302 WEST 86TH STREET
MANHATTAN · BIN 1033921
💬 Discuss this project
1917Year Built
12Stories
D4Building Class
R10AZoning
74,817 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 302 West 86 Street Owners · 5,108 sf lot · 14.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOrsid Realty CORPUnder Construction6p · 3 filings · 20 docs
PenthouseUnit PHUnder Construction10p · 1 filing · 20 docs
Floor 12Unit 12B, Unit 12C14p · 3 filings · 20 docs
Floor 11Under Construction2p · 1 filing · 20 docs
Floor 10
Floor 9
Floor 8
Floor 7Unit 7A, Unit 7BUnder Construction25p · 3 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorOrsid Realty CORP18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
302 West 86 Street Owners5903/22/2026
302 W 86th St Owners903/21/2026
302 W 86 St Realty Corp - Orsid303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Studio Officina Architecture307/21/2026
Wells Engineering109/23/2025
None109/12/2025
BLD Lab Architecture309/11/2025
Broadloom Architecture211/08/2024
Cuono Engineering205/12/2022
Pace Engineering408/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anzalone Architecture403/21/2026
Luca Farinelli Architect103/21/2026
Municipal Building Consultants203/21/2026
Lloyd Noel Building Consultant303/21/2026
Eurocelt Expediting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brend RestorationScaffold907/08/2026
Figure GroundGeneral Contractor607/08/2026
Inventive ContractingGeneral Contractor404/09/2026
Brend Restorationspecialty_contractor303/21/2026
Delta Star ElectricElectrical103/21/2026
HY-Lee Electric CoElectrical103/21/2026
Optimal ElectricElectrical103/21/2026
Alliance Elevator CompanyElectrical103/21/2026
EuroremontGeneral Contractor107/08/2026
Big Apple PlumbingPlumbing107/08/2026
Mega PlumbingPlumbing107/08/2026
Bulk ElectricElectrical103/21/2026
Superior Plumbing & HeatingPlumbing107/08/2026
Almasi ElectricElectrical103/21/2026
Mike Lewkovicz Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering2018109/23/2025
Wells Design & Consulting7750109/23/2025
AK Engineering678409/12/2025
The Rajiv9613409/12/2025
Ase Engineering5785211/08/2024
Building Lifecycle
All (158)Filed (16)Permit Issued (16)Signed Off (2)Facade (FISP) (13)Violation (57)Inspection (6)Objection (18)Special Inspection (30)
07/21/2026
Filed — Alteration
RENOVATION OF EXISTING APARTMENT 7A. INSTALLATION OF PLUMBNG FIXTURES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS AAPLICATION
M01251848-P1
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2026
Permit issued — Structural
M01155272-S5-ST
01/21/2026
Permit issued — General Construction
M01155272-S4-GC
01/21/2026
Permit issued — General Construction
M01155272-I1-GC
12/04/2025
Permit issued — Mechanical Systems
M01251854-I1-MS
12/03/2025
Permit issued — Plumbing
M01251848-I1-PL
12/02/2025
Permit issued — General Construction
M01251837-I1-GC
11/22/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
10/29/2025
Permit issued — Plumbing
M01155272-S1-PL
10/23/2025
Permit issued — General Construction
M01155272-I1-GC
10/23/2025
Objection resolved — Addressed
10/23/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Admin
10/20/2025
Objection raised — Cost
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
09/30/2025
Objection raised — Admin
09/29/2025
Objection raised — Scope
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Scope
09/26/2025
Objection raised — Scope
09/26/2025
Objection raised — Structural
09/26/2025
Objection raised — Scope
09/23/2025
Filed — Alteration
RENOVATION OF EXISTING APARTMENT 7A. INSTALLATION OF PARTITIONS, DOORS, WALLS, AND FLOOR FINISHES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01251837-I1
09/23/2025
Filed — Alteration
INSTALLATION OF NEW SPLIT AND INDOOR-PACKAGED HVAC SYSTEMS FOR ANEXISTING APARTMENT UNIT. NO CHANGE OF USE, EGRESS, OR OCCUPANCYUNDER THIS APPLICATION.
