← Back
Two family converted from one family
3026 BRIGHTON 3 STREET
BROOKLYN · Brighton Beach · BIN 3244740
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R6Zoning
1,504 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 2,000 sf lot · 0.75 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY D. SACHS, PE104/02/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157104/02/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
02/02/2026
Signed off — Alteration
Installation of roof mounted solar. No change in use, egress, or occupancy
B01085909-I1
04/07/2025
Permit issued — Solar
B01085909-I1-SL
04/02/2025
Filed — Alteration
Installation of roof mounted solar. No change in use, egress, or occupancy
B01085909-I1
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
07/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
07/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
07/24/2024
Special inspection requirement — Final
Ralph Pacifico
07/24/2024
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
06/14/2007
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offGREGORY D. SACHS, PE04/07/2025
1 project · most recent 03/21/2025
FiledStatusContractorScope
03/21/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/24/2024Fire-Resistant Penetrations and JointsRalph Pacificospecial
07/24/2024Structural Stability – Alterations of existing buildingsRalph Pacificospecial
07/24/2024Energy Code Compliance InspectionsRalph Pacificoprogress
07/24/2024FinalRalph Pacificoprogress
07/24/2024Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026B01085909-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B01085909-I1Open ↗
08/27/2026B01085909-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026B01085909-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01085909-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026B01085909-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01085909-I1Open ↗