← Back
BuildNYC
Walk-up apt, over six families with stores
301 WEST 152ND STREET
MANHATTAN · BIN 1060874
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R7-2Zoning
19,956 sfGross Floor Area
24Units
Rent Stabilized231 Active Violations 230 unresolved · 1 paperwork only 2 likely answered ▸
Walk-up apt, over six families with stores · Owner of record: Joe Catch Uptown Phase 1 Housing Develop Ment Fund · 4,200 sf lot · 4.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJoe NYC16p · 3 filings · 17 docs
Floor 6Joe NYC13p · 2 filings · 14 docs
Floor 5Joe NYC13p · 2 filings · 14 docs
Floor 4Joe NYC13p · 2 filings · 14 docs
Floor 3Joe NYC13p · 2 filings · 14 docs
Floor 2Joe NYC13p · 2 filings · 14 docs
Floor 1Joe NYC, Jounie & Sands21p · 7 filings · 20 docs
CellarJoe NYC34p · 4 filings · 20 docs
Site & exteriorJoe NYC10p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Nicks Alliance1107/08/2026
NYC Department of Housing Preservation and Development1003/21/2026
Central Harlem Mutual Housing503/21/2026
Joe Catch Uptown Phase 1 Housing Develop Ment Fund103/22/2026
Joe Uptown103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Collado Engineering902/05/2026
Enthink Engineers208/11/2022
St Design & Consulting312/29/2021
Cta Architects112/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants1003/21/2026
Talal Alokush PE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold1207/08/2026
M&H Interior DesignsGeneral Contractor807/08/2026
Shamas Contracting CoGeneral Contractor507/08/2026
Alafogiannis Plumbing & HeatingPlumbing307/08/2026
Cape PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004902/05/2026
Infinity Design Consultan2760112/29/2021
Autographic Co1579112/07/2021
IP Concrete Testing and I6252111/28/2021
Building Lifecycle
All (130)Filed (15)Permit Issued (17)Signed Off (5)Violation (60)Inspection (7)Special Inspection (26)
09/02/2026
Violation issued (HPD, open)
B
09/02/2026
Violation issued (HPD, open)
B
08/22/2026
Violation issued (HPD, open)
C
08/22/2026
Violation issued (HPD, open)
C
08/22/2026
Violation issued (HPD, open)
A
08/22/2026
Violation issued (HPD, open)
C
08/22/2026
Violation issued (HPD, open)
B
08/22/2026
Violation issued (HPD, open)
B
08/22/2026
Violation issued (HPD, open)
C
08/22/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
C
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
C
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
A
06/24/2026
Violation issued (HPD, open)
A
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
A
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
C
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/10/2026
Signed off — Alteration
REPLACEMENT OF DOMESTIC WATER HEATER, BOOSTER PUMP AND INSTALLATION OF CIRCUT SOLVERS AT BASE OF HWH IN CELLAR.