M01251854-I1
09/23/2025
Filed — Alteration
RENOVATION OF EXISTING APARTMENT 7A. INSTALLATION OF PLUMBNG FIXTURES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS AAPLICATION
M01251848-I1
09/19/2025
Special inspection requirement — Maintenance information
Tyrone Wells
09/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tyrone Wells
09/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tyrone Wells
09/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tyrone Wells
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tyrone Wells
09/19/2025
Special inspection requirement — Shutoff dampers
Tyrone Wells
09/17/2025
Special inspection requirement — Interior lighting power
Louisa Anderson
09/12/2025
Filed — Alteration
Enlargement of 2 window openings at Penthouse unit. No Change to Use, Egress or Occupancy.
M01155272-S5
09/11/2025
Filed — Alteration
Enlargement of 2 window openings at Penthouse unit. No Change to Use, Egress or Occupancy.
M01155272-I1
09/11/2025
Filed — Alteration
Enlargement of 2 window openings at Penthouse unit. No Change to Use, Egress or Occupancy.
M01155272-S4
09/11/2025
Filed — Alteration
Enlargement of 2 window openings at Penthouse unit. No Change to Use, Egress or Occupancy.
M01155272-S1
09/11/2025
Special inspection requirement — Structural Steel - Details
Ari Kamo
09/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Luca Farinelli
09/04/2025
Special inspection requirement — Fenestration air leakage
Luca Farinelli
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Luca Farinelli
09/04/2025
Special inspection requirement — Air barrier - visual inspection
Luca Farinelli
09/04/2025
Special inspection requirement — Insulation placement and R values
Luca Farinelli
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
09/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Rajiv Fernandez
09/02/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Ari Kamo
09/02/2025
Special inspection requirement — Final
Luca Farinelli
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Luca Farinelli
09/02/2025
Special inspection requirement — Final
Ari Kamo
09/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Rajiv Fernandez
09/02/2025
Special inspection requirement — Structural Steel - Welding
Ari Kamo
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedFigure Ground01/30/2026
DOB NOWGeneral ConstructionPermit IssuedFigure Ground01/21/2026
DOB NOWGeneral ConstructionPermit IssuedFigure Ground01/21/2026
DOB NOWMechanical SystemsPermit IssuedInventive Contracting12/04/2025
DOB NOWPlumbingPermit IssuedSuperior Plumbing & Heating12/03/2025
DOB NOWGeneral ConstructionPermit IssuedInventive Contracting12/02/2025
DOB NOWPlumbingPermit IssuedBig Apple Plumbing10/29/2025
DOB NOWGeneral ConstructionPermit IssuedFigure Ground10/23/2025
DOB NOWPlumbingSigned-offMega Plumbing03/25/2025
DOB NOWGeneral ConstructionPermit IssuedEuroremont03/19/2025
DOB NOWSupported ScaffoldSigned-offBrend Restoration08/09/2022
DOB NOWSidewalk ShedSigned-offBrend Restoration06/07/2022
DOB NOWStructuralSigned-offBrend Restoration04/26/2022
DOB NOWSupported ScaffoldSigned-offBrend Restoration08/11/2021
DOB NOWSidewalk ShedSigned-offBrend Restoration06/14/2021
DOB NOWSidewalk ShedSigned-offBrend Restoration06/25/2020
BISOTISSUEDBrend Restoration03/24/2022
BISOTISSUEDBrend Restoration04/08/2021
BISOTISSUEDStanley Ruth Co10/24/2020
BISOTISSUEDBrend Restoration09/09/2020
BISPLISSUEDBell Fuel Oil11/27/2018
BISBLISSUEDAbilene08/13/2018
BISMHISSUEDAbilene08/02/2018
