3019 AVENUE W · BIN 3320780
💬 Discuss this project
1949Year Built
6Stories
D3Building Class
R5Zoning
521,976 sfGross Floor Area
572Units
LL97 Covered1 Active Violation ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 592,000 sf lot · 0.88 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoofing Replacement and Rooftop Structure Renovation26p · 1 filing · 6 docs
Floor 143p · 1 filing · 20 docs
Site & exteriorNostrand Houses temporary construction fence10p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3207/08/2026
NYC Department of Housing Preservation and Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Superstructures Engineering + Architects103/21/2026
Neris1203/21/2026
AK Consulting Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N Construction GroupScaffold1107/08/2026
J & N Construction GroupGeneral Contractor407/08/2026
SlscoGeneral Contractor404/09/2026
Infinity Electrical Contractors IElectrical203/21/2026
Millar Elevator IndustriesElectrical203/21/2026
Metrocity GroupPlumbing107/08/2026
Prospect Electric ServiceElectrical103/21/2026
Segreti JosephElectrical103/21/2026
Dynamic Electric SystemElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Project Tactical Solution5859610/30/2025
Joel Phagoo, PE2416106/30/2023
Tectonic Engineering Cons106104/12/2021
Building Lifecycle
All (67)Filed (10)Permit Issued (10)Signed Off (7)Violation (8)Inspection (2)Special Inspection (30)
03/11/2026
Signed off — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-S2
03/10/2026
Signed off — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-I1
03/05/2026
Signed off — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-S1
02/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Permit issued — Mechanical Systems
B01282652-S1-MS
12/17/2025
Permit issued — Plumbing
B01282652-S2-PL
12/16/2025
Permit issued — General Construction
B01282652-I1-GC
11/12/2025
Violation issued (FDNY_NOV, closed)
11/12/2025
Violation issued (FDNY_NOV, closed)
11/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
Max Lee
11/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Max Lee
11/05/2025
Special inspection requirement — Mechanical Systems
Max Lee
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
11/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
11/05/2025
Special inspection requirement — Final
Max Lee
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
11/05/2025
Special inspection requirement — Maintenance information
Max Lee
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Max Lee
11/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
10/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
10/30/2025
Filed — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-P1
10/30/2025
Filed — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-P2
10/30/2025
Filed — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-P3
10/22/2025
Special inspection requirement — Mechanical Systems
Max Lee
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
10/22/2025
Special inspection requirement — Final
Max Lee
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Max Lee
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Max Lee
10/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
Max Lee
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/22/2025
Special inspection requirement — Maintenance information
Max Lee
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
10/22/2025
Special inspection requirement — Final
Max Lee
10/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Max Lee
10/22/2025
Special inspection requirement — Fenestration air leakage
Max Lee
10/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Max Lee
10/22/2025
Special inspection requirement — Fenestration areas
Max Lee
10/22/2025
Special inspection requirement — Interior lighting power
Max Lee
10/22/2025
Special inspection requirement — Lighting in dwelling units
Max Lee
09/23/2025
Filed — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-S1
09/22/2025
Filed — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-S2
09/22/2025
Filed — Alteration
plumbing related to Temporary Mock up unit - no roughing changes.
