← Back
Miscellaneous educational facility
3025 AVENUE U
BROOKLYN · BIN 3427359
💬 Discuss this project
2021Year Built
2.5Stories
W9Building Class
R4Zoning
30,211 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Miscellaneous educational facility · Owner of record: 3025 AVENUE U LLC · 10,000 sf lot · 3.02 FAR built · Flood zone X500
Locations of Work
ElectricalMechanicalPlumbingFire Protection
Roof2p · 2 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2995 CONEY ISLAND2107/08/2026
B WARRANTY HOME CONSTRUCTION2507/08/2026
RELIABLE ENTERPRISES903/22/2026
3025 AVENUE U603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2021$3.0M—— → —$99/sf building
03/28/2019$2.3M—Private party → BWH GROUP LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VERSATILE ENGINEERING, P.C.908/23/2023
VIKATOS ARCHITECT PC101/30/2023
ENTHINK ENGINEERS LLC304/14/2021
FELIX PUSTYLNIK P.E.108/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEP DESIGNS1203/21/2026
ALISTAS SERVICES603/21/2026
DESIMONE CONTRACTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B. WARRANTY HOME CONSGeneral Contractor707/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
MEGA PLBG CORPFire Protection307/08/2026
NICE PLUMBING CORPPlumbing207/08/2026
CHAMPION MECHANICAL INCGeneral Contractor203/21/2026
EFFICIENT CLIMATE SOLUTIOGeneral Contractor107/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
VINBAYTEL DEVELOPMENTS LLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING PROFESSIONAL6393308/23/2023
STEEL CORE ENGINEERING PL1098408/18/2023
Building Lifecycle
All (93)Filed (14)Permit Issued (13)Signed Off (6)Inspection (9)Objection (24)Special Inspection (27)
10/16/2023
Signed off — Alteration
PAA in order to modify Application to show gas operating pressure as less than or equal to 1/2 psi. No change in drawings.
B00222629-I1
09/05/2023
Signed off — Alteration
Install hood with exhaust and fresh air supply fans for commercial kitchen.
B00259232-S2
09/01/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/29/2023
Signed off — Alteration
Install hood with exhaust and fresh air supply fans for commercial kitchen.
B00259232-I1
08/24/2023
Special inspection requirement — HVAC and service water heating system controls
OLEG RUDITSER
08/24/2023
Special inspection requirement — Shutoff dampers
OLEG RUDITSER
08/24/2023
Special inspection requirement — HVAC and service water heating equipment
OLEG RUDITSER
08/24/2023
Special inspection requirement — HVAC insulation and sealing
OLEG RUDITSER
08/24/2023
Special inspection requirement — Mechanical Systems
OLEG RUDITSER
08/24/2023
Special inspection requirement — Final
Younes Abouyaala
08/23/2023
Filed — Alteration
Install hood with exhaust and fresh air supply fans for commercial kitchen.
B00259232-P3
08/18/2023
Filed — Alteration
PAA in order to modify Application to show gas operating pressure as less than or equal to 1/2 psi. No change in drawings.
B00222629-P7
08/18/2023
Special inspection requirement — Standpipe Systems
Alexander Sheyman
08/18/2023
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
07/27/2023
Special inspection requirement — Mechanical Systems
OLEG RUDITSER
07/27/2023
Special inspection requirement — Final
Younes Abouyaala
07/27/2023
Special inspection requirement — Shutoff dampers
OLEG RUDITSER
07/27/2023
Special inspection requirement — HVAC and service water heating equipment
OLEG RUDITSER
07/27/2023
Special inspection requirement — HVAC and service water heating system controls
OLEG RUDITSER
07/27/2023
Special inspection requirement — HVAC insulation and sealing
OLEG RUDITSER
06/16/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/16/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/14/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/14/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/20/2023
Objection resolved — Addressed
05/20/2023
Objection resolved — Addressed
04/04/2023
Objection raised — Mechanical
03/24/2023
Permit issued — Standpipe
B00222629-I1-EW-SP
03/23/2023
Signed off — Alteration
B00199808-I1
03/22/2023
Signed off — Alteration
curb cut 10'-0" in width including splays serving parking garage, in conjuction with NB 321951697
B00819821-I1
03/16/2023
Permit issued — Plumbing
B00222629-I1-EW-SD
03/15/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/08/2023
Objection resolved — Addressed
03/07/2023
Permit issued — Curb Cut
B00819821-I1-CC
03/06/2023
Objection resolved — Addressed
03/06/2023
Objection resolved — Addressed
03/01/2023
Objection raised — Scope
03/01/2023
Objection raised — Scope
03/01/2023
Objection raised — Scope
03/01/2023
Objection raised — Energy
02/27/2023
Permit issued — Mechanical Systems
B00259232-S2-MS
02/26/2023
Filed — Alteration
PAA in order to modify Application to show gas operating pressure as less than or equal to 1/2 psi. No change in drawings.
