← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
301 East 66th Condominium
301 EAST 66 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1044738
💬 Discuss this project
1956Year Built
16Stories
RMBuilding Class
C2-8Zoning
208,802 sfGross Floor Area
202Units
LL97 CoveredRent Stabilized34 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 301/66 OWNERS CORP. · 20,083 sf lot · 10.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 6 docs
Floor 1Under Construction2 filings · 7 docs
CellarUnder Construction4p · 4 filings · 7 docs
Site & exteriorUnder Construction5 filings · 14 docs
Filed — no permit issued2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OSSA PROPERTIES8009/13/2026
PENN SOUTH CAPITAL MANAGEMENT707/08/2026
GUL G CONTRACTING707/08/2026
BLUESTONE CONSTRUCTION407/08/2026
301 E 66 CONDO ASSOC403/21/2026
301 EAST 66TH ST CONDOMINIMUM403/21/2026
301 EAST 66TH303/21/2026
301 EAST 66TH CONDO ASSC303/21/2026
ALPHA GROUP NY1106/28/2026
301 E 66 ST CONDO ASSOCIATION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VMARCHDESIGN203/21/2026
PENN SOUTH CAPITAL MANAGEMENT403/21/2026
DANICO SERVICES403/21/2026
BUILDING BROTHERS203/21/2026
TAG TEAM GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MODERN DREAM CONSTRUCTIONGeneral Contractor407/08/2026
JOEUNE INTERIOR INCGeneral Contractor303/21/2026
TCR RESTORATION & CONST*General Contractor307/04/2026
CS BRIDGE CORPGeneral Contractor304/09/2026
EAST COAST MECHNACIAL LLCPlumbing207/08/2026
KILO WATT ELECTRIC CORPElectrical203/22/2026
GUL & G CONTRACTING INCGeneral Contractor207/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
FRANK LA GREGAElectrical103/21/2026
ACTIVE SIGNSScaffold107/08/2026
JAY UNITED ELECL CONTNG CElectrical103/22/2026
NATIONAL MAINTENANCE INCElectrical103/21/2026
RYAN JOSEPHElectrical103/21/2026
ALPHA GROUP NY1 CORPGeneral Contractor106/28/2026
COMMANDO CONTRACTING CORPGeneral Contractor107/08/2026
EAST COAST PETROLEUM INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMKA & ASSOCIATES LLC8239405/05/2026
ROBERT F. GERMAIN JR. PE5100812/31/2025
EMPIRE DESIGN CORP5474106/16/2025
AA BUILDING & INSPECTION1519208/06/2024
VAKOTA ARCHITECTURE7281108/24/2022
CHONG ENGINEERING P.C.7411111/17/2021
Building Lifecycle
All (173)Filed (24)Permit Issued (21)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (15)Objection (2)Special Inspection (30)
07/02/2026
Permit issued — General Construction
M01178284-I1-GC
05/28/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01406349-I1
05/28/2026
Permit issued — Suspended Scaffold
M01241442-I1-SC
05/28/2026
Permit issued — General Construction
M00931534-S1-GC
05/28/2026
Permit issued — Supported Scaffold
M01406349-I1-SF
05/26/2026
Signed off — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-S2
05/26/2026
Signed off — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-S1
05/22/2026
Signed off — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-I1
05/20/2026
Objection resolved — Addressed
05/08/2026
Objection raised — Scope
05/05/2026
Filed — Alteration
Concrete repairs at the vehicle garage including slab on grade, beam encasement, and overhead slab repairs. No change to use, egress, or occupancy.
M01389352-I1
04/29/2026
Violation issued (HPD, closed)
A
04/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
04/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
AHMAD KHANZADA
04/17/2026
Special inspection requirement — Final
AHMAD KHANZADA
04/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Cycle 9 facade report signed — SWARMP
03/20/2026
Cycle 9 facade inspection completed
03/12/2026
Permit issued — Structural
M01178284-S1-GC-CX
02/09/2026
Cycle 9 facade report submitted
01/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2026
Permit issued — Sidewalk Shed
M01180843-I1-SH
01/12/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/31/2025
Filed — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-S3
12/16/2025
Filed — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-P5
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/15/2025
Filed — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-P3
12/15/2025
Filed — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-P4
12/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
12/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/15/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/15/2025
Special inspection requirement — Final
Robert Germain Jr.
12/12/2025
Filed — Alteration
NEW CHIMNEY LINER AND NEW BREECHING AS PER PLANS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01236831-P2
12/11/2025
Special inspection requirement — Final
Robert Germain Jr.