M00596650-I1
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, open)
B
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAlafogiannis Plumbing & Heating01/30/2025
DOB NOWMechanical SystemsSigned-offShamas Contracting Co01/06/2025
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co05/22/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises11/29/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises11/29/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises08/15/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises08/15/2023
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co05/16/2023
DOB NOWBoiler EquipmentSigned-offAlafogiannis Plumbing & Heating05/01/2023
DOB NOWMechanical SystemsPermit IssuedM&H Interior Designs08/24/2022
DOB NOWSupported ScaffoldSigned-offReliable Enterprises08/12/2022
DOB NOWSidewalk ShedSigned-offReliable Enterprises08/09/2022
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co06/29/2022
DOB NOWGeneral ConstructionPermit IssuedM&H Interior Designs05/06/2022
DOB NOWPlumbingPermit IssuedCape Plumbing03/08/2022
DOB NOWMechanical SystemsPermit IssuedM&H Interior Designs01/19/2022
DOB NOWGeneral ConstructionPermit IssuedM&H Interior Designs12/04/2021
BISEQISSUEDJF Contracting06/26/2002
BIS—ISSUEDJF Contracting06/26/2002
BISEQISSUEDRockledge Scaffold04/04/2002
BISSPISSUEDCegf & G Plumbing02/15/2002
BISPLISSUEDCegf & G Plumbing02/15/2002
BISBLISSUEDCegf & G Plumbing02/11/2002
BISEQISSUEDJF Contracting01/10/2002
BISPLISSUEDCegf & G Plumbing08/22/2001
BISEQISSUEDRockledge Scaffold07/30/2001
BISEQISSUEDJF Contracting07/18/2001
BISPLISSUEDJudah Plumbing & Heating02/25/1997
BISBLISSUEDSheffield Fuel Oil Co12/08/1994
BISEQISSUEDAtlantic Scaffolding07/21/1994
BISFBISSUEDDan RO Fuel Distributors01/29/1993
1 project · most recent 12/29/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/29/2021Permit IssuedM&H Interior DesignsVentilation Systems
Ventilation
N/A N/A 4,500 CFM · Exhaust Fan ×1
2 projects · most recent 02/05/2026
Water/Sanitary Gas
FiledStatusContractorScope
02/05/2026Signed-offAlafogiannis Plumbing & HeatingGas, Water/Sanitary
12/21/2021Permit IssuedCape PlumbingWater/Sanitary
1 project · most recent 08/11/2022
FiledStatusContractorScope
08/11/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/07/2024Energy Code Compliance InspectionsERIC BERLENTprogress
11/07/2024Post-installed AnchorsERIC BERLENTspecial
11/07/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/07/2024HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
11/07/2024Maintenance informationERIC BERLENTenergy_progress
11/07/2024HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
11/07/2024HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
01/26/2024Post-installed AnchorsERIC BERLENTspecial
01/26/2024Heating SystemsERIC BERLENTspecial
01/26/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/03/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/03/2024Post-installed AnchorsERIC BERLENTspecial
01/03/2024Heating SystemsERIC BERLENTspecial
11/03/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/03/2023Post-installed AnchorsERIC BERLENTspecial
11/03/2023Heating SystemsERIC BERLENTspecial
12/07/2021HVAC-R and service water piping design and insulationTALAL ALOKUSHenergy_progress
11/28/2021Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/11/2021Fenestration air leakageTALAL ALOKUSHenergy_progress
11/11/2021Fenestration and door U-factor and product ratingsTALAL ALOKUSHenergy_progress
09/14/2021Air barrier - visual inspectionERIC BERLENTenergy_progress
09/14/2021Masonryasghar Ghodsispecial
09/14/2021Post-installed Anchorsasghar Ghodsispecial
09/14/2021Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
09/14/2021FinalERIC BERLENTprogress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Joe NYCRestaurant / Food ServiceCellar, Floors 1–6, Roof
Project M00617442 Alteration · LOC Issued · 07/21/2022
Project M00596650 Alteration · LOC Issued · 12/22/2021
Project M00593424 Alteration · LOC Issued · 12/07/2021
Jounie & SandsRetailFloor 1
Project M00629059 Alteration · Permit Entire · 11/28/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00629059-I1Request digital key ↗
09/03/2026M00593424-I1Request digital key ↗
09/03/2026M00630808-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00630808-I1Open ↗
09/03/2026M00631622-I1Open ↗
09/02/2026M00787858-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00726806-I1Open ↗
09/20/2026M00726806-P1Open ↗
08/31/2026M00629059-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00630808-I1Open ↗
08/31/2026M00629059-I1Open ↗
08/31/2026M00629059-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/03/2026M00630808-I1Open ↗
09/03/2026M00631622-I1Open ↗
08/28/2026M00726806-P1Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/21/2026M00596650-I1Open ↗
08/13/2026M00593424-I1Open ↗
08/13/2026M00617442-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026M00596650-P4Open ↗
08/13/2026M00596650-I1Open ↗
08/13/2026M00596650-P5Open ↗