← Back
Two family brick
301 SCHENCK AVENUE
BROOKLYN · BIN 3088809
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R5BZoning
2,280 sfGross Floor Area
2Units
Rent Stabilized43 Open Violations 24 unresolved · 19 paperwork only ▸FDNY Report ↗
Two family brick · 2,500 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 24p · 2 filings · 9 docs
Floor 13p · 2 filings · 9 docs
Cellar3p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
021814ASTFNS02103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2020$647K—WILMINGTON SAVINGS FUND SOCIETY , FSB → Private party$284/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMMOND ARCHITECTURE302/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW CODE CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WASOFF PLBG & UTILITY COPlumbing607/08/2026
STAMS CONSTRUCTION CORPGeneral Contractor303/21/2026
ORBIT PLBG & HTG INCPlumbing307/08/2026
ORBIT PLBG HTGGeneral Contractor103/22/2026
Building Lifecycle
All (76)Filed (3)Permit Issued (4)Violation (60)Inspection (9)
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
B
05/30/2025
Violation issued (HPD, open)
A
05/30/2025
Violation issued (HPD, open)
B
12/03/2024
Violation issued (HPD, closed)
I
11/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2024
Permit issued — Plumbing
B00509188-S1-PL
11/28/2023
Violation issued (HPD, closed)
I
05/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2023
Permit issued — Plumbing
B00509188-S1-PL
11/17/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
03/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2022
Filed — Alteration
FILING TO REPLACE (1) GAS METER AND (2) GAS FIXTURES AT CELLAR BOILER ROOM. REPLACE RESIDENTIAL FIXTURES AT FIRST AND SECOND FLOOR KITCHENS AND BATHS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00509188-S1
11/22/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/29/2021
Permit issued — General Construction
B00501715-I1-GC
10/21/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/24/2021
Permit issued — Plumbing
B00509188-I1-PL
04/28/2021
Filed — Alteration
FILING TO REPLACE (1) GAS METER AND (2) GAS FIXTURES AT CELLAR BOILER ROOM. REPLACE RESIDENTIAL FIXTURES AT FIRST AND SECOND FLOOR KITCHENS AND BATHS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00509188-I1
04/28/2021
Filed — Alteration
B00501715-I1
04/21/2021
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
06/24/2015
Violation issued (ECB, open)
Construction
05/09/2015
Violation issued (ECB, open)
Construction
03/28/2015
Violation issued (ECB, open)
Construction
02/08/2015
Violation issued (ECB, open)
Construction
01/13/2015
Violation issued (ECB, open)
Construction
08/19/2014
Violation issued (ECB, open)
Construction
07/23/2014
Violation issued (HPD, open)
B
07/23/2014
Violation issued (HPD, open)
B
07/23/2014
Violation issued (HPD, open)
B
07/23/2014
Violation issued (HPD, open)
B
06/16/2014
Violation issued (ECB, open)
Construction
04/24/2014
Violation issued (ECB, open)
Construction
02/18/2014
Violation issued (ECB, closed)
Construction
12/02/2013
Violation issued (ECB, closed)
Construction
10/18/2013
Violation issued (ECB, open)
Construction
10/18/2013
Violation issued (ECB, open)
Construction
08/13/2013
Violation issued (ECB, open)
Construction
06/17/2013
Violation issued (ECB, open)
Construction
04/09/2013
Violation issued (ECB, open)
Construction
02/05/2013
Violation issued (ECB, open)
Construction
12/18/2012
Violation issued (ECB, closed)
Construction
12/10/2012
Violation issued (ECB, closed)
Construction
10/02/2012
Violation issued (ECB, closed)
Construction
09/19/2012
Violation issued (ECB, closed)
Construction
08/16/2012
Violation issued (ECB, open)
Construction
08/16/2012
Violation issued (ECB, closed)
Construction
06/06/2012
Violation issued (ECB, closed)
Construction
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC05/06/2024
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC05/05/2023
DOB NOWGeneral ConstructionPermit IssuedSTAMS CONSTRUCTION CORP10/29/2021
DOB NOWPlumbingPermit IssuedWASOFF PLBG & UTILITY CO09/24/2021
1 project · most recent 02/09/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/09/2022Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 09/02/2021
General Wiring
FiledStatusContractorScope
09/02/2021CompleteCLAIRMONT ELEC'L CONTR'GGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/21/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00501715-I1Request digital key ↗
08/31/2026B00509188-I1Request digital key ↗
08/31/2026B00509188-S1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00501715-I1Open ↗
08/31/2026B00509188-I1Open ↗
08/31/2026B00509188-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00501715-I1Open ↗
08/31/2026B00509188-S1Open ↗
08/31/2026B00509188-I1Open ↗