← Back
Elevator cooperative
Lincoln Guild
303 WEST 66 STREET · BIN 1030923
💬 Discuss this project
1962Year Built
20Stories
D4Building Class
R8Zoning
426,476 sfGross Floor Area
421Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: LINCOLN GUILD HOUSING CORP · 55,250 sf lot · 7.72 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 5 filings · 20 docs
Floor 20Under Construction23p · 2 filings · 14 docs
Floor 19Under Construction23p · 2 filings · 14 docs
Floor 18Under Construction23p · 2 filings · 14 docs
Floor 17Under Construction23p · 2 filings · 14 docs
Floor 16Under Construction27p · 4 filings · 20 docs
Floor 15Under Construction23p · 2 filings · 14 docs
Floor 14Under Construction23p · 2 filings · 14 docs
Floor 13Under Construction23p · 2 filings · 14 docs
Floor 12Under Construction23p · 2 filings · 14 docs
Floor 11Under Construction25p · 3 filings · 18 docs
Floor 10Under Construction26p · 3 filings · 20 docs
Floor 9Under Construction23p · 2 filings · 14 docs
Floor 8Under Construction28p · 3 filings · 20 docs
Floor 7Under Construction23p · 2 filings · 14 docs
Floor 6Under Construction23p · 2 filings · 14 docs
Floor 5Under Construction23p · 2 filings · 14 docs
Floor 4Under Construction23p · 2 filings · 14 docs
Floor 3Under Construction23p · 2 filings · 14 docs
Floor 2Under Construction23p · 2 filings · 14 docs
Floor 1Under Construction23p · 2 filings · 14 docs
Cellar6p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCITON CORP1509/21/2026
LINCOLN GUILD HOUSING15309/09/2026
HNL CONSTRUCTION COMPANY203/22/2026
LINCOLN GUILD HOUSING COP103/22/2026
ATLAS BUILDING CORP103/21/2026
C O LINCOLN GUILD HOUSING303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
BOUTIQKEY603/21/2026
QUICK FILING OF NY INC403/21/2026
TRIBECA CONST CONSULTING403/21/2026
XINOS CONSTRUCTION403/21/2026
JULIAN A. GOMEZ203/21/2026
SYNCHRON EXPEDITING403/21/2026
PEROTTO CONSULTING MANAGEMENT803/21/2026
ARINNITY NYC203/21/2026
CLARKE CONSTRUCTION CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1009/16/2026
GALLERY RESTORATION LTDGeneral Contractor403/21/2026
MESA CONSTRUCTION CORPGeneral Contractor303/21/2026
NICK WHITE CONSTRUCTIONGeneral Contractor303/21/2026
TRISTAR PLMBG & HTG INCGeneral Contractor303/21/2026
PK ELECTRIC INCElectrical203/22/2026
NION ELECTRIC CORPElectrical203/22/2026
TRISTAR PLBG & HTG INCPlumbing207/08/2026
RENOVATION BY MY HOME INCGeneral Contractor203/21/2026
WASOFF PLBG & UTILITY COPlumbing207/08/2026
AT CONSTRUCTION & WIRELESSGeneral Contractor207/08/2026
ZAQ CONSTRUCTION INCGeneral Contractor203/21/2026
GIOVANNI MARTINI CONTRACTGeneral Contractor203/21/2026
HIGHLAND PLUMBING LLCPlumbing207/08/2026
SINGER, KURTElectrical103/21/2026
WALTER HOFFMAN CORPElectrical103/21/2026
WALTON, MARCElectrical103/21/2026
A D M CONSTR NY INCGeneral Contractor107/08/2026
BRIGHT REMODELING CONSTGeneral Contractor107/08/2026
A+ ELECTRIC OF GREATER NYElectrical103/22/2026
ESSENTIAL REMODELING INCGeneral Contractor104/09/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
MP WALLS INCGeneral Contractor107/08/2026
WALTER GUERREROGeneral Contractor107/08/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUEENS ENGINEERING PLLC8898406/26/2026
MICHAEL ZENREICH ARCHITEC1724104/28/2026
RYAN SPECIAL ENGINEERING2018209/09/2025
STEEL CORE ENGINEERING PL1098208/20/2025
BUILDTECH ENGINEERING6369111/09/2023
RAND ENGINEERING & ARCHIT266103/07/2023
DEAN MENDEZ ARCHITECT, P.8621103/07/2023
DOMANI INSPECTION SERVICE843101/16/2023
WONG ARCHITECT1272202/02/2022
RAD DESIGN & ARCHITECTURE2082107/16/2021
Building Lifecycle
All (269)Filed (36)Permit Issued (42)Signed Off (22)Facade (FISP) (12)Violation (60)Inspection (29)Objection (38)Special Inspection (30)
09/15/2026
Permit issued — Sidewalk Shed
M01414671-I1-SH
09/08/2026
Permit issued — General Construction
M01387553-I1-GC
07/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/10/2026
Filed — Alteration
Work includes per the filed plans provide davit structure on roof.
