2 Open Violations 1 unresolved · 1 paperwork only▸
ECB01/31/2025AT TIME OF INSPECTION, OBSERVED AT EXPOSURE 1,AND 2 ,THE BRICKS AT PARAPET LEVEL HAS BEEN REMOVED ,REDUCING THE HEIGHT,AND BRICK DESIGN, THERE IS NO PERMIT ON FILE FOR THIS WORK ., OBTAIN ALL PERMITS$1K due
ECB02/15/2012VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT. PREMISES IS LOCATED IN A R3-2 ZONING DISTRICT. AT TIME OF INSPECTION OBSERVED REAR YARD CONVERTED TO A CONCRETE PAVED PARKING PAD. OBSERVED NO CURB CUNothing owed — awaiting certificate of correction
Two family brick · 2,000 sf lot · 0.92 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.