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/11/2025
Special inspection requirement — Chimneys and vents
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
12/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
08/25/2025
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01180843-P1
08/11/2025
Permit issued — Plumbing
M01236831-S1-PL
07/24/2025
Violation issued (ECB, closed)
Construction
07/24/2025
Violation issued (ECB, closed)
Cranes and Derricks
07/24/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTCR RESTORATION & CONST*07/02/2026
DOB NOWSuspended ScaffoldPermit IssuedTCR RESTORATION & CONST05/28/2026
DOB NOWGeneral ConstructionPermit IssuedMODERN DREAM CONSTRUCTION05/28/2026
DOB NOWSupported ScaffoldPermit IssuedALPHA GROUP NY1 CORP05/28/2026
DOB NOWStructuralPermit IssuedTCR RESTORATION & CONST*03/12/2026
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP01/20/2026
DOB NOWPlumbingSigned-offEAST COAST MECHNACIAL LLC08/11/2025
DOB NOWBoiler EquipmentSigned-offEAST COAST PETROLEUM INC07/14/2025
DOB NOWPlumbingSigned-offEAST COAST MECHNACIAL LLC07/14/2025
DOB NOWGeneral ConstructionSigned-offEAST COAST PETROLEUM INC07/10/2025
DOB NOWGeneral ConstructionPermit IssuedTCR RESTORATION & CONST*07/07/2025
DOB NOWSuspended ScaffoldPermit IssuedTCR RESTORATION & CONST06/17/2025
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP02/14/2025
DOB NOWGeneral ConstructionPermit IssuedMODERN DREAM CONSTRUCTION08/27/2024
DOB NOWGeneral ConstructionPermit IssuedMODERN DREAM CONSTRUCTION06/04/2024
DOB NOWSignSigned-offACTIVE SIGNS INC04/15/2024
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC08/30/2022
DOB NOWGeneral ConstructionSigned-offCOMMANDO CONTRACTING CORP08/29/2022
DOB NOWGeneral ConstructionPermit IssuedJOEUNE INTERIOR INC11/30/2021
DOB NOWSidewalk ShedPermit IssuedGUL & G CONTRACTING INC09/22/2020
DOB NOWSupported ScaffoldPermit IssuedGUL & G CONTRACTING INC09/22/2020
BISOTISSUEDMODERN DREAM CONSTRUCTION04/11/2025
BISSPISSUEDPASQUALE QUARATINO INC04/11/2025
BISMHISSUEDMODERN DREAM CONSTRUCTION02/07/2025
BISOTISSUEDTCR RESTORATION & CONST*11/20/2020
BISOTISSUEDN DESIGN CORP01/18/2018
BISMHISSUEDHIGH POWER CONSTRUCTION C08/09/2016
BISSPISSUEDTMS PLUMBING & HTG CORP09/09/2011
BISEQISSUEDGUL & G CONSTR. CORP08/24/2011
BISOTISSUEDGUL & G CONSTR. CORP08/24/2011
BISOTISSUEDGUL & G CONSTR. CORP08/24/2011
BISPLISSUEDZARA PLUMBING CORP08/18/2011
BISMHISSUEDEUROPEAN BUILDERS & CONTR08/18/2011
BISEQISSUEDJ. B. CUSTOM MANSORY & CO08/11/2011
BISOTISSUEDJ. B. CUSTOM MANSORY & CO08/08/2011
BISOTISSUEDMK CUSTOM BUILDERS CORP07/28/2011
BISPLISSUEDTT MECHANICAL CORP04/06/2010
BISOTISSUEDRICHFIELD ENTERPRISE INC03/31/2010
BISEQISSUEDEVEREST SCAFFOLDING INC02/04/2008
BISOTISSUEDPHASE 2 CONSTRUCTION CORP.12/14/2007
+ 31 more permits on file
2 projects · most recent 12/31/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/31/2025Signed-offEAST COAST MECHNACIAL LLCGas
08/24/2022Signed-offGREGG NY PLUMBING, INCWater/Sanitary
7 projects · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025Permit IssuedJAY UNITED ELECL CONTNG CGeneral Wiring
03/20/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
02/13/2025Permit IssuedNASH ELECTRIC SERVICES IN—
05/20/2022Pending PaymentKILO WATT ELECTRIC CORPGeneral Wiring
05/04/2022Permit IssuedKILO WATT ELECTRIC CORPGeneral Wiring
03/15/2022Pending PaymentKILO WATT ELECTRIC CORPGeneral Wiring
12/05/2017Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
2 projects · most recent 05/05/2026
Concrete Steel
FiledStatusContractorScope
05/05/2026——Concrete
03/22/2025Permit IssuedTCR RESTORATION & CONST*Steel
3 projects · most recent 05/28/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/28/2026Permit IssuedALPHA GROUP NY1 CORPScaffold
08/25/2025Permit IssuedCS BRIDGE CORPSidewalk Shed
09/21/2020Permit IssuedGUL & G CONTRACTING INCSidewalk Shed
1 project · most recent 06/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/16/2025Permit IssuedTCR RESTORATION & CONSTSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2026Pass-Final Boiler Equipment InspectionPassView ↗
12/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/10/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
04/27/2026Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
04/27/2026Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
04/17/2026FinalAHMAD KHANZADAprogress
12/16/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
12/16/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/15/2025HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
12/15/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
12/15/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/15/2025HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
12/15/2025HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
12/15/2025Tenant Protection Plan Compliance—special
12/15/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/15/2025Chimneys and ventsRobert Germain Jr.special
12/15/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
12/15/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/15/2025FinalRobert Germain Jr.progress
12/11/2025FinalRobert Germain Jr.progress
12/11/2025Tenant Protection Plan Compliance—special
12/11/2025HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
12/11/2025HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
12/11/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/11/2025Chimneys and vents—special
12/11/2025Tenant Protection Plan Compliance—special
12/11/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/11/2025Tenant Protection Plan Compliance—special
Latest 25 of 39.
