← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Lionel Hampton Houses
301 WEST 130TH STREET · BIN 1084087
💬 Discuss this project
1926Year Built
29Stories
D7Building Class
R8Zoning
324,495 sfGross Floor Area
312Units
LL97 CoveredRent Stabilized33 Active Violations 32 unresolved · 1 paperwork only 4 likely answered 4 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: 410 St Nicholas Property · 50,565 sf lot · 6.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVerizon1p · 1 filing · 3 docs
Floor 1Installation of heavy duty sidewalk shed5p · 2 filings · 6 docs
Site & exteriorManagement Office9p · 1 filing · 5 docs
Filed — no permit issued410 St.nicholas Avenue LLC3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
410 St Nicholas2403/22/2026
D-U Fourth Realty Co1103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2016$67.5M—— → —$208/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scherer Design Group111/21/2022
Shahrish Shuvo Engineering107/08/2022
Enthink Engineers108/31/2020
Navi Structural Engineering108/24/2020
Syed Engineering108/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services103/21/2026
M W Expediting203/21/2026
Synergy Building Consultants103/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold1407/08/2026
Riteway USA General ContractingGeneral Contractor504/09/2026
Buildwell GroupScaffold303/21/2026
Amp CommunicationsGeneral Contractor303/21/2026
J.A. Lee Electric ServicesElectrical203/21/2026
Topline GCScaffold107/08/2026
Triple I Electrical Contracting IElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Scherer Design Group7921111/21/2022
Shahrish Shuvo Engineering8524107/08/2022
Building Lifecycle
All (97)Filed (6)Permit Issued (13)Signed Off (1)Facade (FISP) (10)Violation (60)Special Inspection (7)
08/04/2026
Violation issued (ECB, open)
Construction
06/05/2026
Violation issued (ECB, open)
Construction
04/08/2026
Violation issued (HPD, closed)
B
04/08/2026
Violation issued (HPD, open)
B
02/03/2026
Signed off — Alteration
Rehabilitation and repair facade components as per plans. No change to use, egress or occupancy.
M00714391-I1
11/24/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, open)
A
11/05/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, open)
A
10/31/2025
Violation issued (ECB, closed)
Construction
10/01/2025
Permit issued — Sidewalk Shed
M00392568-I1-SH
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
C
02/20/2025
Cycle 9 facade report submitted
02/20/2025
Cycle 9 facade report signed — SWARMP
02/05/2025
Cycle 9 facade inspection completed
01/23/2025
Permit issued — Structural
M00714391-I1-ST
10/30/2024
Permit issued — Sidewalk Shed
M00392568-I1-SH
08/28/2024
Violation issued (ECB, closed)
Elevators
08/14/2024
Permit issued — Suspended Scaffold
M01089452-I1-SC
08/01/2024
Filed — Alteration
M01089452-I1
07/31/2024
Permit issued — Structural
M00714391-I1-ST
07/31/2024
Violation issued (HPD, closed)
B
07/31/2024
Violation issued (HPD, closed)
B
07/31/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
B
06/18/2024
Violation issued (ECB, closed)
Construction
06/18/2024
Violation issued (ECB, closed)
Unknown
05/31/2024
Violation issued (HPD, closed)
C
05/31/2024
Violation issued (HPD, closed)
C
05/21/2024
Violation issued (HPD, closed)
B
05/21/2024
Violation issued (HPD, closed)
A
05/21/2024
Violation issued (HPD, closed)
B
04/11/2024
Violation issued (ECB, closed)
Local Law
01/22/2024
Violation issued (HPD, closed)
B
01/22/2024
Violation issued (HPD, closed)
B
01/04/2024
Violation issued (ECB, closed)
Construction
12/19/2023
Violation issued (HPD, closed)
B
11/29/2023
Permit issued — Sidewalk Shed
M00392568-I1-SH
09/17/2023
Permit issued — Structural
M00714391-I1-ST
08/01/2023
Violation issued (HPD, closed)
C
06/25/2023
Violation issued (HPD, closed)
C
06/01/2023
Violation issued (HPD, closed)
B
06/01/2023
Violation issued (HPD, closed)
A
06/01/2023
Violation issued (HPD, closed)
B
06/01/2023
Violation issued (HPD, closed)
B
06/01/2023
Violation issued (HPD, closed)
B
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2023
Permit issued — Antenna
M00718971-I1-AN
11/21/2022
Filed — Alteration
M00718971-I1
11/03/2022
Permit issued — Sidewalk Shed
M00392568-I1-SH
10/26/2022
Violation issued (ECB, closed)
Local Law
10/19/2022