B00222629-P5
02/01/2023
Objection raised — Admin
02/01/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
01/30/2023
Filed — Alteration
curb cut 10'-0" in width including splays serving parking garage, in conjuction with NB 321951697
B00819821-I1
01/30/2023
Objection raised — Scope
01/30/2023
Objection raised — Inspections
01/30/2023
Objection raised — Scope
01/30/2023
Objection raised — Inspections
01/28/2023
Filed — Alteration
Install hood with exhaust and fresh air supply fans for commercial kitchen.
B00259232-S2
01/28/2023
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
01/28/2023
Special inspection requirement — Standpipe Systems
Alexander Sheyman
01/10/2023
Permit issued — Mechanical Systems
B00259232-I1-MS
12/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2022
Objection resolved — Addressed
12/15/2022
Objection raised — Scope
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offREAL PLUMBING CORP03/24/2023
DOB NOWPlumbingSigned-offREAL PLUMBING CORP03/16/2023
DOB NOWCurb CutSigned-offVINBAYTEL DEVELOPMENTS LL03/07/2023
DOB NOWMechanical SystemsSigned-offCHAMPION MECHANICAL02/27/2023
DOB NOWMechanical SystemsSigned-offEFFICIENT CLIMATE SOLUTIO01/10/2023
DOB NOWSprinklersSigned-offNICE PLUMBING CORP08/29/2022
DOB NOWSprinklersSigned-offREAL PLUMBING CORP06/17/2022
DOB NOWConstruction FenceSigned-offB. WARRANTY HOME CONS09/08/2021
DOB NOWSprinklersSigned-offNICE PLUMBING CORP07/20/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC04/06/2021
DOB NOWConstruction FenceSigned-offB. WARRANTY HOME CONS11/20/2020
DOB NOWConstruction FenceSigned-offB. WARRANTY HOME CONS11/14/2019
DOB NOWConstruction FenceSigned-offB. WARRANTY HOME CONS10/10/2019
BIS—ISSUEDVINBAYTEL DEVELOPMENTS LL06/21/2023
BIS—ISSUEDVINBAYTEL DEVELOPMENTS LL08/24/2022
BIS—ISSUEDVINBAYTEL DEVELOPMENTS LL02/07/2022
BIS—ISSUEDB. WARRANTY HOME CONS12/13/2021
BIS—ISSUEDB. WARRANTY HOME CONS11/05/2021
BIS—ISSUEDB. WARRANTY HOME CONS09/07/2021
BIS—ISSUEDB. WARRANTY HOME CONS09/30/2020
BIS—ISSUEDB. WARRANTY HOME CONS09/30/2020
4 projects · most recent 08/20/2023
General Wiring
FiledStatusContractorScope
08/20/2023CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
06/19/2023CompleteFOREST BROOK ELEC'L CONTR5 meters, 5 new_meters
06/14/2023CompleteSTAR ELEC'L CONTRACTORS C—
04/06/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/01/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/14/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/15/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/24/2023HVAC and service water heating system controls OLEG RUDITSERenergy_progress
08/24/2023Shutoff dampersOLEG RUDITSERenergy_progress
08/24/2023HVAC and service water heating equipment OLEG RUDITSERenergy_progress
08/24/2023HVAC insulation and sealing OLEG RUDITSERenergy_progress
08/24/2023Mechanical SystemsOLEG RUDITSERspecial
08/24/2023FinalYounes Abouyaalaprogress
08/18/2023Standpipe SystemsAlexander Sheymanspecial
08/18/2023Sprinkler SystemsAlexander Sheymanspecial
07/27/2023Mechanical SystemsOLEG RUDITSERspecial
07/27/2023FinalYounes Abouyaalaprogress
07/27/2023Shutoff dampersOLEG RUDITSERenergy_progress
07/27/2023HVAC and service water heating equipment OLEG RUDITSERenergy_progress
07/27/2023HVAC and service water heating system controls OLEG RUDITSERenergy_progress
07/27/2023HVAC insulation and sealing OLEG RUDITSERenergy_progress
01/28/2023Sprinkler SystemsAlexander Sheymanspecial
01/28/2023Standpipe SystemsAlexander Sheymanspecial
11/25/2022HVAC insulation and sealing OLEG RUDITSERenergy_progress
11/25/2022Shutoff dampersOLEG RUDITSERenergy_progress
11/25/2022Final—progress
11/25/2022Mechanical Systems—special
11/25/2022HVAC and service water heating system controls OLEG RUDITSERenergy_progress
11/25/2022HVAC and service water heating equipment OLEG RUDITSERenergy_progress
11/25/2022Sprinkler SystemsAlexander Sheymanspecial
11/25/2022Standpipe SystemsAlexander Sheymanspecial
10/11/2021Sprinkler Systems—special
Latest 25 of 27.
