| Firm | Filings | Most Recent |
|---|---|---|
| PWR ENGINEERING DESIGN DPC | 12 | 07/17/2026 |
| KMP DESIGN & ENGINEERING PLLC | 3 | 02/15/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| KMP DESIGN ENGINEERING | 14 | 03/21/2026 |
| KP CONSULTING ENGINEER | 8 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| KCE CONSULTING ENGINEERIN | 3712 | 11 | 07/17/2026 |
| KMP DESIGN & ENGINEERING | 1630 | 2 | 02/15/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/17/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MUZ-FS18NAH 18,000 BTU · Condensing Unit ×2 MXZ-3C24NAHZ 24,000 BTU · Condensing Unit ×2 Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/14/2025 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/28/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/18/2026 | Fenestration and door U-factor and product ratings | Kemba Walcott | energy_progress |
| 08/18/2026 | Fenestration areas | Kemba Walcott | energy_progress |
| 08/18/2026 | Fenestration air leakage | Kemba Walcott | energy_progress |
| 08/18/2026 | Air barrier - visual inspection | Kemba Walcott | energy_progress |
| 08/18/2026 | Lighting in dwelling units | Kemba Walcott | energy_progress |
| 08/18/2026 | Structural Stability – Alterations of existing buildings | Kemba Walcott | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | Kemba Walcott | special |
| 08/18/2026 | Fire-Resistance Rated Construction | Kemba Walcott | progress |
| 08/18/2026 | Energy Code Compliance Inspections | Kemba Walcott | progress |
| 08/17/2026 | HVAC-R and service water heating equipment | Kemba Walcott | energy_progress |
| 08/17/2026 | HVAC-R and service water heating system controls | Kemba Walcott | energy_progress |
| 08/17/2026 | Post-installed Anchors | Kemba Walcott | special |
| 08/17/2026 | Fire-Resistant Penetrations and Joints | Kemba Walcott | special |
| 08/17/2026 | Fire-Resistant Penetrations and Joints | Kemba Walcott | special |
| 08/17/2026 | Energy Code Compliance Inspections | Kemba Walcott | progress |
| 08/17/2026 | HVAC-R and service water piping design and insulation | Kemba Walcott | energy_progress |
| 08/17/2026 | Maintenance information | Kemba Walcott | energy_progress |
| 08/17/2026 | Sprinkler Systems | Kemba Walcott | special |
| 07/11/2026 | Concrete - Cast-In-Place | Kemba Walcott | special |
| 07/11/2026 | Post-installed Anchors | Kemba Walcott | special |
| 07/11/2026 | Subgrade Inspections | Kemba Walcott | special |
| 07/11/2026 | Final | Kemba Walcott | progress |
| 07/11/2026 | Footing and Foundation | Kemba Walcott | progress |
| 07/11/2026 | Structural Stability – Alterations of existing buildings | Kemba Walcott | special |