Three families
301 HART STREET
BROOKLYN · BIN 3043029
💬 Discuss this project
1931Year Built
2Stories
C0Building Class
R6BZoning
1,440 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Three families · Owner of record: CROWN HART LLC · 1,600 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction25p · 2 filings · 20 docs
PenthouseUnder Construction18p · 1 filing · 20 docs
Floor 3Under Construction24p · 2 filings · 20 docs
Floor 2Under Construction25p · 2 filings · 20 docs
Floor 1Under Construction26p · 2 filings · 20 docs
CellarUnder Construction25p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-BasementUnder Construction22p · 1 filing · 20 docs
1 job · most recent 07/23/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2025——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Oxbox OXBOX J4AC4036A1000A 36,000 BTU · Condensing Unit ×8
Heating
Oxbox OXBOX J801X090BU4SAA 90,000 BTU · Furnace ×8
Ventilation
1 job · most recent 07/23/2025
FiledStatusContractorScope
07/23/2025——50 heads
2 jobs · most recent 12/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/22/2025Permit IssuedRKA PIPING AND HEATINGGas, Storm, Water/Sanitary
07/23/2025———
1 job · most recent 04/02/2023
General Wiring
FiledStatusContractorScope
04/02/2023Permit IssuedINFINITI ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (121)Filed (9)Permit Issued (4)Violation (27)Inspection (12)Objection (39)Special Inspection (30)
08/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2026
Violation issued (HPD, open)
A
04/29/2026
Permit issued — General Construction
B08039121-I1-GC-CX
12/30/2025
Objection raised — Admin
12/22/2025
Filed — Alteration
INTERIOR ALTERATIONS AND RENOVATIONS TO EXISTING APARTMENT BUILDING AS PER PLANS. CONSTRUCT NEW STAIR AND BULKHEAD TO ROOF.
B08039121-P4
10/01/2025
Special inspection requirement — Air barrier - visual inspection
SHAHIN BADALY
10/01/2025
Special inspection requirement — Interior lighting power
SHAHIN BADALY
10/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
10/01/2025
Special inspection requirement — Final
SHAHIN BADALY
10/01/2025
Special inspection requirement — Structural Cold-Formed Steel
SHAHIN BADALY
10/01/2025
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
10/01/2025
Special inspection requirement — Lighting in dwelling units
SHAHIN BADALY
10/01/2025
Special inspection requirement — Lighting controls
SHAHIN BADALY
10/01/2025
Special inspection requirement — Structural Wood Frame
SHAHIN BADALY
10/01/2025
Special inspection requirement — Wood – Seismic Resistance
10/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
10/01/2025
Special inspection requirement — Structural Steel - Details
SHAHIN BADALY
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHIN BADALY
10/01/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHIN BADALY
10/01/2025
Special inspection requirement — Fenestration areas
SHAHIN BADALY
08/05/2025
Permit issued — Structural
B08039121-I1-GC-CX
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/01/2025
Objection raised — Fire_Protection
08/01/2025
Objection raised — Fire_Protection
08/01/2025
Objection raised — Scope
08/01/2025
Objection raised — Cost
07/23/2025
Filed — Alteration CO
NEW MECHANICAL SYSTEM
B00986525-S2
06/20/2025
Special inspection requirement — Lighting in dwelling units
SHAHIN BADALY
06/20/2025
Special inspection requirement — Structural Wood Frame
SHAHIN BADALY
06/20/2025
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
06/20/2025
Special inspection requirement — Air barrier - visual inspection
SHAHIN BADALY
06/20/2025
Special inspection requirement — Structural Steel - Details
SHAHIN BADALY
06/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
06/20/2025
Special inspection requirement — Structural Cold-Formed Steel
SHAHIN BADALY
06/20/2025
Special inspection requirement — Fenestration areas
SHAHIN BADALY
06/20/2025
Special inspection requirement — Wood – Seismic Resistance
SHAHIN BADALY
06/20/2025
Special inspection requirement — Lighting controls
SHAHIN BADALY
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
06/20/2025
Special inspection requirement — Final
SHAHIN BADALY
06/20/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHIN BADALY
06/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
06/19/2025
Filed — Alteration
INTERIOR ALTERATIONS AND RENOVATIONS TO EXISTING APARTMENT BUILDING AS PER PLANS. CONSTRUCT NEW STAIR AND BULKHEAD TO ROOF.