B01282652-I1
04/17/2024
Signed off — Alteration
B00496042-I1
12/27/2023
Signed off — Alteration
B08044577-I1
12/27/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 3021 AVENUE W, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08044581-I1
12/11/2023
Permit issued — Construction Fence
B08044581-I1-FN
12/05/2023
Permit issued — Sidewalk Shed
B08044577-I1-SH
11/28/2023
Permit issued — General Construction
B00496042-I1-GC
09/13/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. TEMPORARY DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00898737-I1
08/15/2023
Violation issued (FDNY_NOV, closed)
08/15/2023
Violation issued (FDNY_NOV, closed)
07/01/2023
Permit issued — Protection and Mechanical Methods
B00898737-I1-PMM
06/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. TEMPORARY DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00898737-I1
03/23/2023
Permit issued — General Construction
B00496042-I1-GC
12/14/2022
Permit issued — Construction Fence
B08044581-I1-FN
12/09/2022
Filed — Alteration
B08044577-I1
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSlsco12/19/2025
DOB NOWPlumbingSigned-offMetrocity Group12/17/2025
DOB NOWGeneral ConstructionSigned-offSlsco12/16/2025
DOB NOWConstruction FenceSigned-offJ & N Construction Group12/11/2023
DOB NOWSidewalk ShedSigned-offJ & N Construction Group12/05/2023
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group11/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offJ & N Construction Group07/01/2023
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group03/23/2023
DOB NOWConstruction FenceSigned-offJ & N Construction Group12/14/2022
DOB NOWSidewalk ShedSigned-offJ & N Construction Group12/09/2022
BISPLISSUEDDynamic Contracting03/11/2011
BISPLISSUEDFive Star P and H Co02/18/2010
BISPLISSUEDDynamic Contracting09/09/2009
BISOTISSUEDZaffuto Construction Co06/18/2003
BISOTISSUED4A General Contracting06/08/2001
BISPLISSUEDDNA Plumbing Contractors03/23/2001
BISOTISSUEDCrane Mechanical02/28/2001
BISOTISSUEDLithos Construction02/03/2000
BISPLISSUEDFive Star P and H Co09/07/1999
BISOTISSUEDLithos Construction08/30/1999
BISOTISSUEDCrane Mechanical07/02/1999
BISPLISSUEDDNA Plumbing Contractors07/02/1999
4 projects · most recent 12/02/2025
General Wiring
FiledStatusContractorScope
12/02/2025CompleteEmpire State ElectlGeneral Wiring
08/12/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
08/08/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
11/22/2022CompleteLit Mode Electrical Contg—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/05/2025Duct leakage testing, insulation and designMax Leeenergy_progress
11/05/2025HVAC-R and service water heating equipmentMax Leeenergy_progress
11/05/2025Mechanical SystemsMax Leespecial
11/05/2025Fire-Resistant Penetrations and JointsMax Leespecial
11/05/2025Tenant Protection Plan ComplianceMax Leespecial
11/05/2025FinalMax Leeprogress
11/05/2025Energy Code Compliance InspectionsMax Leeprogress
11/05/2025Maintenance informationMax Leeenergy_progress
11/05/2025HVAC-R and service water heating system controlsMax Leeenergy_progress
11/05/2025HVAC-R and service water piping design and insulationMax Leeenergy_progress
10/31/2025Tenant Protection Plan ComplianceMax Leespecial
10/22/2025Mechanical SystemsMax Leespecial
10/22/2025Tenant Protection Plan ComplianceMax Leespecial
10/22/2025Energy Code Compliance InspectionsMax Leeprogress
10/22/2025FinalMax Leeprogress
10/22/2025HVAC-R and service water heating system controlsMax Leeenergy_progress
10/22/2025HVAC-R and service water piping design and insulationMax Leeenergy_progress
10/22/2025HVAC-R and service water heating equipmentMax Leeenergy_progress
10/22/2025Duct leakage testing, insulation and designMax Leeenergy_progress
10/22/2025Tenant Protection Plan Compliance—special
10/22/2025Maintenance informationMax Leeenergy_progress
10/22/2025Fire-Resistant Penetrations and JointsMax Leespecial
10/22/2025Tenant Protection Plan ComplianceMax Leespecial
10/22/2025FinalMax Leeprogress
10/22/2025Fire-Resistance Rated ConstructionMax Leeprogress
Latest 25 of 31.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00496042-I1Request digital key ↗
08/28/2026B08044577-I1Request digital key ↗
08/28/2026B08044581-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
03/17/2011320058218Open ↗
09/10/2009320058218Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/26/2009320058218Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00496042-I1Open ↗
08/28/2026B08044577-I1Open ↗
08/27/2026B00898737-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01282652-S1Open ↗
09/23/2026B01282652-S1Open ↗
09/01/2026B01282652-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01282652-S1Open ↗
09/23/2026B01282652-S1Open ↗
09/01/2026B01282652-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/20/2011320058218Open ↗
08/26/2009320058218Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/26/2009320058218Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/26/2009320058218Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
04/11/2011320058218Open ↗
▸BISSCHEDULE B - PLUMBING1
08/26/2009320058218Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00496042-I1Open ↗
08/13/2026B01282652-I1Open ↗
08/13/2026B01282652-S2Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/26/2009320058218Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00496042-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/01/2026B00496042-I1Open ↗
08/20/2026B01282652-S1Open ↗
08/20/2026B01282652-I1Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/26/2009320058218Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/20/2011320058218Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/01/2026B00496042-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/20/2011320058218Open ↗
08/26/2009320058218Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/26/2009320058218Open ↗