← Back
Over six families without stores
3031 CRUGER AVENUE
BRONX · BIN 2130403
💬 Discuss this project
2021Year Built
4Stories
C1Building Class
R6Zoning
5,280 sfGross Floor Area
8Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 3031 CRUGER LLC · 2,401 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 17 docs
Floor 41p · 1 filing · 17 docs
Floor 3
Floor 2
Floor 13p · 3 filings · 20 docs
Cellar5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY407/08/2026
3031 CRUGER2807/08/2026
576 FAIRVIEW AVE REALTY LLC903/22/2026
H20103/22/2026
H20 LLC 1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS1312/20/2021
SYED ENGINEERING, P.C.104/21/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H20 LLCGeneral Contractor907/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing707/08/2026
FIRST WORLD DEVELOPMENTGeneral Contractor303/21/2026
MOHAMMAD R BADALYElectrical103/21/2026
BADALY ARCHITECT PLLCGeneral Contractor103/22/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394612/20/2021
Building Lifecycle
All (105)Filed (14)Permit Issued (10)Signed Off (8)Violation (23)Inspection (4)Objection (16)Special Inspection (30)
06/16/2025
Violation issued (HPD, closed)
A
03/04/2022
Signed off — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #220721841.
X00312924-I1
02/25/2022
Signed off — Alteration
Provide new boiler in conjunction with NB #220721841
X00315151-S1
02/25/2022
Signed off — Alteration
Provide new boiler in conjunction with NB #220721841
X00315151-I1
02/14/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/07/2022
Permit issued — Boiler Equipment
X00315151-S1-BE
02/01/2022
Signed off — Alteration
FILE STRUCTURAL SCOPE OF WORK IN CONJUNCTION WITH NB#220721841.
X00411349-I1
02/01/2022
Signed off — Alteration
Provide new ventilation and HVAC system in conjunction with NB #220721841.
X00313003-I1
01/14/2022
Permit issued — Mechanical Systems
X00313003-I1-MS
01/13/2022
Signed off — Alteration
X00442690-I1
01/13/2022
Permit issued — Plumbing
X00312924-I1-PL
01/05/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/03/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
X00501172-I1
01/03/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/29/2021
Signed off — Alteration
8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER IN CONJUNCTION WITH DEMO #220672653
X00333343-I1
12/29/2021
Permit issued — Structural
X00411349-I1-ST
12/20/2021
Filed — Alteration
Provide new boiler in conjunction with NB #220721841
X00315151-S1
12/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/20/2021
Special inspection requirement — Heating Systems
Paul Raymond
12/20/2021
Special inspection requirement — Maintenance information
Paul Raymond
12/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
12/17/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/10/2021
Permit issued — Boiler Equipment
X00315151-I1-BE
07/28/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
07/28/2021
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
07/28/2021
Special inspection requirement — Sprinkler Systems
Paul Raymond
07/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/26/2021
Objection resolved — Addressed
07/12/2021
Objection resolved — Addressed
07/12/2021
Objection resolved — Addressed
07/12/2021
Objection resolved — Addressed
07/12/2021
Objection resolved — Addressed
07/08/2021
Objection raised — Mechanical
06/25/2021
Objection raised — Zoning
06/25/2021
Objection raised — Mechanical
06/25/2021
Objection raised — Structural
06/25/2021
Objection raised — Other
06/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/21/2021
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
06/21/2021
Special inspection requirement — Maintenance information
Paul Raymond
06/21/2021
Special inspection requirement — Heating Systems
Paul Raymond
06/21/2021
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
06/21/2021
Special inspection requirement — Shutoff dampers
Paul Raymond
06/16/2021
Filed — Alteration
Provide new boiler in conjunction with NB #220721841
X00315151-P2
06/16/2021
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #220721841.
