Condo, residential unit in 2-10 unit building
301 DEGRAW STREET
BROOKLYN · BIN 3006687
💬 Discuss this project
1901Year Built
3Stories
R1Building Class
R6BZoning
4,622 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Condo, residential unit in 2-10 unit building · Owner of record: 301 DEGRAW LLC · 2,517 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof1p · 1 filing · 5 docs
Bulkhead3p · 2 filings · 10 docs
Floor 43p · 1 filing · 7 docs
Floor 35p · 2 filings · 10 docs
Floor 23p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMS CONTRACTOR1507/08/2026
NYC BUILDING SOLUTIONS CO603/22/2026
AMS CONSTRACTING INC103/22/2026
301 DEGRAW703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY CUCICH ARCHITECT905/20/2022
SYED ENGINEERING, P.C.301/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
ACCRETE CONSTRUCTION1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCRETE CONSTRUCTION GROUPGeneral Contractor1203/21/2026
AMS CONTRACTOR INCGeneral Contractor1007/08/2026
NYC BUILDING SOLUTIONS COGeneral Contractor1007/08/2026
PRECISION SPKLR SVCS LLCFire Protection207/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
STEVEN BOODHOOElectrical103/21/2026
G C RESTORATIONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANTHONY CUCICH ARCHITECT6081805/20/2022
DOYUN KIM; RA7415101/13/2020
Building Lifecycle
All (84)Filed (12)Permit Issued (15)Signed Off (7)Violation (13)Inspection (7)Special Inspection (30)
06/08/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00628376-I1
06/08/2022
Signed off — Alteration
B00289194-I1
06/01/2022
Signed off — Alteration
GENERAL RENOVATION OF EXISTING 4-STORY BUILDING. NEW HVAC SPLIT-UNIT SYSTEM THROUGHOUT BUILDING. NEW VENTILATION SYSTEM FOR KITCHENETTES AND BATHROOMS. ALL FIXTURES WILL BE ELECTRICAL, NO GAS.
B00278514-I1
05/25/2022
Permit issued — Sprinklers
B00289194-I1-EW-SP
05/24/2022
Signed off — Alteration
B00278470-I1
05/20/2022
Filed — Alteration
GENERAL RENOVATION OF EXISTING 4-STORY BUILDING. NEW HVAC SPLIT-UNIT SYSTEM THROUGHOUT BUILDING. NEW VENTILATION SYSTEM FOR KITCHENETTES AND BATHROOMS. ALL FIXTURES WILL BE ELECTRICAL, NO GAS.
B00278514-P3
05/20/2022
Special inspection requirement — Mechanical Systems
ANTHONY CUCICH
05/20/2022
Special inspection requirement — Final
ANTHONY CUCICH
05/20/2022
Special inspection requirement — Shutoff dampers
ANTHONY CUCICH
05/20/2022
Special inspection requirement — Maintenance information
ANTHONY CUCICH
05/20/2022
Special inspection requirement — HVAC insulation and sealing
ANTHONY CUCICH
05/20/2022
Special inspection requirement — HVAC and service water heating equipment
ANTHONY CUCICH
05/20/2022
Special inspection requirement — HVAC and service water heating system controls
ANTHONY CUCICH
05/20/2022
Special inspection requirement — Electrical energy consumption
ANTHONY CUCICH
05/20/2022
Special inspection requirement — Electrical motors
ANTHONY CUCICH
05/16/2022
Signed off — Alteration
B00332302-I1
05/04/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/21/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/07/2022
Filed — Alteration
GENERAL RENOVATION OF EXISTING 4-STORY BUILDING. NEW HVAC SPLIT-UNIT SYSTEM THROUGHOUT BUILDING. NEW VENTILATION SYSTEM FOR KITCHENETTES AND BATHROOMS. ALL FIXTURES WILL BE ELECTRICAL, NO GAS.