Violation issued (HPD, closed)
B
10/19/2022
Violation issued (HPD, closed)
B
09/07/2022
Violation issued (ECB, closed)
Elevators
07/29/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises10/01/2025
DOB NOWStructuralSigned-offRiteway USA General Contracting01/23/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises10/30/2024
DOB NOWSuspended ScaffoldPermit IssuedBig Apple Renovating & Co08/14/2024
DOB NOWStructuralSigned-offRiteway USA General Contracting07/31/2024
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises11/29/2023
DOB NOWStructuralSigned-offRiteway USA General Contracting09/17/2023
DOB NOWAntennaPermit IssuedAmp Communications02/04/2023
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises11/03/2022
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises10/12/2021
DOB NOWSidewalk ShedPermit IssuedTopline GC10/26/2020
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises09/02/2020
DOB NOWSidewalk ShedPermit IssuedBuildwell Group08/03/2020
BISPLISSUEDNophier Plumbing & Heating03/14/2022
BISOTISSUEDEuro T.I04/21/2021
BISPLISSUEDCam Energy Heating and Me04/15/2019
BISPLISSUEDNophier Plumbing & Heating03/21/2019
BIS—ISSUEDEuro T.I02/25/2019
BISOTISSUEDEuro T.I02/25/2019
BISOTISSUEDSteel Tone Construction03/13/2018
BISPLISSUEDTop Plumbing Group03/13/2018
BISOTISSUEDJ.A. Lee Electric02/17/2017
BISPLISSUEDNophier Plumbing & Heating10/11/2016
BISPLISSUEDNophier Plumbing & Heating10/11/2016
BISOTISSUEDHH Building Consulting09/26/2016
BISOTISSUEDHH Building Consulting09/26/2016
BISOTISSUEDHH Building Consulting09/16/2016
BISOTISSUEDHH Building Consulting05/26/2015
BISOTISSUEDHH Building Consulting05/26/2015
BISOTISSUEDHH Building Consulting04/24/2015
BISOTISSUEDEast Coast Petroleum10/26/2012
BISPLRE-ISSUEDEast Coast Mechanical10/26/2012
BISEQISSUEDCS Bridge07/10/2012
BISPLISSUEDDarci Plumbing Co08/11/2010
BISPLISSUEDDarci Plumbing Co04/17/2009
BISPLISSUEDDarci Plumbing Co03/04/2008
BISOTISSUEDVmma Construction12/11/2007
BISOTISSUEDVmma Construction08/02/2007
BISPLISSUEDDarci Plumbing Co03/16/2007
BISEQISSUEDEverest Scaffolding01/26/2007
+ 4 more permits on file
3 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026Permit IssuedDenali Electric—
07/31/2020Permit IssuedRichard Neu—
06/06/2019CompleteKJK ElectricGeneral Wiring
2 projects · most recent 08/24/2020
Sidewalk Shed
FiledStatusContractorScope
08/24/2020——Sidewalk Shed
08/01/2020Permit IssuedBuildwell NYSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/08/2022Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
04/07/2022MasonryShahrish Shuvospecial
04/07/2022Post-installed AnchorsShahrish Shuvospecial
04/07/2022Structural Steel - DetailsShahrish Shuvospecial
04/07/2022Structural Steel - High Strength BoltingShahrish Shuvospecial
04/07/2022Structural Steel - WeldingShahrish Shuvospecial
04/07/2022FinalShahrish Shuvoprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VerizonTelecom siteRoof
Project M00718971 Alteration · Permit Entire · 11/21/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 260 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00379300-I1Request digital key ↗
09/04/2026M00383206-I1Request digital key ↗
09/04/2026M00392568-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/02/2026M00714391-I1Request digital key ↗
09/01/2026M00718971-I1Request digital key ↗
08/26/2026M01089452-I1Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION41
05/09/2023140234752Open ↗
01/04/2023121423049Open ↗
12/27/2022121423049Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION26
03/14/2022122791363Open ↗
04/21/2021140228778Open ↗
08/19/2020140228778Open ↗
Showing 3 of 26 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/23/2022122791363Open ↗
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/04/2019140234752Open ↗
05/09/2018122803083Open ↗
05/02/2018122791363Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/09/2018122803083Open ↗
05/02/2018122791363Open ↗
03/14/2018122852528Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/09/2018122803083Open ↗
05/02/2018122791363Open ↗
03/14/2018122852528Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00383206-I1Open ↗
09/02/2026M00714391-I1Open ↗
08/13/2026M00392568-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/22/2015140337641Open ↗
