← Back
BuildNYC
Over six families without stores
3031 CRUGER AVENUE
BRONX · BIN 2130403
💬 Discuss this project
2021Year Built
4Stories
C1Building Class
R6Zoning
5,280 sfGross Floor Area
8Units
Rent Stabilized0 Active Violations
Over six families without stores · Owner of record: 3031 Cruger · 2,401 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed 2 8-unit apartment building17p · 4 filings · 20 docs
BulkheadProposed 2 8-unit apartment building1p · 1 filing · 17 docs
Floor 4Proposed 2 8-unit apartment building16p · 4 filings · 20 docs
Floor 3Proposed 2 8-unit apartment building15p · 4 filings · 20 docs
Floor 2Proposed 2 8-unit apartment building15p · 4 filings · 20 docs
Floor 1Proposed 2 8-unit apartment building18p · 4 filings · 20 docs
CellarProposed 2 8-unit apartment building19p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation5p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3031 Cruger2807/08/2026
576 Fairview Ave Realty903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Badaly Architects1312/20/2021
Syed Engineering104/21/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Lloyd G Drummond Plumbing & Genspecialty_contractor807/08/2026
H20 LLCGeneral Contractor503/22/2026
First World DevelopmentScaffold303/21/2026
H20General Contractor203/21/2026
H20 LLCspecialty_contractor203/21/2026
Kings Group NYScaffold107/08/2026
H20 LLCScaffold107/08/2026
Mohammad R BadalyElectrical103/21/2026
H20specialty_contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394612/20/2021
Building Lifecycle
10/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/31/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
10/11/2024
Boiler inspection report filed
Initial · no defects · Accepted
10/19/2023
Boiler inspection report filed
Initial · no defects · Accepted
103 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offLloyd G Drummond Plumbing & Gen02/07/2022
DOB NOWMechanical SystemsSigned-offH20 LLC01/14/2022
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen01/13/2022
DOB NOWStructuralSigned-offH20 LLC12/29/2021
DOB NOWBoiler EquipmentSigned-offLloyd G Drummond Plumbing & Gen12/10/2021
DOB NOWSprinklersSigned-offLloyd G. Drummond06/02/2021
DOB NOWSidewalk ShedSigned-offKings Group NY04/21/2021
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen02/12/2021
DOB NOWConstruction FenceSigned-offH20 LLC01/11/2021
DOB NOWConstruction FenceSigned-offFirst World Development06/11/2020
BIS—ISSUEDH20 LLC01/28/2021
BIS—ISSUEDH20 LLC01/28/2021
1 project · most recent 01/28/2022
General Wiring
FiledStatusContractorScope
01/28/2022CompleteDennison ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/14/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2021Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
12/20/2021Maintenance informationPaul Raymondenergy_progress
12/20/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
12/20/2021Heating SystemsPaul Raymondspecial
12/20/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/20/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/28/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
07/28/2021Sprinkler SystemsPaul Raymondspecial
07/28/2021HVAC insulation and sealing Paul Raymondenergy_progress
07/28/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/21/2021HVAC and service water heating equipment Paul Raymondenergy_progress
06/21/2021Maintenance informationPaul Raymondenergy_progress
06/21/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/21/2021Heating SystemsPaul Raymondspecial
06/21/2021Shutoff dampersPaul Raymondenergy_progress
06/21/2021HVAC and service water heating system controls Paul Raymondenergy_progress
06/15/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/15/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
06/15/2021Sprinkler SystemsPaul Raymondspecial
06/15/2021HVAC insulation and sealing Paul Raymondenergy_progress
06/15/2021Fire-Resistant Penetrations and Joints—special
06/15/2021Heating Systems—special
06/15/2021Maintenance information—energy_progress
06/15/2021HVAC and service water heating equipment —energy_progress
06/15/2021Shutoff dampers—energy_progress
06/15/2021HVAC and service water heating system controls —energy_progress
Latest 25 of 68.
167 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account