B00278514-P1
04/01/2022
Signed off — Alteration
B00257579-I1
03/31/2022
Signed off — Alteration
B00295773-I1
03/23/2022
Special inspection requirement — Final
ANTHONY CUCICH
03/23/2022
Special inspection requirement — Electrical motors
ANTHONY CUCICH
03/23/2022
Special inspection requirement — Shutoff dampers
ANTHONY CUCICH
03/23/2022
Special inspection requirement — Maintenance information
ANTHONY CUCICH
03/23/2022
Special inspection requirement — HVAC and service water heating system controls
ANTHONY CUCICH
03/23/2022
Special inspection requirement — HVAC and service water heating equipment
ANTHONY CUCICH
03/23/2022
Special inspection requirement — HVAC insulation and sealing
ANTHONY CUCICH
03/23/2022
Special inspection requirement — Electrical energy consumption
ANTHONY CUCICH
03/23/2022
Special inspection requirement — Mechanical Systems
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY CUCICH
03/18/2022
Special inspection requirement — HVAC and service water heating equipment
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Maintenance information
ANTHONY CUCICH
03/18/2022
Special inspection requirement — HVAC and service water heating system controls
ANTHONY CUCICH
03/18/2022
Special inspection requirement — Electrical energy consumption
ANTHONY CUCICH
03/10/2022
Filed — Alteration
B00278470-P1
03/03/2022
Permit issued — Mechanical Systems
B00278514-I1-MS
03/03/2022
Permit issued — Structural
B00295773-I1-ST
03/01/2022
Filed — Alteration
B00295773-P2
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
02/18/2022
Special inspection requirement — HVAC and service water heating system controls
ANTHONY CUCICH
02/18/2022
Special inspection requirement — Maintenance information
ANTHONY CUCICH
02/18/2022
Special inspection requirement — Electrical energy consumption
ANTHONY CUCICH
02/01/2022
Permit issued — Sprinklers
B00289194-I1-EW-SP
01/25/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00628376-P1
12/01/2021
Filed — Alteration
B00289194-I1
11/12/2021
Permit issued — Supported Scaffold
B00628376-I1-SF
11/12/2021
Permit issued — Structural
B00295773-I1-ST
11/10/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00628376-I1
11/10/2021
Permit issued — Mechanical Systems
B00278514-I1-MS
11/08/2021
Violation issued (ECB, closed)
Unknown
11/08/2021
Violation issued (ECB, closed)
Construction
11/08/2021
Violation issued (ECB, closed)
Unknown
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC05/25/2022
DOB NOWMechanical SystemsSigned-offACCRETE CONSTRUCTION GROU03/03/2022
DOB NOWStructuralSigned-offACCRETE CONSTRUCTION GROU03/03/2022
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC02/01/2022
DOB NOWSupported ScaffoldSigned-offAMS CONTRACTOR INC11/12/2021
DOB NOWStructuralSigned-offACCRETE CONSTRUCTION GROU11/12/2021
DOB NOWMechanical SystemsSigned-offACCRETE CONSTRUCTION GROU11/10/2021
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC07/29/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN06/22/2021
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO02/24/2021
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO12/23/2020
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO10/23/2020
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC07/17/2020
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC03/17/2020
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO11/21/2019
BIS—ISSUEDNYC BUILDING SOLUTIONS CO02/04/2022
BIS—ISSUEDNYC BUILDING SOLUTIONS CO06/29/2021
BIS—ISSUEDNYC BUILDING SOLUTIONS CO04/28/2021
BISOTISSUEDNYC BUILDING SOLUTIONS CO12/23/2020
BISOTISSUEDNYC BUILDING SOLUTIONS CO01/26/2020
3 projects · most recent 06/23/2022
General Wiring
FiledStatusContractorScope
06/23/2022CompleteK.A.B. ELECTRIC CORP—
04/13/2021CompleteK.A.B. ELECTRIC CORPGeneral Wiring
03/14/2020CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/14/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
05/20/2022Mechanical SystemsANTHONY CUCICHspecial
05/20/2022FinalANTHONY CUCICHprogress
05/20/2022Shutoff dampersANTHONY CUCICHenergy_progress
05/20/2022Maintenance informationANTHONY CUCICHenergy_progress
05/20/2022HVAC insulation and sealing ANTHONY CUCICHenergy_progress
05/20/2022HVAC and service water heating equipment ANTHONY CUCICHenergy_progress
05/20/2022HVAC and service water heating system controls ANTHONY CUCICHenergy_progress
05/20/2022Electrical energy consumptionANTHONY CUCICHenergy_progress
05/20/2022Electrical motorsANTHONY CUCICHenergy_progress
03/23/2022FinalANTHONY CUCICHprogress
03/23/2022Electrical motorsANTHONY CUCICHenergy_progress
03/23/2022Shutoff dampersANTHONY CUCICHenergy_progress
03/23/2022Maintenance informationANTHONY CUCICHenergy_progress
03/23/2022HVAC and service water heating system controls ANTHONY CUCICHenergy_progress
03/23/2022HVAC and service water heating equipment ANTHONY CUCICHenergy_progress
03/23/2022HVAC insulation and sealing ANTHONY CUCICHenergy_progress
03/23/2022Electrical energy consumptionANTHONY CUCICHenergy_progress
03/23/2022Mechanical SystemsANTHONY CUCICHspecial
03/18/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationANTHONY CUCICHspecial
03/18/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesANTHONY CUCICHspecial
03/18/2022Fire-Resistant Penetrations and JointsANTHONY CUCICHspecial
03/18/2022Fire-Resistance Rated ConstructionANTHONY CUCICHprogress
03/18/2022Energy Code Compliance InspectionsANTHONY CUCICHprogress
03/18/2022HVAC and service water heating equipment ANTHONY CUCICHenergy_progress
03/18/2022Maintenance informationANTHONY CUCICHenergy_progress
Latest 25 of 44.
