← Back
BRONX
3020 WILLIAMSBRIDGE ROAD
BRONX · BIN 2131354
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 20 docs
Floor 4Under Construction2 filings · 20 docs
Floor 3Under Construction2 filings · 20 docs
Floor 2Under Construction2 filings · 20 docs
Floor 1Under Construction2 filings · 20 docs
CellarUnder Construction2 filings · 20 docs
1 job · most recent 05/08/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026Signed-offK&P BUILDERS CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
York YBSH070SL001CABA 50,000 BTU · Furnace ×2
Heating
York YBSH070SL001CABA 90,000 BTU · Furnace ×2
Ventilation
York YBSH070SL001CABA 5,000 CFM · Furnace ×16
1 job · most recent 05/08/2026
Sprinkler System
FiledStatusContractorScope
05/08/2026Permit IssuedRRP PLUMBING CORPSprinkler System
1 job · most recent 05/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/08/2026Permit IssuedTRI STATE PLBG & HTG INCGas, Storm, Water/Sanitary
1 job · most recent 05/08/2026
Steel
FiledStatusContractorScope
05/08/2026Permit IssuedTRI STATE PLBG & HTG INCSteel
Building Lifecycle
All (148)Filed (13)Permit Issued (21)Signed Off (1)Inspection (11)Objection (72)Special Inspection (30)
08/18/2026
Permit issued — Boiler Equipment
X00598750-S3-BE
06/25/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2026
Permit issued — Plumbing
X37466286-S2-PL
06/11/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/01/2026
Permit issued — Boiler Equipment
X00598750-S9-BE
06/01/2026
Permit issued — Boiler Equipment
X00598750-S8-BE
06/01/2026
Permit issued — Boiler Equipment
X00598750-Z1-BE
05/08/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-P8
05/08/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FRANZ SEBORGA
05/05/2026
Permit issued — Sprinklers
X00598750-S6-EW-SP
05/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2026
Special inspection requirement — Permanent certificate
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Concrete - Cast-In-Place
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Insulation placement and R values
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Ventilation and air distribution system
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Air barrier - visual inspection
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Structural Steel - Welding
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Subgrade Inspections
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Structural Cold-Formed Steel
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Mechanical Systems
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Heating Systems
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Masonry
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Electrical motors and elevators
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Structural Steel - Details
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Chimneys and vents
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Footing and Foundation
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Final
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Lighting in dwelling units
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Air barrier continuity plan testing
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
FRANZ SEBORGA
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Lighting controls
FRANZ SEBORGA
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Fenestration air leakage
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Interior lighting power
FRANZ SEBORGA
04/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANZ SEBORGA
04/15/2026
Objection resolved — Addressed
04/13/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2026
Objection raised — Energy
03/30/2026
Objection raised — Energy
03/30/2026
Objection raised — Energy
03/18/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-P5
03/17/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-S8
03/17/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-Z1
03/17/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-S9
03/13/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-P6
03/13/2026
Filed — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-P7
03/11/2026
Signed off — New Building
INSTALLATION OF SPRINKLERS IN FLOORS 1-4, CELLAR AND ROOF. NO CHANGE OF USE, OCCUPANCY, OR MEANS OF EGRESS.
