← Back
Walk-up apt, over six families with stores
3013 3RD AVE
BRONX · BIN 2097993
💬 Discuss this project
1927Year Built
4Stories
C7Building Class
C4-4Zoning
4,868 sfGross Floor Area
10Units
Rent Stabilized1 Open Violation ▸
Walk-up apt, over six families with stores · Owner of record: 3013-3015 LLC · 2,042 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 6 docs
Floor 332p · 1 filing · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 1Under Construction39p · 4 filings · 20 docs
CellarUnder Construction36p · 2 filings · 20 docs
Basement32p · 1 filing · 20 docs
3 jobs · most recent 06/30/2026
Heating and Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026Signed-offBUILDERS GROUP USA INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Daikin FTXS09LVJU 9,000 BTU · Fan Coil Indoor ×14
4MXS36WMVJU9 36,000 BTU · Heat Pump Outdoor ×5
FTXS12LVJU 12,000 BTU · Fan Coil Indoor ×10
FTXS15LVJU 15,000 BTU · Split System ×8
CTXS07LVJU 7,000 BTU · Fan Coil Indoor ×6
RXF12AXVJU 12,000 BTU · Heat Pump Outdoor ×3
MSZ-GL24NA-U1 24,000 BTU · Split System ×2
MSZ-GL12NA-U1 12,000 BTU · Split System ×1
MXZ-SM48NAM2-U1 48,000 BTU · Heat Pump Outdoor ×1
RXF18AXVJU 18,100 BTU · Heat Pump Outdoor ×1
4MXS36WMVJU 36,000 BTU · Heat Pump Outdoor ×3
RXS12LVJU 12,000 BTU · Heat Pump Outdoor ×3
3MXS24WMVJU 24,000 BTU · Vrf Outdoor ×2
RXS15LVJU 15,000 BTU · Heat Pump Outdoor ×1
Heating
Qmark LFK-151F 175 CFM · Electric Heater ×4
MUH0381 300 CFM · Unit Heater ×4
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×18
QTXE110150DC 100 CFM · Kitchen Exhaust ×18
05/23/2026——Ventilation Systems
Ventilation
Captiveaire DMUA14 3,200 CFM · Makeup Air ×1
NCA16FA 3,200 CFM · Exhaust Fan ×1
10/26/2022——Heating and Air Conditioning Systems
Heat / Cool
Carrier 48TCED08A2A5-0A0G0 96 BTU · Rooftop Unit ×1
1 job · most recent 06/30/2026
Sprinkler System
FiledStatusContractorScope
06/30/2026Signed-offTARGET PIPING NY LLCSprinkler System
2 jobs · most recent 06/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/30/2026Signed-offTARGET PIPING NY LLCGas, Water/Sanitary
10/16/2025Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
6 jobs · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025CompleteWCK ELECTRIC CORP.General Wiring
10/24/2025CompletePOWER DIRECT ELECTRIC INC22 meters, 11 new_meters
06/19/2025Permit IssuedVERE ELECTRIC CORP.General Wiring
01/29/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
11/05/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
07/10/2024CompletePOWER DIRECT ELECTRIC INC—
1 job · most recent 06/30/2026
Wood
FiledStatusContractorScope
06/30/2026Signed-offBUILDERS GROUP USA INCWood
Building Lifecycle
All (197)Filed (25)Permit Issued (8)Signed Off (5)Violation (31)Inspection (24)Objection (74)Special Inspection (30)
07/28/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Resolved
07/22/2026
Objection raised — Other
06/30/2026
Filed — Alteration CO
Filing plumbing work type application in conjunction with primary job #X00979575-I1
X00979575-A8
06/23/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/11/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/11/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/11/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/11/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/11/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/11/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/11/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/11/2026
Special inspection requirement — Metering
FAHAD FATEH
06/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/11/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
06/11/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/23/2026
Filed — Alteration
FILING FOR A NEW KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN SHOWS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01405426-I1
05/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/20/2026
Special inspection requirement — Mechanical Systems
05/20/2026
Special inspection requirement — Final
04/26/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, open)
C
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
B
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
B
04/25/2026
Violation issued (HPD, closed)
A
03/19/2026
Filed — Alteration CO
Filing plumbing work type application in conjunction with primary job #X00979575-I1
X00979575-A7
02/10/2026
Permit issued — Structural
X00979575-S5-ST
01/21/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Other
01/14/2026
Objection resolved — Addressed
01/09/2026
Objection raised — Zoning
01/07/2026
Filed — Alteration CO
Filing plumbing work type application in conjunction with primary job #X00979575-I1
X00979575-A6
01/06/2026
Filed — Alteration CO
Filing plumbing work type application in conjunction with primary job #X00979575-I1
X00979575-S5
12/17/2025
Special inspection requirement — Structural Wood Frame
12/17/2025
Special inspection requirement — Wood – Prefabricated I-Joists
12/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2025
Special inspection requirement — Final
12/15/2025
Filed — Alteration CO
Filing plumbing work type application in conjunction with primary job #X00979575-I1
X00979575-A5
12/12/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
12/12/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/12/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
12/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
