301A MONROE STREET
BROOKLYN · BIN 3051192
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,520 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 301A MONROE LLC · 2,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof5p · 2 filings · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
301AMONROE3207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/09/2021$1.2M—— → —$486/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
301BMONROE LLC302/01/2024
CONCORD CONSULTING ENGINEERING PC506/07/2023
ALNOUR CONSULTING104/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHELSEA GR PRO MGMT LLCGeneral Contractor1407/08/2026
H BRONNER & SON PLBG & HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE607606/07/2023
Building Lifecycle
All (61)Filed (9)Permit Issued (8)Signed Off (4)Inspection (4)Objection (6)Special Inspection (30)
05/10/2024
Signed off — Alteration
Installation and modification of plumbing fixtures as shown on submitted plans. No change in occupancy, use or egress.
B00710369-I1
03/08/2024
Signed off — Alteration
FULL INTERIOR RENOVATION OF 301 MONROE STREET. REPLACE WINDOWS & ROOF, RENOVATE BACKYARD AND ADD NON COMBUSTIBLE DECK AS SHOWN ON PLANS. ST, PL & MS WORK FILED UNDER SEPARATE APPLICATIONS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00690690-I1
02/09/2024
Special inspection requirement — Vestibules
Nouredine Benabdelhak
02/09/2024
Special inspection requirement — Final
Nouredine Benabdelhak
02/09/2024
Special inspection requirement — Fenestration air leakage
Nouredine Benabdelhak
02/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nouredine Benabdelhak
02/09/2024
Special inspection requirement — Interior lighting power
Nouredine Benabdelhak
02/09/2024
Special inspection requirement — Lighting controls
Nouredine Benabdelhak
02/09/2024
Special inspection requirement — Exterior lighting power
Nouredine Benabdelhak
02/01/2024
Filed — Alteration
FULL INTERIOR RENOVATION OF 301 MONROE STREET. REPLACE WINDOWS & ROOF, RENOVATE BACKYARD AND ADD NON COMBUSTIBLE DECK AS SHOWN ON PLANS. ST, PL & MS WORK FILED UNDER SEPARATE APPLICATIONS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00690690-P2
10/30/2023
Signed off — Alteration
INSTALLATION OF NEW HVAC SYSTEM FOR 2 FAMILY RESIDENTIAL BUILDING AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00690628-I1
10/30/2023
Signed off — Alteration
STRUCTURAL WORK & PARTIAL DEMOLITION IN CONJUNCTION WITH ARCHITECTURAL WORK UNDER JOB #B00690690 AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00688943-I1
06/07/2023
Filed — Alteration
Installation and modification of plumbing fixtures as shown on submitted plans. No change in occupancy, use or egress.
B00710369-P2
06/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — Maintenance information
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
05/20/2023
Permit issued — Plumbing
B00710369-I1-PL
04/04/2023
Permit issued — Structural
B00688943-I1-ST
04/04/2023
Permit issued — Mechanical Systems
B00690628-I1-MS
04/04/2023
Permit issued — General Construction
B00690690-I1-GC
03/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/06/2022
Filed — Alteration
FULL INTERIOR RENOVATION OF 301 MONROE STREET. REPLACE WINDOWS & ROOF, RENOVATE BACKYARD AND ADD NON COMBUSTIBLE DECK AS SHOWN ON PLANS. ST, PL & MS WORK FILED UNDER SEPARATE APPLICATIONS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00690690-P1
12/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Vestibules
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Lighting controls
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Interior lighting power
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Fenestration air leakage
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Exterior lighting power
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Duct leakage testing, insulation and design
Nouredine Benabdelhak
12/06/2022
Special inspection requirement — Final
Nouredine Benabdelhak
12/05/2022
Filed — Alteration
Installation and modification of plumbing fixtures as shown on submitted plans. No change in occupancy, use or egress.