▾Documents — 204 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00278514-P1Request digital key ↗
09/02/2026B00278514-I1Request digital key ↗
08/15/2026B00278514-P3Request digital key ↗
▸DOB NOWPlans/Sketch2
08/31/2026B00628376-I1Request digital key ↗
08/31/2026B00628376-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00278470-P1Request digital key ↗
09/02/2026B00278470-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00295773-I1Request digital key ↗
08/15/2026B00295773-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00257579-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00332302-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/31/2026B00289194-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION16
11/17/2022321596162Open ↗
10/12/2022321596162Open ↗
05/18/2022321596162Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION8
02/05/2022321596162Open ↗
01/03/2022321596162Open ↗
06/29/2021321596162Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/22/2022340725754Open ↗
10/06/2021340725754Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
01/25/2021321596162Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
04/20/2021321596162Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
04/20/2021321596162Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING EXHIBIT I: CERTIFICATION2
06/07/2021322096101Open ↗
10/02/2020321596162Open ↗
▸BISZONING DIAGRAM2
01/25/2022321596162Open ↗
04/20/2021321596162Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
06/07/2021322096101Open ↗
10/02/2020321596162Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/07/2021322096101Open ↗
▸BISVERIFY TAX LOT1
12/19/2022321596162Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/28/2021321596162Open ↗
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026B00278470-P1Open ↗
09/01/2026B00278470-P1Open ↗
09/01/2026B00278470-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00628376-I1Open ↗
08/31/2026B00628376-P1Open ↗
08/13/2026B00289194-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00278470-P1Open ↗
09/01/2026B00278470-P1Open ↗
09/01/2026B00278470-P1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/27/2020340725754Open ↗
11/26/2019340704205Open ↗
▸Trade Schedules & Equipment5
▸BISFA - FDNY APPROVAL : FD-FAA1
12/27/2022321596162Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/22/2022321596162Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/22/2022321596162Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/27/2022321596162Open ↗
▸BISWATER METER PERMIT : DEP-METER1
08/19/2022321596162Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
10/06/2021340725754Open ↗
08/25/2020321596162Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/20/2021321596162Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/26/2020340704205Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026B00278470-I1Open ↗
08/13/2026B00295773-I1Open ↗
08/13/2026B00278514-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/23/2020321596162Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/25/2021321596162Open ↗
09/23/2020321596162Open ↗
09/23/2020321596162Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
03/28/2022321596162Open ↗
▸BISINTERIOR LIGHTING POWER1
03/28/2022321596162Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/28/2022321596162Open ↗
▸BISFENESTRATION AREAS1
03/28/2022321596162Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/28/2022321596162Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/28/2022321596162Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/24/2022321596162Open ↗
▸BISLIGHTING CONTROLS1
03/28/2022321596162Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/22/2022321596162Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/28/2022321596162Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00278470-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/21/2021340704205Open ↗
01/25/2021321596162Open ↗
01/25/2021321596162Open ↗
Showing 3 of 8 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
03/28/2022321596162Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
09/23/2020321596162Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/22/2022321596162Open ↗
▸BISMASONRY1
03/28/2022321596162Open ↗
▸BISSOIL REPORT1
09/23/2020321596162Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/23/2020321596162Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE5
11/17/2022321596162Open ↗
10/19/2022321596162Open ↗
05/17/2022321596162Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/25/2022321596162Open ↗
10/06/2021340725754Open ↗
01/26/2020340704205Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/21/2021340704205Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE4
02/05/2022321596162Open ↗
04/29/2021321596162Open ↗
01/25/2021321596162Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT3
09/21/2021340704205Open ↗
09/23/2020321596162Open ↗
11/26/2019340704205Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
02/05/2022321596162Open ↗
04/29/2021321596162Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/28/2022321596162Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION11
05/23/2022321596162Open ↗
05/23/2022321596162Open ↗
03/29/2022321596162Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/27/2020340725754Open ↗
11/26/2019340704205Open ↗
▸BISEFILING COVER SHEET2
05/14/2021322096101Open ↗
03/06/2020321596162Open ↗
▸Other Documents11
▸BISPLOT DIAGRAM2
10/28/2021321596162Open ↗
10/02/2020321596162Open ↗
▸BISSHUTOFF DAMPERS1
03/28/2022321596162Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/28/2020321596162Open ↗
▸BISLOWEST FLOOR ELEVATION1
03/28/2022321596162Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/02/2020321596162Open ↗
▸BISMAINTENANCE INFORMATION1
03/28/2022321596162Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/07/2021322096101Open ↗
▸BISTCO - Supporting Documents1
09/07/2022321596162Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
03/28/2022321596162Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/28/2022321596162Open ↗