X00598750-S1
03/03/2026
Permit issued — Support of Excavation
X00598750-S1-SE
01/06/2026
Permit issued — Plumbing
X00598750-S2-PL
10/16/2025
Permit issued — Foundation
X00598750-I1-GC-CX
Latest 60 of 148 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHONG ENGINEERING, P.C.1205/08/2026
FRANZ SEBORGA105/11/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI STATE PLBG & HTG INCPlumbing108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811103/18/2026
REGIONAL TESTING CORP.394106/06/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedTRI STATE PLBG & HTG INC08/18/2026
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC06/11/2026
DOB NOWBoiler EquipmentPermit IssuedTRI STATE PLBG & HTG INC06/01/2026
DOB NOWBoiler EquipmentPermit IssuedTRI STATE PLBG & HTG INC06/01/2026
DOB NOWBoiler EquipmentPermit IssuedTRI STATE PLBG & HTG INC06/01/2026
DOB NOWSprinklersPermit IssuedRRP PLUMBING CORP05/05/2026
DOB NOWSupport of ExcavationSigned-offK&P BUILDERS CORP03/03/2026
DOB NOWPlumbingPermit IssuedDW PLUMBING INC01/06/2026
DOB NOWFoundationPermit IssuedK&P BUILDERS CORP10/16/2025
DOB NOWPlumbingPermit IssuedDW PLUMBING INC07/07/2025
DOB NOWStructuralPermit IssuedK&P BUILDERS CORP01/07/2025
DOB NOWPlumbingPermit IssuedDW PLUMBING INC08/07/2024
DOB NOWPlumbingPermit IssuedDW PLUMBING INC05/28/2024
DOB NOWFoundationPermit IssuedHYPER STRUCTURES GRP INC02/13/2024
DOB NOWStructuralPermit IssuedANGELINE PENA-LEVI04/10/2023
DOB NOWFoundationPermit IssuedTURNKEY 88 CONTRACTING IN03/14/2023
DOB NOWGeneral ConstructionPermit IssuedTURNKEY 88 CONTRACTING IN02/22/2023
DOB NOWMechanical SystemsPermit IssuedRECORD 13 CONSTRUCTION CO12/07/2022
DOB NOWFoundationPermit IssuedRECORD 13 CONSTRUCTION CO07/20/2022
DOB NOWGeneral ConstructionPermit IssuedRECORD 13 CONSTRUCTION CO05/27/2022
DOB NOWMechanical SystemsPermit IssuedTURNKEY 88 CONTRACTING IN05/24/2022
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/25/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/11/2026Fail-Final CND-Occupancy InspectionFailView ↗
05/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/15/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
05/08/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFRANZ SEBORGAspecial
04/24/2026Shutoff dampersFRANZ SEBORGAenergy_progress
04/24/2026Fenestration areasFRANZ SEBORGAenergy_progress
04/24/2026Air barrier — testing FRANZ SEBORGAenergy_progress
04/24/2026Maintenance informationFRANZ SEBORGAenergy_progress
04/24/2026Exterior lighting powerFRANZ SEBORGAenergy_progress
04/24/2026MeteringFRANZ SEBORGAenergy_progress
04/24/2026Structural Steel - WeldingFRANZ SEBORGAspecial
04/24/2026Subgrade InspectionsFRANZ SEBORGAspecial
04/24/2026Structural Steel - High Strength BoltingFRANZ SEBORGAspecial
04/24/2026Structural Cold-Formed SteelFRANZ SEBORGAspecial
04/24/2026Mechanical SystemsFRANZ SEBORGAspecial
04/24/2026Heating SystemsFRANZ SEBORGAspecial
04/24/2026Fire-Resistant Penetrations and JointsFRANZ SEBORGAspecial
04/24/2026MasonryFRANZ SEBORGAspecial
04/24/2026Concrete - Cast-In-PlaceFRANZ SEBORGAspecial
04/24/2026Structural Steel - DetailsFRANZ SEBORGAspecial
04/24/2026Excavations - Sheeting, Shoring, and BracingFRANZ SEBORGAspecial
04/24/2026Chimneys and ventsFRANZ SEBORGAspecial
04/24/2026Footing and FoundationFRANZ SEBORGAprogress
04/24/2026FinalFRANZ SEBORGAprogress
04/24/2026Lighting in dwelling unitsFRANZ SEBORGAenergy_progress
04/24/2026Duct leakage testing, insulation and designFRANZ SEBORGAenergy_progress
04/24/2026Air barrier continuity plan testingFRANZ SEBORGAenergy_progress
04/24/2026Electric vehicle service equipment requirementsFRANZ SEBORGAenergy_progress
Latest 25 of 92.
▾Documents — 61 on file (BIS + DOB NOW)
▸Seals & Professional Certifications61
▸DOB NOWProgress Inspector Seal & Signature38
09/25/2026X00598750-Z1Open ↗
09/25/2026X00598750-Z1Open ↗
09/25/2026X00598750-Z1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/25/2026X00598750-Z1Open ↗
09/25/2026X00598750-Z1Open ↗
09/01/2026X00598750-S2Open ↗
Showing 3 of 23 on file for this type