B08039121-P2
06/09/2025
Violation issued (HPD, open)
A
11/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/14/2024
Objection resolved — Addressed
08/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2024
Objection raised — Inspections
08/02/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/11/2024
Filed — Alteration CO
NEW MECHANICAL SYSTEM
B00986525-P1
07/11/2024
Objection resolved — Addressed
06/27/2024
Objection raised — Scope
06/12/2024
Objection resolved — Addressed
Latest 60 of 121 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIOLET HOLDINGS1607/08/2026
CROWN HART LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/30/2022$1.0M—Private party → CROWN HART LLC$694/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ENGINEERING PLLC612/22/2025
VILLA PEX CONSULTING ENGINEERING107/23/2025
BADALY ARCHITECTS204/30/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOKEN HOME IMPROVEMENTGeneral Contractor307/08/2026
RKA PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137812/22/2025
VILLA PEX CONSULTING ENGI8408107/23/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMOKEN HOME IMPROVEMENT04/29/2026
DOB NOWStructuralPermit IssuedMOKEN HOME IMPROVEMENT08/05/2025
DOB NOWPlumbingPermit IssuedRKA PIPING AND HEATING07/05/2023
DOB NOWGeneral ConstructionPermit IssuedMOKEN HOME IMPROVEMENT05/10/2023
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
10/01/2025Insulation placement and R valuesSHAHIN BADALYenergy_progress
10/01/2025Interior lighting powerSHAHIN BADALYenergy_progress
10/01/2025Lighting in dwelling unitsSHAHIN BADALYenergy_progress
10/01/2025Fenestration areasSHAHIN BADALYenergy_progress
10/01/2025Air barrier - visual inspectionSHAHIN BADALYenergy_progress
10/01/2025Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
10/01/2025Lighting controlsSHAHIN BADALYenergy_progress
10/01/2025Structural Wood FrameSHAHIN BADALYprogress
10/01/2025Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
10/01/2025FinalSHAHIN BADALYprogress
10/01/2025Wood – Seismic Resistance—special
10/01/2025Structural Steel - DetailsSHAHIN BADALYspecial
10/01/2025Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
10/01/2025Structural Cold-Formed SteelSHAHIN BADALYspecial
10/01/2025Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
10/01/2025Construction Operations Influencing Adjacent StructuresSHAHIN BADALYspecial
06/20/2025Construction Operations Influencing Adjacent StructuresSHAHIN BADALYspecial
06/20/2025Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
06/20/2025Structural Cold-Formed SteelSHAHIN BADALYspecial
06/20/2025Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
06/20/2025Wood – Seismic ResistanceSHAHIN BADALYspecial
06/20/2025Structural Steel - DetailsSHAHIN BADALYspecial
06/20/2025Structural Wood FrameSHAHIN BADALYprogress
06/20/2025Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
06/20/2025FinalSHAHIN BADALYprogress
Latest 25 of 88.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B08039121-P3Request digital key ↗
08/27/2026B08039121-P2Request digital key ↗
08/27/2026B08039121-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00986525-P1Open ↗
08/13/2026B08039121-P4Open ↗
08/13/2026B08039121-P2Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026B08039121-P2Open ↗
09/01/2026B08039121-P2Open ↗
09/01/2026B08039121-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B08039121-P2Open ↗
08/27/2026B08039121-P1Open ↗
08/27/2026B08039121-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B08039121-P2Open ↗
09/01/2026B08039121-P2Open ↗
09/01/2026B08039121-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00986525-I1Open ↗
08/13/2026B00986525-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00986525-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B08039121-P2Open ↗
08/27/2026B08039121-P1Open ↗
08/27/2026B08039121-S1Open ↗
Showing 3 of 11 on file for this type
▸Other Documents18
▸DOB NOWSite Survey: Initial6
08/13/2026B08039121-P4Open ↗
08/13/2026B00986525-P1Open ↗
08/13/2026B00986525-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026B08039121-P2Open ↗
08/13/2026B08039121-I1Open ↗
08/13/2026B08039121-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00986525-I1Open ↗
08/13/2026B00986525-P1Open ↗
08/13/2026B08039121-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification2
08/26/2026B00986525-P1Open ↗
08/14/2026B00986525-I1Open ↗