← Back
Miscellaneous two family
303 HOWARD AVENUE
BROOKLYN · BIN 3042342
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R5BZoning
1,680 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · Owner of record: 303 HOWARD LLC · 1,650 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 26p · 1 filing · 20 docs
Floor 1
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
303 HOWARD LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2025$1.3M—— → —$792/sf building
10/23/2024$350K—HOWARD AVE ATLANTIC LLC → DEMS PROPERTY SOLUTIONS INC.$208/sf building
10/23/2024$630K—DEMS PROPERTY SOLUTIONS INC. → 303 HOWARD LLC$375/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP402/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371402/20/2025
Building Lifecycle
All (45)Filed (4)Permit Issued (2)Signed Off (2)Violation (3)Inspection (4)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
03/17/2025
Signed off — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01147952-S1
03/06/2025
Signed off — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01147952-I1
02/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
02/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
02/25/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
02/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
02/25/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
02/25/2025
Special inspection requirement — Mechanical Systems
Eric Sun
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
02/25/2025
Special inspection requirement — Final
Eric Sun
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
02/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
02/25/2025
Special inspection requirement — Maintenance information
Eric Sun
02/25/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
02/25/2025
Special inspection requirement — Interior lighting power
Eric Sun
02/25/2025
Special inspection requirement — Ventilation and air distribution system
Eric Sun
02/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
02/25/2025
Special inspection requirement — Fenestration areas
Eric Sun
02/20/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01147952-P4
02/19/2025
Special inspection requirement — Ventilation and air distribution system
Eric Sun
02/19/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
02/19/2025
Special inspection requirement — Interior lighting power
Eric Sun
02/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
02/19/2025
Special inspection requirement — Fenestration areas
Eric Sun
02/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
02/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
02/19/2025
Special inspection requirement — Maintenance information
Eric Sun
02/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
02/19/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
02/19/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
02/19/2025
Special inspection requirement — Mechanical Systems
Eric Sun
02/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01147952-P1
12/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/24/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2024
Permit issued — General Construction
B01147952-I1-GC-CX
12/02/2024
Permit issued — Plumbing
B01147952-S1-PL
11/29/2024
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01147952-S1
11/29/2024
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01147952-I1
06/03/2008
Violation issued (HPD, closed)
C
06/03/2008
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY12/02/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/02/2024
2 projects · most recent 05/13/2025
General Wiring
FiledStatusContractorScope
05/13/2025CompleteJOSEPH WEINSTEIN ELECTRIC3 meters, 1 new_meters
05/09/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
02/25/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
02/25/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
02/25/2025Insulation placement and R valuesEric Sunenergy_progress
02/25/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
02/25/2025Air barrier - visual inspectionEric Sunenergy_progress
02/25/2025Mechanical SystemsEric Sunspecial
02/25/2025Fire-Resistant Penetrations and JointsEric Sunspecial
02/25/2025Fire-Resistance Rated ConstructionEric Sunprogress
02/25/2025FinalEric Sunprogress
02/25/2025Energy Code Compliance InspectionsEric Sunprogress
02/25/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
02/25/2025Maintenance informationEric Sunenergy_progress
02/25/2025Fenestration air leakageEric Sunenergy_progress
02/25/2025Interior lighting powerEric Sunenergy_progress
02/25/2025Ventilation and air distribution systemEric Sunenergy_progress
02/25/2025Duct leakage testing, insulation and designEric Sunenergy_progress
02/25/2025Fenestration areasEric Sunenergy_progress
02/19/2025Ventilation and air distribution systemEric Sunenergy_progress
02/19/2025Air barrier - visual inspectionEric Sunenergy_progress
02/19/2025Interior lighting powerEric Sunenergy_progress
02/19/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
02/19/2025Fenestration areasEric Sunenergy_progress
02/19/2025Duct leakage testing, insulation and designEric Sunenergy_progress
02/19/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
02/19/2025Maintenance informationEric Sunenergy_progress
Latest 25 of 44.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01147952-S1Request digital key ↗
08/23/2026B01147952-P4Request digital key ↗
08/23/2026B01147952-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature34
09/02/2026B01147952-I1Open ↗
09/02/2026B01147952-I1Open ↗
09/02/2026B01147952-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01147952-I1Open ↗
09/02/2026B01147952-I1Open ↗
09/01/2026B01147952-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01147952-S1Open ↗
08/23/2026B01147952-P1Open ↗
08/23/2026B01147952-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01147952-S1Open ↗
08/23/2026B01147952-P1Open ↗
08/23/2026B01147952-P4Open ↗
Showing 3 of 4 on file for this type