▾Documents — 364 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch22
09/03/2026M00616324-I1Request digital key ↗
09/02/2026M00798063-I1Request digital key ↗
09/02/2026M00798051-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00401654-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00401655-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION45
10/11/2024120873750Open ↗
10/08/2024120743981Open ↗
10/08/2024120743972Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION18
04/14/2025120743972Open ↗
04/14/2025120743963Open ↗
04/01/2025120743963Open ↗
Showing 3 of 18 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
11/20/2020140886067Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
11/20/2020140886067Open ↗
▸BISEQUIPMENT (EQ) PERMITS1
07/03/2025120743972Open ↗
▸Seals & Professional Certifications81
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026M00616324-I1Open ↗
08/27/2026M01021016-I1Open ↗
08/26/2026M00931534-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
12/06/2019123793074Open ↗
01/08/2018123132966Open ↗
04/05/2017123038550Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/29/2026M01236831-P4Open ↗
08/28/2026M01236831-S1Open ↗
08/28/2026M01236831-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026M01236831-P4Open ↗
08/26/2026M00798051-I1Open ↗
08/24/2026M01389352-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/08/2018123132966Open ↗
02/04/2016122669077Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/28/2020140946216Open ↗
01/08/2018123132966Open ↗
04/04/2017123038550Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/28/2020140946216Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS6
07/11/2025120743972Open ↗
07/11/2025120743972Open ↗
07/11/2025120743972Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
04/04/2012120743972Open ↗
03/12/2012120743972Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
07/02/2024121442867Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/18/2025120743972Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/18/2025120743972Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
03/05/2020140886067Open ↗
01/08/2018123132966Open ↗
08/28/2020140946216Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00401654-I1Open ↗
08/13/2026M00401655-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00931534-I1Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/03/2026M00616324-I1Open ↗
08/26/2026M00931534-S1Open ↗
08/26/2026M00931534-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/05/2020140886067Open ↗
12/06/2019123793074Open ↗
01/08/2018123132966Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
11/28/2012121442867Open ↗
10/26/2011120873750Open ↗
10/26/2011120873750Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/06/2019123793074Open ↗
01/08/2018123132966Open ↗
04/05/2017123038550Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/16/2022123132966Open ↗
01/19/2021140886067Open ↗
11/01/2016122669077Open ↗
▸BISEXTERIOR LIGHTING POWER2
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/30/2025120743972Open ↗
08/23/2024120743963Open ↗
▸BISINTERIOR LIGHTING POWER2
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/19/2021140886067Open ↗
11/20/2020140886067Open ↗
▸BISFENESTRATION AREAS2
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BISFENESTRATION AIR LEAKAGE2
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* DUCT LEAKAGE TESTING1
04/18/2025120743972Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00616324-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/20/2024120743981Open ↗
08/20/2024120743972Open ↗
08/20/2024120743963Open ↗
Showing 3 of 9 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
04/18/2025120743972Open ↗
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BIS* EXIT SIGNS2
08/23/2024120743963Open ↗
08/23/2024120743963Open ↗
▸BISMECHANICAL SYSTEMS1
04/18/2025120743972Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/23/2024120743981Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
07/07/2025120743972Open ↗
04/30/2025120743963Open ↗
03/25/2025120873750Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
11/28/2012121442867Open ↗
10/26/2011120873750Open ↗
Showing 2 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/11/2025120743972Open ↗
07/09/2024123793074Open ↗
11/01/2016122669077Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
04/14/2025120743972Open ↗
04/14/2025120743963Open ↗
02/07/2025120743972Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
10/13/2015122110731Open ↗
08/31/2015122110731Open ↗
08/31/2015122110731Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
08/23/2024120743981Open ↗
08/23/2024120743972Open ↗
08/23/2024120743963Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
04/25/2025120743963Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
07/03/2025120743972Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/17/2026M01406349-I1Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT21
07/09/2024121442867Open ↗
07/09/2024121442867Open ↗
12/16/2022123132966Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
02/01/2025120873750Open ↗
02/01/2025120743981Open ↗
01/30/2025120743972Open ↗
Showing 3 of 4 on file for this type
▸BISINSURANCE: WORKERS' COMPENSATION1
03/12/2025120873750Open ↗
▸BISINSURANCE: DISABILITY1
03/12/2025120873750Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET10
12/06/2019123793074Open ↗
01/08/2018123132966Open ↗
04/05/2017123038550Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION4
04/21/2020140886067Open ↗
03/05/2020140886067Open ↗
Showing 2 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/28/2020140946216Open ↗
03/05/2020140886067Open ↗
▸BISBOROUGH INTAKE FORM1
04/14/2025120743972Open ↗
▸Other Documents8
▸BISDHCR DOCUMENT4
03/05/2025120873750Open ↗
02/10/2025120743981Open ↗
02/06/2025120743972Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
07/14/2014122059191Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01241442-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01241442-I1Open ↗