← Back
BuildNYC
Over six families without stores
3033 CRUGER AVENUE
BRONX · BIN 2130577
💬 Discuss this project
2021Year Built
4Stories
C1Building Class
R6Zoning
5,720 sfGross Floor Area
8Units
Rent Stabilized0 Active Violations 2 likely answered ▸
Over six families without stores · Owner of record: 3031 Cruger · 2,600 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed 8-unit apartment building plumbing13p · 4 filings · 20 docs
BulkheadProposed 8-unit apartment building plumbing1p · 1 filing · 6 docs
Floor 4Proposed 8-unit apartment building plumbing13p · 4 filings · 20 docs
Floor 3Proposed 8-unit apartment building plumbing13p · 4 filings · 20 docs
Floor 2Proposed 8-unit apartment building plumbing13p · 4 filings · 20 docs
Floor 1Proposed 8-unit apartment building plumbing13p · 4 filings · 20 docs
CellarProposed 8-unit apartment building plumbing13p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation4p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3031 Cruger2207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2018$425K—Private party → 3031 Cruger— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Badaly Architects702/02/2022
Syed Engineering104/21/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H20 LLCGeneral Contractor407/08/2026
Mohammad R BadalyElectrical303/21/2026
Kings Group NYScaffold303/21/2026
Lloyd G Drummond Plumbing & GenFire Protection207/08/2026
Lloyd G Drummond Plumbing & GenPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394602/02/2022
Building Lifecycle
10/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/31/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
01/09/2025
§ 27-2033 ADM code provide ready access to buildings heating system door locked at boiler room
HPD violation · closed
01/09/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · closed
82 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen02/24/2022
DOB NOWBoiler EquipmentSigned-offLloyd G Drummond Plumbing & Gen01/28/2022
DOB NOWMechanical SystemsSigned-offH20 LLC01/05/2022
DOB NOWStructuralSigned-offH20 LLC12/29/2021
DOB NOWSprinklersSigned-offLloyd G. Drummond08/09/2021
DOB NOWSprinklersSigned-offLloyd G. Drummond06/02/2021
DOB NOWSidewalk ShedSigned-offKings Group NY04/21/2021
BIS—ISSUEDH20 LLC06/14/2021
BIS—ISSUEDH20 LLC01/28/2021
1 project · most recent 01/28/2022
General Wiring
FiledStatusContractorScope
01/28/2022CompleteDennison ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/10/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/02/2022Fail-Final Boiler Equipment InspectionFailView ↗
01/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/03/2022HVAC-R and service water heating system controlsPaul Raymondenergy_progress
02/03/2022HVAC-R and service water heating equipmentPaul Raymondenergy_progress
02/03/2022Maintenance informationPaul Raymondenergy_progress
02/03/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/03/2022Heating SystemsPaul Raymondspecial
02/02/2022HVAC-R and service water heating equipmentPaul Raymondenergy_progress
02/02/2022Maintenance informationPaul Raymondenergy_progress
02/02/2022Heating SystemsPaul Raymondspecial
02/02/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/02/2022HVAC-R and service water heating system controlsPaul Raymondenergy_progress
12/16/2021Maintenance informationPaul Raymondenergy_progress
12/16/2021Mechanical SystemsPaul Raymondspecial
12/16/2021FinalPaul Raymondprogress
12/16/2021Duct leakage testing, insulation and designPaul Raymondenergy_progress
12/16/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
12/16/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
12/16/2021Permanent certificatePaul Raymondenergy_progress
12/16/2021HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
12/16/2021Electrical motors and elevatorsPaul Raymondenergy_progress
04/09/2021FinalRAFI HAMIDprogress
12/02/2020FinalPaul Raymondprogress
12/02/2020Structural Steel - High Strength BoltingPaul Raymondspecial
12/02/2020Structural Steel - WeldingPaul Raymondspecial
12/02/2020Post-installed AnchorsPaul Raymondspecial
12/02/2020MasonryPaul Raymondspecial
Latest 25 of 28.
51 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account