08/04/2014140234752Open ↗
07/21/2014140228778Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/22/2015140337641Open ↗
08/04/2014140234752Open ↗
07/21/2014140228778Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/13/2012121423049Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026M00714391-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026M00714391-I1Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING6
04/22/2015140337641Open ↗
08/04/2014140234752Open ↗
11/13/2012121423049Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
12/20/2018120043773Open ↗
01/31/2017122925200Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/13/2018122791363Open ↗
05/02/2018122791363Open ↗
03/14/2018122852528Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
01/16/2013121423049Open ↗
12/13/2012121423049Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/13/2012121423049Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/05/2023121423049Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/05/2023121423049Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes8
11/20/2019122803083Open ↗
11/26/2018122791363Open ↗
05/09/2018122803083Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan3
09/04/2026M00383206-I1Open ↗
08/13/2026M00379300-I1Open ↗
08/13/2026M00392568-I1Open ↗
▸BISSTREET TREE CHECKLIST1
05/02/2018122791363Open ↗
▸BISSTREET TREE SIGNOFF1
02/23/2022122791363Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/26/2018122791363Open ↗
05/09/2018122803083Open ↗
03/14/2018122852528Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026M00714391-I1Open ↗
08/13/2026M00718971-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/26/2018122791363Open ↗
05/09/2018122803083Open ↗
03/14/2018122852528Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/22/2015140337641Open ↗
08/04/2014140234752Open ↗
07/21/2014140228778Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
04/22/2015140337641Open ↗
08/04/2014140234752Open ↗
07/21/2014140228778Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/05/2023121423049Open ↗
02/22/2022122791363Open ↗
02/22/2022122803083Open ↗
▸BISINTERIOR LIGHTING POWER2
02/22/2022122791363Open ↗
02/22/2022122803083Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/22/2022122803083Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/12/2018122925200Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/22/2022122791363Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/22/2022122791363Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/05/2023121423049Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/27/2023140234752Open ↗
11/01/2023140234752Open ↗
07/17/2023140234752Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISSCHEDULE A - OCCUPANCY / USE7
09/08/2022122791363Open ↗
07/07/2022122791363Open ↗
04/21/2022122791363Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
11/20/2012121423049Open ↗
11/13/2012121423049Open ↗
Showing 2 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/05/2023121423049Open ↗
02/24/2022122803083Open ↗
02/12/2018122925200Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
04/21/2021140228778Open ↗
04/18/2019122852528Open ↗
▸BISFINAL2
01/05/2023121423049Open ↗
02/22/2022122803083Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT11
11/26/2018122791363Open ↗
05/09/2018122803083Open ↗
03/14/2018122852528Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/05/2023121423049Open ↗
02/22/2022122791363Open ↗
02/22/2022122803083Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
04/22/2015140337641Open ↗
▸Filing & Intake Forms35
▸BISBOROUGH INTAKE FORM15
03/14/2022122791363Open ↗
08/02/2021122791363Open ↗
04/21/2021140228778Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION9
04/05/2022122791363Open ↗
04/08/2021122791363Open ↗
03/23/2021122791363Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
05/09/2018122803083Open ↗
05/02/2018122791363Open ↗
03/14/2018122852528Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/22/2015140337641Open ↗
08/04/2014140234752Open ↗
07/21/2014140228778Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
05/02/2018122791363Open ↗
▸BISMAINTENANCE INFORMATION1
01/05/2023121423049Open ↗
▸DOB NOWCalculations1
08/13/2026M01089452-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01089452-I1Open ↗