M01387553-P1
07/10/2026
Special inspection requirement — Insulation placement and R values
07/10/2026
Special inspection requirement — Final
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Special inspection requirement — Post-installed Anchors
07/09/2026
Special inspection requirement — Insulation placement and R values
07/09/2026
Special inspection requirement — Final
07/09/2026
Special inspection requirement — Post-installed Anchors
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/29/2026
Permit issued — Suspended Scaffold
M01414617-I1-SC
06/26/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01414613-I1
06/26/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR MATERIAL HOIST FOR ROOF REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01414617-I1
06/26/2026
Permit issued — Supported Scaffold
M01414613-I1-SF
06/23/2026
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01414671-I1
06/23/2026
Permit issued — Sidewalk Shed
M01414671-I1-SH
06/09/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/09/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/09/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
06/05/2026
Permit issued — General Construction
M01391813-I1-GC
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/20/2026
Filed — Alteration
Work includes per the filed plans provide davit structure on roof.
M01387553-I1
05/20/2026
Signed off — Alteration
CONSTRUCTION OF PARTITION PER PLANS, REPLACEMENT OF EXISTING PLUMBING FIXTURES IN SAME LOCATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01377983-I1
05/19/2026
Objection raised — Scope
05/19/2026
Objection raised — Energy
05/19/2026
Objection raised — Other
04/28/2026
Filed — Alteration
Applications being filed for interior renovations of Apt 10EE. Work includes non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
M01391813-I1
04/27/2026
Permit issued — General Construction
M01377983-I1-GC
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
04/27/2026
Special inspection requirement — Post-installed Anchors
Michael Zenreich
04/26/2026
Special inspection requirement — Lighting in dwelling units
RAMI IDLBY
04/23/2026
Special inspection requirement — Final
RAMI IDLBY
04/16/2026
Signed off — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR MATERIAL HOIST FOR ROOF REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01226851-I1
03/25/2026
Filed — Alteration
CONSTRUCTION OF PARTITION PER PLANS, REPLACEMENT OF EXISTING PLUMBING FIXTURES IN SAME LOCATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01377983-I1
03/25/2026
Special inspection requirement — Final
Ian Bentley
02/17/2026
Signed off — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-I1
02/17/2026
Signed off — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-S1
01/15/2026
Signed off — Alteration
MATERIAL HOIST
M01284705-I1
01/15/2026
Permit issued — Suspended Scaffold
M01284705-I1-SC
11/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2025
Permit issued — General Construction
M01284105-I1-GC
10/01/2025
Permit issued — Plumbing
M01284105-S1-PL
09/30/2025
Objection raised — Admin
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection raised — Fire_Protection
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Admin
09/18/2025
Permit issued — General Construction
M01269605-I1-GC
09/15/2025
Permit issued — Suspended Scaffold
M01284705-I1-SC
09/09/2025
Filed — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-I1
09/09/2025
Filed — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-S1
09/09/2025
Filed — Alteration
MATERIAL HOIST
M01284705-I1
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
Latest 60 of 269 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP09/15/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP06/29/2026
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP06/26/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP06/23/2026
DOB NOWGeneral ConstructionPermit IssuedA D M CONSTR NY INC06/05/2026
DOB NOWGeneral ConstructionSigned-offBRIGHT REMODELING & CONST04/27/2026
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC01/15/2026
DOB NOWGeneral ConstructionSigned-offNICK WHITE CONSTRUCTION10/07/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP10/01/2025
DOB NOWGeneral ConstructionPermit IssuedESSENTIAL REMODELING INC09/18/2025
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC09/15/2025
DOB NOWSuspended ScaffoldSigned-offXINOS CONSTRUCTION CORP05/16/2025
DOB NOWGeneral ConstructionSigned-offGALLERY RESTORATION LTD01/13/2025
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO09/30/2024
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC09/27/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/15/2024
