← Back
BuildNYC
Public elementary, junior or senior high
Collegiate School
301 FREEDOM PLACE SOUTH · BIN 1089703
💬 Discuss this project
2016Year Built
9Stories
W1Building Class
R10Zoning
179,863 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Public elementary, junior or senior high · Owner of record: 301 Freedom Place South · 29,638 sf lot · 6.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsCollegiate School1 filing
RoofCollegiate School2p · 2 filings · 2 docs
Floor 10Collegiate School1 filing · 2 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Collegiate School1 filing · 5 docs
Floor 4Collegiate School1 filing · 5 docs
Floor 3Collegiate School1 filing · 5 docs
Floor 2Collegiate School1 filing · 5 docs
Floor 1Collegiate School9p · 6 filings · 13 docs
CellarCollegiate School1 filing · 5 docs
Site & exteriorCollegiate School1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
301 Freedom Place South103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2015$25.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Geiger E A Group603/21/2026
Milrose Consultants203/21/2026
Maai Marsh Architects703/21/2026
Howard L Zimmerman Architects203/21/2026
KM Associates of New York103/21/2026
Riggining Consultants103/21/2026
Louis Striar203/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tristate Plumbing ServicesPlumbing407/08/2026
AciscoGeneral Contractor303/21/2026
ExlGeneral Contractor303/21/2026
Nucor ConstructionGeneral Contractor307/08/2026
Metro Mechanical GroupFire Protection207/08/2026
Nash Electric ServicesElectrical103/21/2026
MC SuperstructureScaffold104/09/2026
Metro Mechanical GroupGeneral Contractor103/21/2026
Metro Mechanical GroupPlumbing110/04/2026
Gatoff MichaelGeneral Contractor103/21/2026
Cad Signs NYCSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712101/22/2025
Alan Margolin & Associates423108/01/2024
Joseph Martines PE1428303/20/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/17/2026
Objection raised — Inspections
08/25/2026
Filed — Alteration
9th Cycle FISP Repair. No change to use, occupancy, or egress.
M01446337-I1
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
08/14/2026
Special inspection requirement — Final
114 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTristate Plumbing Services02/26/2025
DOB NOWSidewalk ShedSigned-offMC Superstructure02/05/2025
DOB NOWGeneral ConstructionSigned-offNucor Construction12/03/2024
DOB NOWStructuralSigned-offNucor Construction12/03/2024
DOB NOWGeneral ConstructionSigned-offNucor Construction08/14/2024
DOB NOWMechanical SystemsSigned-offExl02/09/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/28/2023
DOB NOWSprinklersSigned-offMetro Mechanical Group09/07/2023
DOB NOWSprinklersSigned-offMetro Mechanical Group09/07/2022
DOB NOWGeneral ConstructionSigned-offAcisco09/02/2022
DOB NOWSignSigned-offCad Signs NYC03/02/2018
BISPLISSUEDPace Plumbing07/14/2020
BIS—ISSUEDSciame Construction06/09/2020
BISPLISSUEDPace Plumbing06/05/2019
BIS—ISSUEDSciame Construction05/31/2019
BISFSISSUEDNulite Fuel Oil Co10/18/2018
BISPLISSUEDPace Plumbing07/25/2018
BIS—ISSUEDSciame Construction07/13/2018
BIS—ISSUEDSciame Construction05/30/2018
BIS—ISSUEDSciame Construction03/27/2018
BISOTISSUEDFire and Building Code Services02/26/2018
BISEQISSUEDGreg Logistics11/03/2017
BISBLISSUEDNulite Fuel Oil Co10/11/2017
BISFSISSUEDNulite Fuel Oil Co10/11/2017
BISBLISSUEDNulite Fuel Oil Co09/25/2017
BISFSISSUEDPeter Agliardo Contractor09/01/2017
BISEQISSUEDSafway Atlantic08/30/2017
BISEQISSUEDKing Hoist & Scaffolding08/14/2017
BISEQISSUEDSciame Construction08/01/2017
BISBLISSUEDNulite Fuel Oil Co07/26/2017
BIS—ISSUEDSciame Construction06/27/2017
BISEQISSUEDSafway Atlantic05/25/2017
BIS—ISSUEDSciame Construction05/25/2017
BISFSISSUEDPeter Agliardo Contractor04/25/2017
BISFPISSUEDFiremasters04/13/2017
BISEQISSUEDSafway Atlantic03/30/2017
BISEQISSUEDSafway Atlantic03/30/2017
BISBLISSUEDNulite Fuel Oil Co03/30/2017
BISSDISSUEDSirina Fire Protection02/23/2017
BIS—ISSUEDSciame Construction01/26/2017
+ 17 more permits on file
1 project · most recent 11/16/2020
Heating Systems
FiledStatusContractorScope
11/16/2020——Heating Systems
2 projects · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteNash Electric Services—
08/24/2022CompleteRichard NeuGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/14/2026Energy Code Compliance Inspections—progress
08/14/2026Final—progress
08/14/2026Post-installed Anchors—special
08/14/2026Air barrier - visual inspection—energy_progress
01/22/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
03/14/2023Sprinkler SystemsJOSEPH MARTINESspecial
03/14/2023Fire-Resistant Penetrations and JointsJOSEPH MARTINESspecial
09/28/2022Lighting controlsJOSEPH MARTINESenergy_progress
09/28/2022FinalJOSEPH MARTINESprogress
09/28/2022Interior lighting powerJOSEPH MARTINESenergy_progress
11/11/2020Maintenance information—energy_progress
11/11/2020HVAC insulation and sealing —energy_progress
11/11/2020Electrical motors—energy_progress
11/11/2020Final—progress
11/11/2020Mechanical Systems—special
12/13/2017FinalNORMAN LOKprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Collegiate SchoolEducationEntire building
Project M01446337 Alteration · Objections · 08/25/2026
Project M01159399 Alteration · LOC Issued · 02/05/2025
Project M01170406 Alteration · LOC Issued · 01/22/2025
Project M01083954 Alteration · LOC Issued · 08/01/2024
Project M01044631 Alteration · LOC Issued · 06/04/2024
Project M00977795 Alteration · LOC Issued · 12/22/2023
Project M00786514 Alteration · LOC Issued · 08/25/2022
Project M00787514 Alteration · LOC Issued · 08/25/2022
Project M00787519 Alteration · LOC Issued · 08/25/2022
Project M00787526 Alteration · LOC Issued · 08/25/2022
Project M00426874 Alteration · Approved · 11/16/2020
Project M00005431 Alteration · LOC Issued · 02/26/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
666 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account