B00710369-P1
12/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nouredine Benabdelhak
12/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
12/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
12/05/2022
Special inspection requirement — Maintenance information
Nouredine Benabdelhak
12/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nouredine Benabdelhak
12/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nouredine Benabdelhak
08/05/2022
Permit issued — Plumbing
B00710369-I1-PL
07/28/2022
Permit issued — General Construction
B00690690-I1-GC
07/27/2022
Permit issued — Structural
B00688943-I1-ST
07/26/2022
Permit issued — Mechanical Systems
B00690628-I1-MS
07/12/2022
Special inspection requirement — Maintenance information
Nouredine Benabdelhak
07/04/2022
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM FOR 2 FAMILY RESIDENTIAL BUILDING AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00690628-P1
06/15/2022
Objection resolved — Addressed
05/02/2022
Objection resolved — Addressed
04/26/2022
Objection raised — Zoning
04/26/2022
Objection resolved — Addressed
04/26/2022
Objection raised — Zoning
04/26/2022
Objection raised — Zoning
04/21/2022
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM FOR 2 FAMILY RESIDENTIAL BUILDING AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00690628-I1
04/21/2022
Filed — Alteration
STRUCTURAL WORK & PARTIAL DEMOLITION IN CONJUNCTION WITH ARCHITECTURAL WORK UNDER JOB #B00690690 AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00688943-I1
04/20/2022
Filed — Alteration
Installation and modification of plumbing fixtures as shown on submitted plans. No change in occupancy, use or egress.
B00710369-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT05/20/2023
DOB NOWStructuralSigned-offCHELSEA GR PRO MGMT LLC04/04/2023
DOB NOWMechanical SystemsSigned-offCHELSEA GR PRO MGMT LLC04/04/2023
DOB NOWGeneral ConstructionSigned-offCHELSEA GR PRO MGMT LLC04/04/2023
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT08/05/2022
DOB NOWGeneral ConstructionSigned-offCHELSEA GR PRO MGMT LLC07/28/2022
DOB NOWStructuralSigned-offCHELSEA GR PRO MGMT LLC07/27/2022
DOB NOWMechanical SystemsSigned-offCHELSEA GR PRO MGMT LLC07/26/2022
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
02/09/2024VestibulesNouredine Benabdelhakenergy_progress
02/09/2024FinalNouredine Benabdelhakprogress
02/09/2024Fenestration air leakageNouredine Benabdelhakenergy_progress
02/09/2024Fenestration and door U-factor and product ratingsNouredine Benabdelhakenergy_progress
02/09/2024Interior lighting powerNouredine Benabdelhakenergy_progress
02/09/2024Lighting controlsNouredine Benabdelhakenergy_progress
02/09/2024Exterior lighting powerNouredine Benabdelhakenergy_progress
06/07/2023HVAC-R and service water heating equipmentNouredine Benabdelhakenergy_progress
06/07/2023HVAC-R and service water heating system controlsNouredine Benabdelhakenergy_progress
06/07/2023HVAC-R and service water piping design and insulationNouredine Benabdelhakenergy_progress
06/07/2023Maintenance informationNouredine Benabdelhakenergy_progress
06/07/2023Energy Code Compliance InspectionsNouredine Benabdelhakprogress
06/07/2023Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
06/07/2023Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
06/07/2023Energy Code Compliance InspectionsNouredine Benabdelhakprogress
12/06/2022Fenestration and door U-factor and product ratingsNouredine Benabdelhakenergy_progress
12/06/2022VestibulesNouredine Benabdelhakenergy_progress
12/06/2022Lighting controlsNouredine Benabdelhakenergy_progress
12/06/2022Interior lighting powerNouredine Benabdelhakenergy_progress
12/06/2022Fenestration air leakageNouredine Benabdelhakenergy_progress
12/06/2022Exterior lighting powerNouredine Benabdelhakenergy_progress
12/06/2022Duct leakage testing, insulation and designNouredine Benabdelhakenergy_progress
12/06/2022FinalNouredine Benabdelhakprogress
12/05/2022HVAC-R and service water heating system controlsNouredine Benabdelhakenergy_progress
12/05/2022Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
Latest 25 of 54.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026B00690690-P1Request digital key ↗
08/29/2026B00690690-P2Request digital key ↗
08/29/2026B00710369-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature35
09/30/2026B00690690-I1Open ↗
09/30/2026B00690690-I1Open ↗
09/30/2026B00690690-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026B00690628-I1Open ↗
09/25/2026B00690628-I1Open ↗
09/23/2026B00690628-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026B00690690-I1Open ↗
08/29/2026B00690690-P1Open ↗
08/29/2026B00710369-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/29/2026B00690628-I1Open ↗
08/15/2026B00688943-I1Open ↗
08/13/2026B00690690-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/29/2026B00690628-I1Open ↗
08/13/2026B00710369-I1Open ↗
08/13/2026B00690690-I1Open ↗