DOB NOWGeneral ConstructionSigned-offZAQ CONSTRUCTION INC04/16/2024
DOB NOWGeneral ConstructionSigned-offAT CONSTRUCTION & WIRELES04/11/2024
DOB NOWSuspended ScaffoldSigned-offXINOS CONSTRUCTION CORP03/15/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/15/2024
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I01/12/2024
DOB NOWGeneral ConstructionSigned-offGALLERY RESTORATION LTD12/18/2023
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO09/18/2023
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC08/08/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC06/09/2023
DOB NOWGeneral ConstructionSigned-offAT CONSTRUCTION & WIRELES05/25/2023
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP04/25/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP01/12/2023
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP09/28/2022
DOB NOWGeneral ConstructionSigned-offWALTER GUERRERO08/31/2022
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP08/30/2022
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP03/22/2022
DOB NOWGeneral ConstructionSigned-offRENOVATION BY MY HOME INC02/16/2022
DOB NOWGeneral ConstructionSigned-offMP WALLS INC08/30/2021
DOB NOWGeneral ConstructionSigned-offCREATE RENOVATION & DESIG08/25/2021
DOB NOWPlumbingSigned-offSTAR PLUMBING & HTNG LLC06/14/2021
DOB NOWGeneral ConstructionSigned-offMESA CONSTRUCTION CORP05/27/2021
DOB NOWMechanical SystemsSigned-offTRISTAR PLMBG & HTG INC09/22/2020
DOB NOWMechanical SystemsSigned-offBARTOSZ WINSKO03/03/2020
+ 52 more permits on file
1 project · most recent 12/20/2019
Others
FiledStatusContractorScopeMake / Model / Capacity
12/20/2019Signed-offTRISTAR PLMBG & HTG INCOthers
Other
Enervex BEF500X 2,800 CFM · Exhaust Fan ×1
3 projects · most recent 08/20/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/20/2025——Gas, Water/Sanitary
12/20/2019Signed-offTRISTAR PLBG & HTG INCGas, Plumbing-Sprinkler
12/20/2019Signed-offTRISTAR PLBG & HTG INCGas, Plumbing-Sprinkler
25 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedTOWER ELECTRIC INC.—
06/23/2026Permit Issued220 ELECTRIC LLCGeneral Wiring
01/06/2026Permit IssuedLINA ELECTRIC, CORPGeneral Wiring
09/30/2025Permit IssuedBIG CITY ELECL SOLUTIONSGeneral Wiring
09/24/2025Permit IssuedPREMIUM ELECTRIC INCGeneral Wiring
06/06/2025CompleteTOWER ELECTRIC INC.—
02/24/2025CompleteNION ELECTRIC CORPGeneral Wiring
02/10/2025CompleteVOLTRON ELECTRIC LLCGeneral Wiring
01/20/2025CompletePRUDENT ELECTRIC INCGeneral Wiring
12/26/2023CompleteDAGNACHEW & ASSOCIATES IN—
12/23/2023CompleteDELUXE ELECL & MAINT CORPGeneral Wiring
10/26/2023CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring
10/26/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/13/2023CompletePK ELECTRIC INCGeneral Wiring
06/02/2023CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
1 project · most recent 07/10/2026
FiledStatusContractorScope
07/10/2026Permit IssuedXINOS CONSTRUCTION CORP1 scope_items
2 projects · most recent 06/26/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/26/2026Permit IssuedXINOS CONSTRUCTION CORPScaffold
06/23/2026Permit IssuedXINOS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 06/26/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/26/2026Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
07/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
07/10/2026Post-installed Anchors—special
07/10/2026Insulation placement and R values—energy_progress
07/10/2026Final—progress
07/10/2026Tenant Protection Plan Compliance—special
07/09/2026Final—progress
07/09/2026Insulation placement and R values—energy_progress
07/09/2026Tenant Protection Plan Compliance—special
07/09/2026Post-installed Anchors—special
06/09/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
06/09/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
06/09/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
04/27/2026Fire-Resistant Penetrations and JointsMichael Zenreichspecial
04/27/2026Post-installed AnchorsMichael Zenreichspecial
04/26/2026Lighting in dwelling unitsRAMI IDLBYenergy_progress
04/23/2026FinalRAMI IDLBYprogress
03/25/2026FinalIan Bentleyprogress
09/09/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/09/2025FinalAUDRA MANZANOprogress
09/09/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
08/15/2025Lighting controlsChad Murphyenergy_progress
08/15/2025Maintenance informationChad Murphyenergy_progress
08/15/2025Interior lighting powerChad Murphyenergy_progress
08/15/2025Lighting in dwelling unitsChad Murphyenergy_progress
08/14/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
08/14/2025Energy Code Compliance InspectionsChad Murphyprogress
Latest 25 of 66.
