1900Year Built
3Stories
K4Building Class
C4-4AZoning
12,870 sfGross Floor Area
9Units
2 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 302-306 GRAND REALTYCORP. · 4,397 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 11p · 1 filing · 9 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
302 6 GRAND REALTY3907/08/2026
KAJ NY CONSTRUCTION607/08/2026
UNITED KING CONSTRUCTION303/22/2026
302-306 GRAND REALTY CORP103/22/2026
302-306 GRAND REALTYCORP103/22/2026
OWNER OF 302 GRAND ST103/22/2026
GAAAR303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.906/18/2024
LEON SKVIRSKY PE109/19/2023
J&R DESIGN AND INSPECTION CORP.108/17/2022
GREEN DESIGN207/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS203/21/2026
HIGH QUALITY 338203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W PRODUCT & SUPPLIES CORP.General Contractor1207/08/2026
WATSON'S PLUMBING HEATINGGeneral Contractor603/21/2026
UNITED KING CONSTRUCTIONGeneral Contractor303/21/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor203/21/2026
ROBIN, ARTHURElectrical103/21/2026
KAJ NY CONSTRUCTION INCGeneral Contractor107/08/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570706/18/2024
J&R DESIGN AND INSPECTION6637108/17/2022
Building Lifecycle
All (77)Filed (13)Permit Issued (13)Signed Off (10)Violation (28)Special Inspection (13)
10/24/2024
Signed off — Alteration
Interior renovation of existing stores on 1st floor, install convenience stair from 1st to cellar. No change in use, egress and occupancy.
M01036225-I1
06/18/2024
Filed — Alteration
Interior renovation of existing stores on 1st floor, install convenience stair from 1st to cellar. No change in use, egress and occupancy.
M01036225-P1
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MING WAI WONG
06/13/2024
Special inspection requirement — Structural Steel - Details
MING WAI WONG
06/13/2024
Special inspection requirement — Final
MING WAI WONG
05/01/2024
Permit issued — Structural
M01036225-I1-ST
04/29/2024
Permit issued — General Construction
M01036225-I1-GC
04/19/2024
Filed — Alteration
Interior renovation of existing stores on 1st floor, install convenience stair from 1st to cellar. No change in use, egress and occupancy.
M01036225-I1
03/07/2024
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (JUICE TIME)
M00925443-I1
09/21/2023
Permit issued — Sign
M00925443-I1-SG
09/19/2023
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (JUICE TIME)
M00925443-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/26/2022
Signed off — Alteration
EXTERIOR RENOVATION OF EXISTING MIX-USE BUILDING WITH REPLACING EXISTING AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00795104-I1
08/19/2022
Permit issued — General Construction
M00795104-I1-GC
08/17/2022
Filed — Alteration
EXTERIOR RENOVATION OF EXISTING MIX-USE BUILDING WITH REPLACING EXISTING AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00795104-I1
08/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
08/17/2022
Special inspection requirement — Final
Robert Truskosky
07/19/2021
Signed off — Alteration
Install storefront awning for store 71-73C. No change in use, egress and occupancy
M00498477-I1
07/19/2021
Signed off — Alteration
Install storefront awning with wording for store 71-73A. No change in use, egress and occupancy
M00497683-I1
07/19/2021
Signed off — Alteration
M00476489-I1
07/19/2021
Signed off — Alteration
Install storefront awning for store 71-73B. No change in use, egress and occupancy
M00498470-I1
07/19/2021
Signed off — Alteration
Install storefront awning with wording. No change in use, egress and occupancy
M00479091-I1
07/19/2021
Signed off — Alteration
M00474285-I1
07/19/2021
Signed off — Alteration
M00491365-I1
05/26/2021
Permit issued — General Construction
M00497683-I1-GC
05/26/2021
Permit issued — General Construction
M00498470-I1-GC
05/26/2021
Permit issued — General Construction
M00474285-I1-GC
05/26/2021
Permit issued — General Construction
M00476489-I1-GC
05/26/2021
Permit issued — General Construction
M00479091-I1-GC
05/26/2021
Permit issued — General Construction
M00491365-I1-GC
05/26/2021
Permit issued — General Construction
M00498477-I1-GC
04/11/2021
