/03/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/27/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/27/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/18/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/12/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/17/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/17/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/17/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/17/2026 | Energy Code Compliance Inspections | — | progress |
| 06/17/2026 | Post-installed Anchors | Michael Lombardo | special |
| 12/05/2025 | Public Assembly Emergency Lighting | CONNIE PISANI | progress |
| 11/25/2025 | Mastic and Intumescent Fire-resistant Coatings | CONNIE PISANI | special |
| 11/25/2025 | Sprayed fire-resistant materials | CONNIE PISANI | special |
| 11/25/2025 | Fire-Resistance Rated Construction | CONNIE PISANI | progress |
| 11/25/2025 | Fire-Resistant Penetrations and Joints | CONNIE PISANI | special |
| 09/25/2025 | Mastic and Intumescent Fire-resistant Coatings | CONNIE PISANI | special |
| 09/25/2025 | Sprayed fire-resistant materials | CONNIE PISANI | special |
| 09/25/2025 | Fire-Resistance Rated Construction | CONNIE PISANI | progress |
| 09/25/2025 | Fire-Resistant Penetrations and Joints | CONNIE PISANI | special |
| 08/20/2025 | HVAC-R and service water piping design and insulation | MARISA HARTE | energy_progress |
| 08/13/2025 | Energy Code Compliance Inspections | MARISA HARTE | progress |
| 08/13/2025 | Final | MARISA HARTE | progress |
| 08/13/2025 | Fire-Resistant Penetrations and Joints | MARISA HARTE | special |
| 08/13/2025 | Mechanical Systems | MARISA HARTE | special |
| 06/24/2025 | Post-installed Anchors | CONNIE PISANI | special |
| 06/24/2025 | Concrete - Cast-In-Place | CONNIE PISANI | special |
| 06/24/2025 | Masonry | CONNIE PISANI | special |
| 06/24/2025 | Structural Steel - Details | CONNIE PISANI | special |
| 06/24/2025 | Subgrade Inspections | CONNIE PISANI | special |
| 06/24/2025 | Final | CONNIE PISANI | progress |