BISBLISSUEDAbilene07/31/2018
BISPLISSUEDPremier Flow Plumbing and Heating01/11/2018
BISOTISSUEDPL-Euro Construction09/14/2017
BISMHISSUEDPL-Euro Construction09/14/2017
BISPLISSUEDPremier Flow Plumbing and Heating11/15/2016
BISOTISSUEDPL-Euro Construction11/14/2016
BISMHISSUEDPL-Euro Construction11/14/2016
BISPLISSUEDV.A.L. Plumbing & Heating09/29/2014
BISOTISSUED212 Builders09/12/2014
BISMHISSUEDHite Construction04/02/2014
BISOTISSUEDHite Construction03/14/2014
BISPLISSUEDAbsolute Plumbing & Heating12/23/2013
BISMHISSUEDHite Construction12/10/2013
BISPLISSUEDOrion Plumbing & Heating09/18/2013
BISOTISSUED535 Phase Construction09/16/2013
BISPLISSUEDS.K. Piping & Heating07/30/2013
BISOTISSUEDDJM Restoration10/11/2012
+ 26 more permits on file
1 project · most recent 09/23/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2025Permit IssuedInventive ContractingHeating and Air Conditioning Systems
Heat / Cool
Ephoca ADK10R3H2 14,000 BTU · Packaged Unit ×1
Task TYC021TW-30K 29,900 BTU · Condensing Unit ×1
3 projects · most recent 07/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/21/2026Permit IssuedSuperior Plumbing & HeatingGas, Water/Sanitary
09/12/2025Permit IssuedBig Apple PlumbingGas, Water/Sanitary
11/08/2024Signed-offMega PlumbingGas, Water/Sanitary
8 projects · most recent 05/21/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/21/2026Permit IssuedKamp ElectricGeneral Wiring
02/02/2026Permit IssuedBulk ElectricGeneral Wiring
12/05/2025CompleteAtmos Electric SvceGeneral Wiring
03/24/2025Permit IssuedKings Electric CoGeneral Wiring
07/07/2020CompleteTop Shelf Electric—
09/09/2019CompleteGauge Tech ElectricGeneral Wiring
10/26/2018CompleteAbilene ElectricBoiler Controls
08/17/2018CompleteAbilene Electric—
1 project · most recent 09/12/2025
Steel Concrete
FiledStatusContractorScope
09/12/2025Permit IssuedFigure GroundSteel, Concrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/19/2025Maintenance informationTyrone Wellsenergy_progress
09/19/2025HVAC-R and service water heating equipmentTyrone Wellsenergy_progress
09/19/2025HVAC-R and service water piping design and insulationTyrone Wellsenergy_progress
09/19/2025HVAC-R and service water heating system controlsTyrone Wellsenergy_progress
09/19/2025Fire-Resistant Penetrations and JointsTyrone Wellsspecial
09/19/2025Shutoff dampersTyrone Wellsenergy_progress
09/17/2025Interior lighting powerLouisa Andersonenergy_progress
09/11/2025Structural Steel - DetailsAri Kamospecial
09/04/2025Fenestration and door U-factor and product ratingsLuca Farinellienergy_progress
09/04/2025Fenestration air leakageLuca Farinellienergy_progress
09/04/2025Energy Code Compliance InspectionsLuca Farinelliprogress
09/04/2025Air barrier - visual inspectionLuca Farinellienergy_progress
09/04/2025Insulation placement and R valuesLuca Farinellienergy_progress
09/02/2025Structural Stability – Alterations of existing buildingsAri Kamospecial
09/02/2025Tenant Protection Plan ComplianceRajiv Fernandezspecial
09/02/2025Wall Panels, Curtain Walls, and VeneersAri Kamospecial
09/02/2025FinalLuca Farinelliprogress
09/02/2025Energy Code Compliance InspectionsLuca Farinelliprogress
09/02/2025FinalAri Kamoprogress
09/02/2025Tenant Protection Plan ComplianceRajiv Fernandezspecial
09/02/2025Structural Steel - WeldingAri Kamospecial
09/02/2025Concrete - Cast-In-PlaceAri Kamospecial
09/02/2025Post-installed AnchorsAri Kamospecial
08/15/2025MeteringLuca Farinellienergy_progress
08/15/2025Lighting in dwelling unitsLuca Farinellienergy_progress
Latest 25 of 50.
