← Back
BuildNYC
Elevator apt, semi-fireproof without stores
303 99TH STREET
BROOKLYN · Bay Ridge · BIN 3155988
💬 Discuss this project
1961Year Built
6Stories
D1Building Class
R6AZoning
50,741 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized68 Active Violations 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Revlyn Apartments · 10,000 sf lot · 5.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade Restoration for Adjacent Building1p · 1 filing · 3 docs
Floor 6Proposed development3p · 1 filing · 9 docs
Floor 5Proposed development3p · 1 filing · 9 docs
Floor 4Proposed development3p · 1 filing · 9 docs
Floor 3Proposed development3p · 1 filing · 9 docs
Floor 2Proposed development3p · 1 filing · 9 docs
Floor 1Proposed development3p · 1 filing · 9 docs
Cellar- Shorefront Apartments6p · 1 filing · 8 docs
Sub-BasementNew Accessory Use Laundry Area5p · 1 filing · 12 docs
Site & exteriorFacade Restoration for Adjacent Building6p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shorefrontapts1107/08/2026
Revlyn Apt703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WRG Engineering104/17/2026
Enthink Engineers107/06/2023
Merritt Engineering Consultants105/30/2023
Sotir Associates104/01/2022
Moore303/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Urena Construction & DesignGeneral Contractor303/21/2026
Sasco BuildersGeneral Contractor203/21/2026
Sasco BuildersScaffold203/21/2026
A&A Building ConsultantsGeneral Contractor107/08/2026
P.H. WorksPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG Engineering4403104/17/2026
Leo Y Lee Associates2481105/30/2023
Merritt Engineering Consulting460105/30/2023
Engineering Consulting SE2050104/01/2022
Moore Associates3408303/23/2021
Building Lifecycle
All (120)Filed (7)Permit Issued (5)Signed Off (5)Facade (FISP) (12)Violation (60)Objection (18)Special Inspection (13)
08/03/2026
Signed off — Alteration
Parking garage restoration project
B01377835-I1
06/10/2026
Permit issued — Structural
B01377835-I1-GC-CX
04/29/2026
Violation issued (HPD, closed)
B
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, closed)
B
04/27/2026
Objection raised — Scope
04/27/2026
Objection raised — Admin
04/27/2026
Objection raised — Scope
04/27/2026
Objection raised — Scope
04/17/2026
Filed — Alteration
Parking garage restoration project
B01377835-I1
04/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Winston Garcia
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Winston Garcia
04/07/2026
Special inspection requirement — Masonry
Winston Garcia
04/01/2026
Violation issued (FDNY_NOV, closed)
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Winston Garcia
03/25/2026
Special inspection requirement — Final
Winston Garcia
12/06/2025
Violation issued (HPD, closed)
B
12/04/2025
Violation issued (HPD, closed)
B
12/04/2025
Violation issued (HPD, closed)
C
12/04/2025
Violation issued (HPD, closed)
C
12/04/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
A
10/02/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
B
04/28/2025
Violation issued (HPD, closed)
C
04/28/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
C
04/28/2025
Violation issued (HPD, closed)
C
04/28/2025
Violation issued (HPD, closed)
C
04/02/2025
Violation issued (ECB, closed)
Elevators
01/04/2025
Violation issued (HPD, closed)
B
10/13/2024
Violation issued (HPD, closed)
B
10/13/2024
Violation issued (HPD, closed)
B
10/13/2024
Violation issued (HPD, closed)
B
10/13/2024
Violation issued (HPD, closed)
B
10/11/2024
Violation issued (HPD, closed)
C
10/11/2024
Violation issued (HPD, closed)
A
10/11/2024
Violation issued (HPD, closed)
A
08/31/2024
Violation issued (HPD, closed)
B
08/31/2024
Violation issued (HPD, closed)
B
08/31/2024
Violation issued (HPD, closed)
C
08/31/2024
Violation issued (HPD, closed)
A
08/31/2024
Violation issued (HPD, closed)
A
08/31/2024
Violation issued (HPD, closed)
B
05/29/2024
Violation issued (HPD, closed)
B
01/25/2024
Signed off — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00871623-I1
12/01/2023
Violation issued (HPD, closed)
C
11/20/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00899441-I1
08/16/2023
Violation issued (ECB, closed)
Elevators
07/31/2023
Permit issued — General Construction
B00871623-I1-GC
07/22/2023
Violation issued (HPD, closed)
B
07/22/2023
Violation issued (HPD, open)
A
07/22/2023
Violation issued (HPD, open)
A
07/06/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00899441-I1
07/06/2023
Permit issued — Sidewalk Shed
B00899441-I1-SH
07/06/2023
Objection resolved — Addressed
06/30/2023
Objection resolved — Addressed
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offA&A Building Consultants06/10/2026
DOB NOWGeneral ConstructionSigned-offSasco Builders07/31/2023
DOB NOWSidewalk ShedSigned-offSasco Builders07/06/2023
DOB NOWGeneral ConstructionSigned-offUrena Construction & Design04/11/2022
DOB NOWPlumbingSigned-offP.H. Works03/12/2021
BISPLISSUEDElite PL & Heating05/16/2005
BISEQISSUEDAM Building Maintenace03/17/2004
BISFSISSUEDManhattan Boiler & Equipment10/21/1991
4 projects · most recent 08/08/2023
General Wiring
FiledStatusContractorScope
08/08/2023Permit IssuedC.falco Eletl ContGeneral Wiring
07/07/2023CompleteRichard Neu—
11/18/2021Permit IssuedAll Ways Electric Corp.w—
12/17/2020Permit IssuedAL-Arm Advanced ElectricalGeneral Wiring
1 project · most recent 04/17/2026
Concrete Masonry
FiledStatusContractorScope
04/17/2026Signed-offA&A Building ConsultantsConcrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/17/2026Concrete - Cast-In-PlaceWinston Garciaspecial
04/17/2026Structural Stability – Alterations of existing buildingsWinston Garciaspecial
04/07/2026MasonryWinston Garciaspecial
03/30/2026Tenant Protection Plan ComplianceWinston Garciaspecial
03/25/2026FinalWinston Garciaprogress
01/12/2022Lighting in dwelling unitsPAUL MARINOenergy_progress
01/12/2022Fire-Resistant Penetrations and JointsPAUL MARINOspecial
01/12/2022Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
01/12/2022Energy Code Compliance InspectionsPAUL MARINOprogress
12/29/2021FinalHany Demetryprogress
03/26/2021Fire-Resistant Penetrations and JointsJAMES MOOREspecial
03/22/2021Fire-Resistant Penetrations and JointsJAMES MOOREspecial
03/15/2021Fire-Resistant Penetrations and JointsJAMES MOOREspecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/30/2026B00654709-I1Request digital key ↗
08/27/2026B00899441-I1Request digital key ↗
08/17/2026B01377835-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00448230-I1Request digital key ↗
08/15/2026B00448230-P1Request digital key ↗
08/15/2026B00448230-P2Request digital key ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00448230-I1Open ↗
09/01/2026B00448230-P2Open ↗
09/01/2026B00448230-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B01377835-I1Open ↗
08/27/2026B01377835-I1Open ↗
08/27/2026B01377835-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026B01377835-I1Open ↗
08/22/2026B00654709-I1Open ↗
08/22/2026B00654709-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00448230-I1Open ↗
09/01/2026B00448230-P1Open ↗
08/17/2026B01377835-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00654709-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00654709-I1Open ↗