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00222629-I1Request digital key ↗
09/02/2026B00222629-P7Request digital key ↗
08/15/2026B00222629-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/02/2026B00222629-I1Request digital key ↗
09/02/2026B00222629-P2Request digital key ↗
09/02/2026B00222629-P7Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/02/2026B00222629-P7Request digital key ↗
09/02/2026B00222629-I1Request digital key ↗
08/15/2026B00222629-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch5
09/01/2026B00498136-I1Request digital key ↗
09/01/2026B00498136-P2Request digital key ↗
09/01/2026B00498136-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/27/2026B00259232-I1Request digital key ↗
08/15/2026B00259232-P1Request digital key ↗
08/15/2026B00259232-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00199808-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION43
03/27/2025321951697Open ↗
03/25/2025321951697Open ↗
03/20/2025321951697Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION4
02/09/2022321951697Open ↗
10/01/2020321951697Open ↗
10/01/2020321951697Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/15/2022321951697Open ↗
07/15/2022321951697Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
03/20/2023321976732Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
10/06/2023321951697Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/31/2023321951697Open ↗
▸BISZONING DIAGRAM1
12/17/2019321951697Open ↗
▸BISZONING APPEAL1
11/26/2019321951697Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00498136-P2Open ↗
09/01/2026B00498136-P1Open ↗
09/01/2026B00498136-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/30/2026B00259232-I1Open ↗
09/30/2026B00259232-I1Open ↗
09/30/2026B00259232-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/30/2026B00259232-I1Open ↗
09/01/2026B00259232-P3Open ↗
08/23/2026B00222629-P4Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/24/2019321951697Open ↗
11/26/2019321951697Open ↗
11/26/2019321951697Open ↗
▸Trade Schedules & Equipment8
▸BISFA - FDNY APPROVAL : FD-FAA2
04/21/2025321951697Open ↗
04/21/2025321951697Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/30/2023321951697Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/30/2023321951697Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/30/2019321951697Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/24/2023321951697Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/05/2023321951697Open ↗
▸BISBC OFFICE TO ADDRESS OPEN FIRE ALARM APPLICATION1
05/19/2025321951697Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE SIGNOFF2
03/18/2023321976732Open ↗
03/07/2023321951697Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/24/2019321951697Open ↗
▸BISSTREET TREE CHECKLIST1
11/26/2019321951697Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/07/2023321951697Open ↗
06/03/2022321951697Open ↗
06/03/2022321951697Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/24/2019321951697Open ↗
11/26/2019321951697Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/30/2023321951697Open ↗
▸BISINTERIOR LIGHTING POWER1
03/30/2023321951697Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/30/2023321951697Open ↗
▸BISFENESTRATION AREAS1
03/30/2023321951697Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/30/2023321951697Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/30/2023321951697Open ↗
▸BISLIGHTING CONTROLS1
03/30/2023321951697Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/30/2023321951697Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/21/2025321951697Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/03/2022321951697Open ↗
06/03/2022321951697Open ↗
03/22/2022321951697Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/14/2023321951697Open ↗
12/24/2019321951697Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/14/2023321951697Open ↗
▸BISBPP: FIELD INSPECTION1
03/24/2023321976732Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/30/2023321951697Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/30/2023321951697Open ↗
▸BISMASONRY1
03/09/2023321951697Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/09/2023321951697Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/09/2023321951697Open ↗
▸BISSOIL REPORT1
11/26/2019321951697Open ↗
▸BISMECHANICAL SYSTEMS1
03/30/2023321951697Open ↗
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE24
03/27/2025321951697Open ↗
03/25/2025321951697Open ↗
03/20/2025321951697Open ↗
Showing 3 of 24 on file for this type
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
02/09/2022321951697Open ↗
10/01/2020321951697Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/17/2019321976732Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
03/24/2023321976732Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/01/2020321951697Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION15
09/28/2023321951697Open ↗
07/17/2023321951697Open ↗
07/07/2023321951697Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM6
12/27/2019321951697Open ↗
12/27/2019321951697Open ↗
12/27/2019321951697Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
07/10/2019321976732Open ↗
05/30/2019321951697Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/17/2019321976732Open ↗
▸Other Documents10
▸BISLOWEST FLOOR ELEVATION1
03/09/2023321951697Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/24/2023321976732Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
04/28/2025321951697Open ↗
▸BISMAINTENANCE INFORMATION1
03/30/2023321951697Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
03/20/2023321976732Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/10/2024321951697Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/30/2023321951697Open ↗
▸BISSITE CONNECTION:DEP1
11/26/2019321951697Open ↗
▸BISPLOT DIAGRAM1
05/30/2019321951697Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
06/01/2023321951697Open ↗