▾Documents — 607 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
09/03/2026M00570352-I1Request digital key ↗
09/02/2026M00672162-P2Request digital key ↗
09/02/2026M00672162-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00338117-I1Request digital key ↗
08/15/2026M00338117-P4Request digital key ↗
08/15/2026M00338117-P3Request digital key ↗
▸Applications & Permits117
▸BISWORK PERMIT APPLICATION56
10/24/2020140957114Open ↗
09/09/2020123857843Open ↗
11/27/2018123478101Open ↗
Showing 3 of 56 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION48
12/21/2023122738939Open ↗
08/02/2022123857843Open ↗
04/14/2021103607786Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWLPC Approval/Permit11
08/13/2026M00672162-I1Open ↗
08/13/2026M00672162-P2Open ↗
08/13/2026M01155272-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
10/10/2023120511687Open ↗
09/29/2023120511687Open ↗
▸Seals & Professional Certifications139
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
02/07/2020123857843Open ↗
02/07/2020123857843Open ↗
12/05/2018123478101Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026M01251854-I1Open ↗
09/23/2026M01251854-I1Open ↗
09/23/2026M01251854-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/04/2026M00338117-I1Open ↗
09/04/2026M00338117-P3Open ↗
09/02/2026M00672162-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M01251854-I1Open ↗
09/23/2026M01251854-I1Open ↗
09/02/2026M08024623-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/27/2018123478101Open ↗
07/16/2015122438193Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/27/2018123478101Open ↗
07/16/2015122438193Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/29/2020140957114Open ↗
08/17/2014140227047Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/29/2020140957114Open ↗
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE24
04/13/2015121730298Open ↗
03/12/2015121730298Open ↗
02/11/2015121833418Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING16
03/06/2015121730298Open ↗
08/17/2014140227047Open ↗
Showing 2 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
07/27/2018123478101Open ↗
05/03/2017122738939Open ↗
07/19/2016122738939Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
07/27/2018123478101Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
10/16/2020140957114Open ↗
02/11/2020123857843Open ↗
07/27/2018123478101Open ↗
▸DOB NOWTenant Protection Plan3
09/04/2026M00338117-P3Open ↗
09/04/2026M00338117-I1Open ↗
08/13/2026M00338117-P4Open ↗
▸Environmental & Asbestos43
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
09/29/2020140957114Open ↗
02/11/2020123857843Open ↗
07/27/2018123478101Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026M00672162-P2Open ↗
09/02/2026M00672162-I1Open ↗
08/25/2026M08024623-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/21/2026M01155272-S1Open ↗
08/21/2026M01155272-I1Open ↗
08/21/2026M01155272-S5Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
02/07/2020123857843Open ↗
07/19/2016122738939Open ↗
07/19/2016122738939Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
12/12/2023122738939Open ↗
12/05/2023122738939Open ↗
07/22/2021140957114Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/05/2023122738939Open ↗
07/22/2021140957114Open ↗
09/29/2020140957114Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/29/2020140957114Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/11/2023123857843Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
12/12/2023122738939Open ↗
12/07/2023122738939Open ↗
12/05/2023122738939Open ↗
Showing 3 of 8 on file for this type
▸BISMASONRY1
12/11/2023123857843Open ↗
▸Approvals, Objections & Sign-offs72
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
12/22/2023123857843Open ↗
12/21/2023122738939Open ↗
10/10/2023120511687Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLANDMARKS APPROVAL11
09/29/2020140957114Open ↗
02/26/2020123857843Open ↗
12/05/2018123478101Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/06/2014120511687Open ↗
Showing 1 of 9 on file for this type
▸BISLANDMARKS SIGNOFF2
12/22/2023123857843Open ↗
07/22/2021140957114Open ↗
▸BISLANDMARK APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
12/12/2023123857843Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT57
12/12/2023122738939Open ↗
09/07/2022123857843Open ↗
09/01/2022123857843Open ↗
Showing 3 of 57 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/11/2023123857843Open ↗
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET23
02/07/2020123857843Open ↗
07/27/2018123478101Open ↗
07/19/2016122738939Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION16
10/07/2022123857843Open ↗
02/11/2020123857843Open ↗
05/23/2017122738939Open ↗
Showing 3 of 16 on file for this type
▸BISeFiling Job Application Cover Sheet5
09/29/2020140957114Open ↗
08/17/2014140227047Open ↗
Showing 2 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
12/18/2018123478101Open ↗
12/05/2018123478101Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00672162-I1Open ↗