X00312924-P2
06/15/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
06/15/2021
Special inspection requirement — Sprinkler Systems
Paul Raymond
06/15/2021
Special inspection requirement — Maintenance information
06/15/2021
Special inspection requirement — HVAC and service water heating system controls
06/15/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
06/15/2021
Special inspection requirement — Shutoff dampers
06/15/2021
Special inspection requirement — Heating Systems
06/15/2021
Special inspection requirement — HVAC and service water heating equipment
06/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offLLOYD G DRUMMOND PLBG&GEN02/07/2022
DOB NOWMechanical SystemsSigned-offH20 LLC01/14/2022
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN01/13/2022
DOB NOWStructuralSigned-offH20 LLC12/29/2021
DOB NOWBoiler EquipmentSigned-offLLOYD G DRUMMOND PLBG&GEN12/10/2021
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND06/02/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/21/2021
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN02/12/2021
DOB NOWConstruction FenceSigned-offH20 LLC01/11/2021
DOB NOWConstruction FenceSigned-offFIRST WORLD DEVELOPMENT06/11/2020
BIS—ISSUEDH20 LLC01/28/2021
BIS—ISSUEDH20 LLC01/28/2021
1 project · most recent 01/28/2022
General Wiring
FiledStatusContractorScope
01/28/2022CompleteDENNISON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/14/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2021Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
12/20/2021Heating SystemsPaul Raymondspecial
12/20/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
12/20/2021Maintenance informationPaul Raymondenergy_progress
12/20/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
12/20/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/28/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/28/2021Sprinkler SystemsPaul Raymondspecial
07/28/2021HVAC insulation and sealing Paul Raymondenergy_progress
07/28/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
06/21/2021Maintenance informationPaul Raymondenergy_progress
06/21/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/21/2021Heating SystemsPaul Raymondspecial
06/21/2021Shutoff dampersPaul Raymondenergy_progress
06/21/2021HVAC and service water heating equipment Paul Raymondenergy_progress
06/21/2021HVAC and service water heating system controls Paul Raymondenergy_progress
06/15/2021Fire-Resistant Penetrations and Joints—special
06/15/2021Heating Systems—special
06/15/2021Maintenance information—energy_progress
06/15/2021HVAC and service water heating equipment —energy_progress
06/15/2021Shutoff dampers—energy_progress
06/15/2021HVAC and service water heating system controls —energy_progress
06/15/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/15/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
06/15/2021Sprinkler SystemsPaul Raymondspecial
06/15/2021HVAC insulation and sealing Paul Raymondenergy_progress
Latest 25 of 68.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/24/2026X00315151-P2Request digital key ↗
08/15/2026X00315151-P1Request digital key ↗
08/14/2026X00315151-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00312924-I1Request digital key ↗
08/15/2026X00312924-P1Request digital key ↗
08/15/2026X00312924-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/25/2026X00312924-P1Request digital key ↗
08/25/2026X00312924-I1Request digital key ↗
08/15/2026X00312924-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00313003-I1Request digital key ↗
08/15/2026X00313003-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/25/2026X00442690-I1Request digital key ↗
08/15/2026X00333343-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/25/2026X00501172-I1Request digital key ↗
08/24/2026X00315151-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/25/2026X00411349-I1Request digital key ↗
08/15/2026X00411349-P1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION10
04/21/2022220721841Open ↗
03/31/2022220721841Open ↗
03/29/2022220721841Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
02/03/2021220721841Open ↗
02/03/2021220721841Open ↗
02/03/2021220721841Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/10/2021240285268Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/26/2021240285268Open ↗
01/29/2020220721841Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
01/29/2020220721841Open ↗
01/29/2020220721841Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/28/2020220721841Open ↗
▸BISVERIFY TAX LOT1
01/25/2022220721841Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/25/2022220721841Open ↗
▸BISZONING DIAGRAM1
10/28/2020220721841Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/28/2020220721841Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026X00315151-S1Open ↗
09/23/2026X00315151-I1Open ↗
09/23/2026X00315151-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026X00315151-S1Open ↗
09/23/2026X00315151-I1Open ↗
09/23/2026X00315151-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026X00333343-I1Open ↗
08/25/2026X00313003-I1Open ↗
08/25/2026X00313003-P2Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/21/2020240285268Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/03/2021220721841Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/25/2022220721841Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/25/2022220721841Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/20/2022220721841Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/11/2022220721841Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
08/26/2021240285268Open ↗
01/29/2020220721841Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/22/2021220721841Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/10/2021240285268Open ↗
▸BISSTREET TREE SIGNOFF1
01/25/2022220721841Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/06/2021220721841Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/06/2021220721841Open ↗
04/13/2020220721841Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/25/2022220721841Open ↗
▸BISINTERIOR LIGHTING POWER1
01/25/2022220721841Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/25/2022220721841Open ↗
▸BISFENESTRATION AREAS1
01/25/2022220721841Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
01/25/2022220721841Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/25/2022220721841Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/25/2022220721841Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/25/2022220721841Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/25/2022220721841Open ↗
▸BISLIGHTING CONTROLS1
01/25/2022220721841Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/25/2022220721841Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/25/2022220721841Open ↗
▸BISEXTERIOR LIGHTING POWER1
01/25/2022220721841Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00315151-S1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/06/2021220721841Open ↗
10/08/2020220721841Open ↗
10/08/2020220721841Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
02/25/2022220721841Open ↗
03/03/2021220721841Open ↗
01/22/2021220721841Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
01/25/2022220721841Open ↗
01/22/2021220721841Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/25/2022220721841Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/25/2022220721841Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/25/2022220721841Open ↗
▸BISMASONRY1
01/25/2022220721841Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/25/2022220721841Open ↗
▸BISSOIL REPORT1
10/08/2020220721841Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/08/2020220721841Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/06/2021220721841Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE5
04/21/2022220721841Open ↗
03/31/2022220721841Open ↗
03/29/2022220721841Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/05/2022220721841Open ↗
02/03/2021220721841Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/25/2022220721841Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/25/2022220721841Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/10/2021240285268Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION7
04/27/2022220721841Open ↗
04/21/2022220721841Open ↗
01/05/2022220721841Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
04/06/2020220721841Open ↗
12/27/2019220721841Open ↗
12/23/2019220721841Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/26/2021240285268Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/21/2020240285268Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION2
08/26/2021240285268Open ↗
08/26/2021240285268Open ↗
▸BISSHUTOFF DAMPERS1
01/25/2022220721841Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/28/2020220721841Open ↗
▸BISLOWEST FLOOR ELEVATION1
01/25/2022220721841Open ↗
▸BISMAINTENANCE INFORMATION1
01/25/2022220721841Open ↗