Filed — Alteration
Install storefront awning for store 71-73C. No change in use, egress and occupancy
M00498477-I1
04/11/2021
Filed — Alteration
Install storefront awning with wording for store 71-73A. No change in use, egress and occupancy
M00497683-I1
04/11/2021
Filed — Alteration
Install storefront awning for store 71-73B. No change in use, egress and occupancy
M00498470-I1
04/05/2021
Special inspection requirement — Final
MING WAI WONG
04/05/2021
Special inspection requirement — Post-installed Anchors
MING WAI WONG
04/05/2021
Special inspection requirement — Post-installed Anchors
MING WAI WONG
04/05/2021
Special inspection requirement — Final
MING WAI WONG
04/02/2021
Special inspection requirement — Final
MING WAI WONG
04/02/2021
Special inspection requirement — Post-installed Anchors
MING WAI WONG
03/23/2021
Filed — Alteration
M00491365-I1
03/02/2021
Filed — Alteration
Install storefront awning with wording. No change in use, egress and occupancy
M00479091-I1
03/02/2021
Special inspection requirement — Post-installed Anchors
MING WAI WONG
03/02/2021
Special inspection requirement — Final
MING WAI WONG
02/25/2021
Filed — Alteration
M00476489-I1
02/24/2021
Filed — Alteration
M00474285-I1
07/14/2020
Permit issued — Sidewalk Shed
M00369924-I1-SH
07/13/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00369924-I1
12/07/2019
Violation issued (ECB, closed)
Construction
12/07/2019
Violation issued (ECB, closed)
Construction
10/25/2019
Violation issued (ECB, closed)
Construction
10/25/2019
Violation issued (ECB, closed)
Construction
05/16/2019
Permit issued — Sidewalk Shed
M00168127-I1-SH
05/15/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00168127-I1
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offWATSON'S PLUMBING HEATING05/01/2024
DOB NOWGeneral ConstructionSigned-offWATSON'S PLUMBING HEATING04/29/2024
DOB NOWSignSigned-offPAUL SIGNS, INC09/21/2023
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION08/19/2022
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWGeneral ConstructionSigned-offW PRODUCT & SUPPLIES CORP05/26/2021
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION07/14/2020
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC05/16/2019
BISOTISSUEDKAFAIT ALI07/27/2020
BISOTISSUEDGREAT AMERICAN CONSTR SER05/31/2019
BISMHISSUEDSMVP MGMT INC04/16/2019
BISPLISSUEDK & BH PLUMBING & HTG INC06/28/2018
BISOTISSUEDRAMANAND CHANDRABALI06/26/2018
BISPLISSUEDALPINE REFRIGERATION CO02/01/2018
BISOTISSUEDSUNRISE RENOVATION INC01/26/2018
BISOTISSUEDSK ONE CONSTRUCTION INC04/03/2017
BISPLISSUEDH & F PLUMBING INC01/20/2016
BISOTISSUEDGLOBAL GROUP INDUSTRIES C01/08/2016
BISPLISSUEDK & BH PLUMBING & HTG INC02/29/2000
BISBLISSUEDK & BH PLUMBING & HTG INC02/29/2000
BISOTISSUEDWLK CONSTRUCTION INC.01/28/2000
BISEQISSUEDWKL CONSTRUCTION INC01/07/2000
BISOTISSUEDWKL CONSTRUCTION INC01/07/2000
BISOTISSUEDMOO GOONG HWA AWNING CORP.03/14/1996
BISOTISSUEDMOO GOONG HWA AWNING CORP.11/21/1995
BISOTISSUEDCCL CONSTRUCTION CORP.10/30/1995
BISPLISSUEDNYTEX ENVIRONMENTAL CORP10/02/1995
BISOTISSUEDCYCLE COOLING & VENTLTN INC09/14/1995
BISOTRE-ISSUEDMEI LIN CONTRUCTION INC06/29/1995
5 projects · most recent 12/06/2023
General Wiring
FiledStatusContractorScope
12/06/2023Permit IssuedEMPIRE STATE ELECTL CORP—
04/07/2023CompleteINTELOGIC ELECTRIC, INC.12 meters, 2 new_meters
07/13/2020Permit IssuedRICHARD NEU—
05/15/2019Permit IssuedRICHARD NEU—
01/31/2018Permit IssuedERIC & NG ELEC'L, INC.General Wiring
2 projects · most recent 07/13/2020
Sidewalk Shed
FiledStatusContractorScope
07/13/2020Permit IssuedUNITED KING CONSTRUCTIONSidewalk Shed
05/15/2019Permit IssuedKAJ NY CONSTRUCTION INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/13/2024Fire-Resistant Penetrations and JointsMING WAI WONGspecial
06/13/2024Structural Steel - DetailsMING WAI WONGspecial
06/13/2024FinalMING WAI WONGprogress
08/17/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
08/17/2022FinalRobert Truskoskyprogress
04/05/2021FinalMING WAI WONGprogress
04/05/2021Post-installed AnchorsMING WAI WONGspecial
04/05/2021Post-installed AnchorsMING WAI WONGspecial
04/05/2021FinalMING WAI WONGprogress
04/02/2021FinalMING WAI WONGprogress