▾Documents — 798 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch31
09/03/2026M00521292-I1Request digital key ↗
09/03/2026M00558574-I1Request digital key ↗
09/02/2026M00667028-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00281966-I1Request digital key ↗
09/05/2026M00281973-I1Request digital key ↗
08/15/2026M00466413-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00281971-I1Request digital key ↗
09/05/2026M00281976-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00466394-I1Request digital key ↗
▸Applications & Permits150
▸BISWORK PERMIT APPLICATION78
09/07/2021110004566Open ↗
12/21/2020121625474Open ↗
01/06/2020123849498Open ↗
Showing 3 of 78 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION71
02/06/2022140647637Open ↗
02/06/2022140659927Open ↗
02/06/2022140669211Open ↗
Showing 3 of 71 on file for this type
▸BISAPPLICATION MUST REINSTSTED FOR ADDITIONAL WORK1
10/07/2021110004566Open ↗
▸Seals & Professional Certifications217
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION73
09/18/2019110033721Open ↗
09/18/2019110033721Open ↗
03/19/2019122953438Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/03/2026M00466394-I1Open ↗
09/03/2026M00521292-I1Open ↗
09/03/2026M00558574-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/12/2026M00281971-I1Open ↗
09/01/2026M00281976-I1Open ↗
08/27/2026M01269605-S1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/12/2026M00281971-I1Open ↗
09/12/2026M00281971-I1Open ↗
09/02/2026M00281966-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
07/21/2017123328657Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
07/21/2017123328657Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
07/17/2017140669211Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
07/17/2017140669211Open ↗
Showing 1 of 6 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment50
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
04/20/2020123849498Open ↗
02/26/2019123849498Open ↗
01/09/2019122953438Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING13
06/08/2020123849498Open ↗
06/04/2020123849498Open ↗
05/07/2020123849498Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes13
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
09/29/2017123184712Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00281976-I1Open ↗
08/13/2026M00281971-I1Open ↗
08/13/2026M00281973-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/03/2026M00466394-I1Open ↗
09/03/2026M00558574-I1Open ↗
09/02/2026M00667028-I1Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
02/26/2019123849498Open ↗
09/29/2017123184712Open ↗
Showing 2 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/21/2018123191802Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance58
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
03/19/2019122953438Open ↗
02/26/2019123849498Open ↗
10/02/2018121625474Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
03/19/2019122953438Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
07/31/2020123849498Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00466394-I1Open ↗
08/13/2026M00558574-I1Open ↗
09/02/2026M00667016-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
10/13/2021110004566Open ↗
10/08/2021110004566Open ↗
09/30/2021110004566Open ↗
Showing 3 of 10 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
10/14/2021110004566Open ↗
▸Approvals, Objections & Sign-offs61
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
10/14/2021110004566Open ↗
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSUPERSEDING LETTER11
09/07/2021110004566Open ↗
12/21/2020121625474Open ↗
08/27/2019121625474Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/24/2018121291011Open ↗
Showing 1 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
11/03/2017121291011Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT60
10/14/2021110004566Open ↗
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
Showing 3 of 60 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/14/2021110004566Open ↗
▸Filing & Intake Forms59
▸BISEFILING COVER SHEET22
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
09/29/2017123184712Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM19
09/07/2021110004566Open ↗
04/20/2020123849498Open ↗
09/18/2019110033721Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION10
10/07/2021110004566Open ↗
11/15/2019121625474Open ↗
10/24/2019123849498Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
07/17/2017140669211Open ↗
Showing 1 of 8 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
09/19/2017123328657Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWManufacturer's Specifications4
08/16/2026M01414617-I1Open ↗
08/13/2026M01018898-I1Open ↗
08/13/2026M01284705-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/16/2026M01414617-I1Open ↗
08/13/2026M01226851-I1Open ↗
08/13/2026M01284705-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
08/13/2026M00811890-I1Open ↗