Latest 60 of 197 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
581 SUTTER AVENUE CORP.703/22/2026
3015 THIRD LLC403/22/2026
GROUP USA INC BUILDERS303/22/2026
3013-3015 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2024$1.5M—3015-3RD AVENUE CORP. → 3013-3015 LLC$303/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1803/21/2026
YBL NY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor407/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
BG CONSTRUCTION NY INCGeneral Contractor104/09/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
CROSSFIELD PLBG.&HTGPlumbing106/28/2026
EXPRESS PL SWR & WTR APlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161606/30/2026
BITOPI CONSULTANTS LLC7036105/23/2026
NKM ENGINEERING PLLC6244101/06/2026
AYALA ENGINEERING P.C.9207310/16/2025
J STONE ACQUISITIONS LLC8153110/26/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBUILDERS GROUP USA02/10/2026
DOB NOWGeneral ConstructionSigned-offBG CONSTRUCTION NY INC06/10/2025
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG06/10/2025
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA08/16/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC07/18/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC07/18/2024
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA07/10/2024
DOB NOWPlumbingSigned-offEXPRESS PLBG SWR & WTR MA11/09/2022
BISBLISSUEDFRED M. SCHILDWACHTER & SONS06/30/2006
BISEQISSUEDL&B CONSTRUCTION NY INC07/10/2002
BIS—ISSUEDMIDWOOD SIGN & DESIGN INC.12/21/1998
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/22/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/14/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/11/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/04/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/11/2026Exterior lighting powerFAHAD FATEHenergy_progress
06/11/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/11/2026Fenestration air leakageFAHAD FATEHenergy_progress
06/11/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/11/2026MeteringFAHAD FATEHenergy_progress
06/11/2026Interior lighting powerFAHAD FATEHenergy_progress
06/11/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/11/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/11/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/11/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/11/2026Lighting controlsFAHAD FATEHenergy_progress
06/11/2026Maintenance informationFAHAD FATEHenergy_progress
06/11/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
06/11/2026Fenestration areasFAHAD FATEHenergy_progress
06/11/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
05/22/2026Tenant Protection Plan Compliance—special
05/20/2026Final—progress
05/20/2026Mechanical Systems—special
12/17/2025Wood – Prefabricated I-Joists—special
12/17/2025Structural Stability – Alterations of existing buildings—special
12/17/2025Structural Wood Frame—progress
12/16/2025Final—progress
12/12/2025Lighting controlsFAHAD FATEHenergy_progress
12/12/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/12/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 150.
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/23/2026X08005390-I1Contact architect ↗
08/23/2026X08005376-I1Contact architect ↗
08/18/2026X01220893-S1Contact architect ↗
Showing 3 of 26 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
08/08/2025201058443Open ↗
01/03/2024220744103Open ↗
12/27/2023220744103Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)6
08/17/2026X00979575-A8Open ↗
08/13/2026X00979575-A3Open ↗
08/13/2026X00979575-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/08/2024220744103Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00979575-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/23/2026X08005390-I1Open ↗
08/18/2026X01220893-S1Open ↗
08/17/2026X00979575-A2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/14/2026X08005390-I1Open ↗
09/14/2026X08005390-I1Open ↗
09/01/2026X00979575-A8Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/14/2026X08005390-I1Open ↗
09/01/2026X00979575-A8Open ↗
08/30/2026X00979575-S1Open ↗
Showing 3 of 18 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist9
08/17/2026X00979575-A7Open ↗
08/17/2026X00979575-I1Open ↗
08/17/2026X00979575-A8Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/23/2026X08005390-I1Open ↗
08/17/2026X00979575-A8Open ↗
08/17/2026X00979575-A2Open ↗
Showing 3 of 22 on file for this type
▸Inspections & Test Reports6
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19754
06/09/2025201058443Open ↗
06/09/2025201058443Open ↗
06/09/2025200536009Open ↗
Showing 3 of 4 on file for this type
▸BIS* MASONRY UNITS RS 10-3 3.22
06/09/2025201058443Open ↗
06/09/2025201058443Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/12/2025201058443Open ↗
06/20/2025201058443Open ↗
06/13/2025201058443Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
06/09/2025201058443Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
12/27/2023220744103Open ↗
▸BISADDITIONAL INFORMATION1
02/09/2024220744103Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification9
08/17/2026X00979575-I1Open ↗
08/17/2026X00979575-A5Open ↗
08/17/2026X00979575-A8Open ↗
Showing 3 of 9 on file for this type
▸BIS* HIGH STRENGTH BOLTS TABLE 10-22
06/09/2025200536009Open ↗
06/09/2025200536009Open ↗
▸BIS* FIRE STOPS 27-3452
06/09/2025201058443Open ↗
06/09/2025201058443Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/07/2024220744103Open ↗