04/02/2021Post-installed AnchorsMING WAI WONGspecial
03/02/2021Post-installed AnchorsMING WAI WONGspecial
03/02/2021FinalMING WAI WONGprogress
▾Documents — 191 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch9
09/04/2026M00479091-I1Request digital key ↗
09/04/2026M00491365-I1Request digital key ↗
09/03/2026M00498470-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00474285-I1Request digital key ↗
09/04/2026M00476489-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00168127-I1Request digital key ↗
09/04/2026M00369924-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION12
07/19/2019140851371Open ↗
05/30/2019140851371Open ↗
05/01/2019123892207Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
05/30/2019140851371Open ↗
04/24/2019123892207Open ↗
02/26/2019123581800Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00168127-I1Open ↗
09/04/2026M00474285-I1Open ↗
09/04/2026M00476489-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
09/13/2019123892207Open ↗
09/13/2019123892207Open ↗
09/04/2019123062345Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/14/2026M00795104-I1Open ↗
09/02/2026M00497683-I1Open ↗
08/30/2026M00498470-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/24/2019123892207Open ↗
02/26/2019123581800Open ↗
08/22/2018123581800Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/30/2019140851371Open ↗
04/24/2019123892207Open ↗
06/21/2018123581800Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/14/2026M00795104-I1Open ↗
09/02/2026M00497683-I1Open ↗
08/30/2026M00498470-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/30/2019140851371Open ↗
12/31/2015140445436Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/30/2019140851371Open ↗
12/31/2015140445436Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/24/2019123892207Open ↗
06/21/2018123581800Open ↗
01/16/2018123197726Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
07/25/2019123581800Open ↗
07/25/2019123581800Open ↗
07/25/2019123581800Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/25/2019123581800Open ↗
▸BISSCHEDULE B - PLUMBING1
12/31/2015140445436Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
04/24/2019123892207Open ↗
01/16/2018123197726Open ↗
04/19/2017123062345Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00369924-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/04/2026M00474285-I1Open ↗
09/04/2026M00476489-I1Open ↗
09/04/2026M00491365-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/30/2019140851371Open ↗
04/24/2019123892207Open ↗
06/21/2018123581800Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
09/13/2019123892207Open ↗
09/13/2019123892207Open ↗
09/04/2019123062345Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
09/17/2020140851371Open ↗
09/04/2019123062345Open ↗
07/18/2019123197726Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/17/2020140851371Open ↗
05/30/2019140851371Open ↗
12/31/2015140445436Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/30/2019140851371Open ↗
12/31/2015140445436Open ↗
▸Inspections & Test Reports8
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION5
09/04/2019123062345Open ↗
07/18/2019123197726Open ↗
06/07/2019123581800Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/17/2020140851371Open ↗
05/30/2019140851371Open ↗
12/31/2015140445436Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/17/2020140851371Open ↗
09/13/2019123892207Open ↗
09/04/2019123062345Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER1
07/19/2019140851371Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/17/2016140445436Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
09/17/2020140851371Open ↗
09/13/2019123892207Open ↗
09/04/2019123062345Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM9
09/13/2019123892207Open ↗
09/04/2019123062345Open ↗
07/18/2019123197726Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
12/05/2019140851371Open ↗
08/20/2019140851371Open ↗
07/03/2019123062345Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
04/24/2019123892207Open ↗
06/21/2018123581800Open ↗
01/16/2018123197726Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/30/2019140851371Open ↗
12/31/2015140445436Open ↗