Las Raices
303 EAST 102ND STREET · BIN 1091726
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R8AZoning
0 sfGross Floor Area
0Units
Zoned commercial or Manhattan residential · Owner of record: Las Raices Housing Development Fund Comp Any · 1,898 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof125p · 2 filings · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 6Temporary scaffold installation152p · 2 filings · 20 docs
Floor 5Temporary scaffold installation173p · 2 filings · 20 docs
Floor 4Temporary scaffold installation174p · 2 filings · 20 docs
Floor 3Temporary scaffold installation177p · 2 filings · 20 docs
Floor 2Temporary scaffold installation173p · 2 filings · 20 docs
Floor 1Temporary scaffold installation116p · 2 filings · 20 docs
Cellar96p · 1 filing · 20 docs
Site & exterior86p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development2309/15/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dagher Engineering1010/14/2026
GF55 Architects410/14/2026
Amm Engineering203/06/2026
Ashraf209/30/2025
Paul Perdek, Prof. Engineering308/27/2025
Pillori Associates504/10/2025
De Nardis Engineering407/29/2024
AKRF107/10/2024
Hansen Engineering107/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning103/21/2026
A1 Expediting Service603/21/2026
Precision 3Sixty NYC3603/21/2026
Eurocelt Expediting403/21/2026
Lettire Construction103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Lettire ConstructionGeneral Contractor1607/08/2026
Rockledge ScaffoldScaffold504/09/2026
Lettire ConstructionScaffold407/08/2026
Cosan ConstructionScaffold403/21/2026
Demar PlumbingFire Protection309/15/2026
Demar PlumbingPlumbing207/08/2026
Xtreme ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency2542210/14/2026
Building Lifecycle
All (161)Filed (32)Permit Issued (27)Signed Off (10)Inspection (4)Objection (58)Special Inspection (30)
10/14/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-A6
10/14/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-A7
10/14/2026
Special inspection requirement — Air barrier continuity plan testing
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Air barrier — testing
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Lowest Floor Elevation
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Air barrier - visual inspection
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Vestibules
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Protection of exposed foundation insulation
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
10/14/2026
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Exterior lighting power
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Electrical motors and elevators
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Final
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Lighting controls
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Shutoff dampers
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — Metering
MAURICIO ANDRADE
10/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
10/06/2026
Signed off — New Building
Erect new 6 Story Building.
M00737602-S5
10/06/2026
Signed off — New Building
Erect new 6 Story Building.
M00737602-S9
10/06/2026
Signed off — Alteration
INSTALLATION OF SWING STAGE SUSPENDED SCAFFOLDING AS PER PLAN AND IN ACCORDANCE WITH CHAPTER 33 OF NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01321735-I1
10/06/2026
Signed off — New Building
Erect new 6 Story Building.
M00737602-S2
10/06/2026
Signed off — New Building
Erect new 6 Story Building.
M00737602-S1
09/30/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01245115-I1
09/25/2026
Signed off — Alteration
M01173671-S1
09/25/2026
Signed off — Alteration
M01173671-I1
09/22/2026
Signed off — Alteration
M01076201-I1
09/22/2026
Signed off — New Building
Erect new 6 Story Building.
M00737602-S6
09/14/2026
Permit issued — Sprinklers
M00737602-S5-EW-SP
09/09/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
07/29/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-A5
07/24/2026
Objection resolved — Resolved
07/17/2026
Objection raised — Scope
07/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-A3
05/11/2026
Permit issued — Foundation
M00737602-S9-FO
05/01/2026
Objection raised — Scope
05/01/2026
Objection resolved — Resolved
04/16/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-A2
03/23/2026
Permit issued — Protection and Mechanical Methods
M01173671-S1-PMM
03/19/2026
Permit issued — Sidewalk Shed
M01173671-I1-SH
03/06/2026
Filed — Alteration
INSTALLATION OF SWING STAGE SUSPENDED SCAFFOLDING AS PER PLAN AND IN ACCORDANCE WITH CHAPTER 33 OF NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01321735-P1
03/05/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-P8
02/13/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-P9
01/15/2026
Filed — New Building
Erect new 6 Story Building.
