← Back
BuildNYC
Condo, residential unit in walk-up building
St. Charles Condominium
301 WEST 137TH STREET · BIN 1084490
💬 Discuss this project
1994Year Built
4Stories
R2Building Class
R7-2Zoning
36,188 sfGross Floor Area
28Units
LL97 Covered2 Active Violations 5 old, status unconfirmed ▸FDNY Report ↗
Condo, residential unit in walk-up building · 19,983 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLimited exterior masonry repairs4p · 1 filing · 5 docs
Floor 4Light duty pipe scaffold installation4p · 1 filing · 3 docs
Floor 3Light duty pipe scaffold installation4p · 1 filing · 3 docs
Floor 2Light duty pipe scaffold installation4p · 1 filing · 3 docs
Floor 1Light duty pipe scaffold installation4p · 1 filing · 3 docs
Site & exteriorSidewalk Shed12p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Charles Condominium IV807/08/2026
NYC Department of Housing Preservation and Development603/21/2026
Striver's Row Associates203/21/2026
Irvine Realty Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph K. Blum Co205/15/2024
Paul Perdek, Prof. Engineering109/08/2021
Syed Engineering107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D D Expeditors403/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold407/08/2026
Inter RenovationGeneral Contractor303/21/2026
Elpo Electrical ContgElectrical103/22/2026
Inter RenovationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph K. Blum Co1741205/15/2024
Building Lifecycle
All (22)Filed (4)Permit Issued (5)Signed Off (2)Violation (8)Objection (2)Special Inspection (1)
07/23/2024
Signed off — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the main roof (roof deck to remain), install chain link fence at roof
M00489139-I1
05/15/2024
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the main roof (roof deck to remain), install chain link fence at roof
M00489139-P1
10/04/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (HPD, open)
B
10/04/2023
Violation issued (HPD, open)
B
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/05/2022
Signed off — Alteration
M00550674-I1
08/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2022
Permit issued — Sidewalk Shed
M00550674-I1-SH
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/10/2021
Permit issued — Supported Scaffold
M00588584-I1-SF
09/08/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00588584-I1
08/27/2021
Permit issued — General Construction
M00489139-I1-GC
08/02/2021
Objection resolved — Addressed
07/14/2021
Permit issued — Sidewalk Shed
M00550674-I1-SH
07/14/2021
Permit issued — Sidewalk Shed
M00550674-I1-SF
07/08/2021
Filed — Alteration
M00550674-I1
07/01/2021
Special inspection requirement — Final
Sunil Saigal
04/20/2021
Objection raised — Scope
04/12/2021
Filed — Alteration
Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the main roof (roof deck to remain), install chain link fence at roof
M00489139-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/09/2022
DOB NOWSupported ScaffoldPermit IssuedInter Renovation09/10/2021
DOB NOWGeneral ConstructionSigned-offInter Renovation08/27/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/14/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/14/2021
BIS—ISSUEDIntegrated Building Systems01/05/1995
BIS—ISSUEDIntegrated Building Systems01/05/1995
BISEQISSUEDIntergrated Building Systems01/05/1995
BISPLISSUEDDanica PLG & Heating04/19/1994
BISPLISSUEDDanica Plumbing & Heating04/15/1994
BIS—ISSUEDIntegrated Building Systems02/07/1994
BIS—ISSUEDIntegrated Building Systems02/07/1994
BISEQISSUEDIntergrated Building Systems02/03/1994
1 project · most recent 07/19/2021
FiledStatusContractorScope
07/19/2021CompleteElpo Electrical Contg—
1 project · most recent 09/08/2021
Scaffold
FiledStatusContractorScope
09/08/2021Permit IssuedInter RenovationScaffold
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/01/2021FinalSunil Saigalprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00489139-P1Request digital key ↗
09/03/2026M00550674-I1Request digital key ↗
09/03/2026M00588584-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00489139-I1Open ↗
09/03/2026M00489139-P1Open ↗
08/13/2026M00588584-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026M00550674-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00489139-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00588584-I1Open ↗