M00737602-P7
12/22/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/05/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDemar Plumbing09/14/2026
DOB NOWFoundationSigned-offLettire Construction05/11/2026
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold03/23/2026
DOB NOWSidewalk ShedSigned-offRockledge Scaffold03/19/2026
DOB NOWSuspended ScaffoldSigned-offCosan Construction11/25/2025
DOB NOWGeneral ConstructionPermit IssuedLettire Construction10/23/2025
DOB NOWMechanical SystemsPermit IssuedLettire Construction10/22/2025
DOB NOWConstruction FenceSigned-offLettire Construction10/22/2025
DOB NOWPlumbingPermit IssuedDemar Plumbing09/17/2025
DOB NOWSprinklersSigned-offDemar Plumbing09/11/2025
DOB NOWStructuralSigned-offLettire Construction08/25/2025
DOB NOWMechanical SystemsPermit IssuedLettire Construction08/20/2025
DOB NOWConstruction FenceSigned-offLettire Construction07/15/2025
DOB NOWSupported ScaffoldSigned-offCosan Construction06/24/2025
DOB NOWSidewalk ShedSigned-offRockledge Scaffold03/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold03/24/2025
DOB NOWGeneral ConstructionPermit IssuedLettire Construction11/13/2024
DOB NOWGeneral ConstructionPermit IssuedLettire Construction11/13/2024
DOB NOWGeneral ConstructionPermit IssuedLettire Construction09/27/2024
DOB NOWSupport of ExcavationSigned-offLettire Construction08/30/2024
DOB NOWStructuralSigned-offLettire Construction08/29/2024
DOB NOWFoundationSigned-offLettire Construction08/29/2024
DOB NOWMechanical SystemsPermit IssuedLettire Construction08/27/2024
DOB NOWGeneral ConstructionPermit IssuedLettire Construction08/26/2024
DOB NOWPlumbingPermit IssuedDemar Plumbing08/21/2024
DOB NOWSprinklersSigned-offDemar Plumbing08/21/2024
DOB NOWConstruction FenceSigned-offLettire Construction07/18/2024
1 project · most recent 10/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Signed-offLettire ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PKA-A24KA8 24,000 BTU · Split System ×1
PUZ-A24NHA7 24,000 BTU · Split System ×1
PUY-A24NHA7 24,000 BTU · Split System ×1
PUZ-HA24NHA1 24,000 BTU · Split System ×1
PUZ-HA24NHA7 24,000 BTU · Split System ×1
Ventilation
Renewaire EV PREMIUM L 205 CFM · Erv ×1
EV450 410 CFM · Erv ×1
1 project · most recent 10/14/2026
Sprinkler System
FiledStatusContractorScope
10/14/2026Signed-offDemar PlumbingSprinkler System
1 project · most recent 10/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/14/2026Permit IssuedDemar PlumbingGas, Storm, Water/Sanitary
4 projects · most recent 02/11/2026
General Wiring
FiledStatusContractorScope
02/11/2026Permit IssuedTuxedo Electrical Contracting—
03/21/2025CompleteAnthony G Ferry—
11/18/2024CompleteXtreme ElectricGeneral Wiring
08/08/2024CompleteXtreme Electric1 meters, 1 new_meters
1 project · most recent 10/14/2026
Steel Masonry
FiledStatusContractorScope
10/14/2026Signed-offDemar PlumbingSteel, Masonry
1 project · most recent 09/30/2025
Scaffold
FiledStatusContractorScope
09/30/2025Signed-offCosan ConstructionScaffold
1 project · most recent 03/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/06/2026Signed-offCosan ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/30/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/14/2026Wall Panels, Curtain Walls, and VeneersMAURICIO ANDRADEspecial
10/14/2026VestibulesMAURICIO ANDRADEenergy_progress
10/14/2026Air barrier — testing MAURICIO ANDRADEenergy_progress
10/14/2026Fenestration and door U-factor and product ratingsMAURICIO ANDRADEenergy_progress
10/14/2026Fenestration areasMAURICIO ANDRADEenergy_progress
10/14/2026Air barrier - visual inspectionMAURICIO ANDRADEenergy_progress
10/14/2026Air barrier continuity plan testingMAURICIO ANDRADEenergy_progress
10/14/2026Protection of exposed foundation insulationMAURICIO ANDRADEenergy_progress
10/14/2026Fenestration air leakageMAURICIO ANDRADEenergy_progress
10/14/2026Insulation placement and R valuesMAURICIO ANDRADEenergy_progress
10/14/2026Lowest Floor ElevationMAURICIO ANDRADEprogress
10/14/2026Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
10/14/2026Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
10/14/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/13/2026MeteringMAURICIO ANDRADEenergy_progress
10/13/2026HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
10/13/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/13/2026Heating SystemsMAURICIO ANDRADEspecial
10/13/2026Mechanical SystemsMAURICIO ANDRADEspecial
10/13/2026FinalMAURICIO ANDRADEprogress
10/13/2026Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
10/13/2026Lighting controlsMAURICIO ANDRADEenergy_progress
10/13/2026Shutoff dampersMAURICIO ANDRADEenergy_progress
10/13/2026Maintenance informationMAURICIO ANDRADEenergy_progress
10/13/2026Exterior lighting powerMAURICIO ANDRADEenergy_progress
Latest 25 of 150.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
08/26/2026M00737602-A3Request digital key ↗
08/26/2026M00737602-S3Request digital key ↗
08/26/2026M01076201-I1Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
05/17/2024141025735Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/17/2024141025735Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
10/16/2026M00737602-A7Open ↗
08/17/2026M00737602-P6Open ↗
08/17/2026M00737602-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature33
10/16/2026M00737602-A6Open ↗
10/16/2026M00737602-A7Open ↗
08/26/2026M00737602-S3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/16/2026M00737602-A7Open ↗
10/16/2026M00737602-A6Open ↗
10/16/2026M00737602-A6Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/19/2026M00737602-P9Open ↗
10/16/2026M00737602-A6Open ↗
10/16/2026M00737602-A7Open ↗
Showing 3 of 22 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2024141025735Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/17/2024141025735Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/17/2026M00737602-I1Open ↗
08/17/2026M00737602-P6Open ↗
08/13/2026M00737602-S8Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
10/16/2026M00737602-A7Open ↗
08/17/2026M00737602-P6Open ↗
08/17/2026M00737602-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
05/17/2024141025735Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00737602-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026M00737602-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026M00737602-S1Open ↗
08/13/2026M00737602-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00737602-S1Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
10/16/2026M00737602-A6Open ↗
10/16/2026M00737602-A7Open ↗
08/21/2026M01173671-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
10/16/2026M00737602-A6Open ↗
08/17/2026M00737602-A5Open ↗
08/17/2026M00737602-P3Open ↗
Showing 3 of 12 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
05/17/2024141025735Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/17/2024141025735Open ↗
▸Other Documents20
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
10/16/2026M00737602-A7Open ↗
08/17/2026M00737602-P6Open ↗
08/17/2026M00737602-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
10/16/2026M00737602-A7Open ↗
08/17/2026M00737602-P6Open ↗
08/17/2026M00737602-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
10/16/2026M00737602-A7Open ↗
08/17/2026M00737602-P6Open ↗
08/17/2026M00737602-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations2
08/13/2026M01321735-I1Open ↗
08/13/2026M01321735-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01321735-I1Open ↗
08/13/2026M01321735-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/17/2024141025735Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/17/2026M00737602-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00737602-S6Open ↗