← Back
Three families
3038 COLDEN AVENUE
BRONX · BIN 2055831
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
3,780 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸
Three families · Owner of record: 3 PARKSIDE LLC · 2,500 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 12 docs
Floor 11 filing · 12 docs
Cellar3p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3 PARKSIDE1507/08/2026
HOUSING PRESERVATION & DEVELOPMENT503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/16/2024$825K—3038 COLDEN SI LLC → 3 PARKSIDE LLC$218/sf building
03/27/2024$500K—Private party → 3038 COLDEN SI LLC$132/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILLAH ENGINEERING PLLC307/06/2025
AK CONSULTING SERVICES, INC106/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS603/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTRUCTION &General Contractor303/21/2026
UMAR HOME IMPROVEMENT &General Contractor207/08/2026
CJ HEATING & MECHANICAL CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369107/13/2024
Building Lifecycle
All (68)Filed (4)Permit Issued (4)Violation (58)Inspection (2)
04/30/2026
Violation issued (HPD, open)
A
07/06/2025
Filed — Alteration
SUBSEQUENT FILING TO ADD PLUMBING WORK TYPE RELATED TO JOB# X01062507-I1, REPLACING SANITARY & GAS FIXTURES AT EXISTING BATHROOMS & KITCHENS. ALSO REPLACING EXISTING BOILER WITH (3) INDIVIDUAL BOILERS AND (3) NEW GAS HWHs. WORK AS PER PLANS.
X01062507-P1
06/04/2025
Violation issued (HPD, open)
A
03/11/2025
Permit issued — General Construction
X01062507-I1-GC
12/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2024
Violation issued (HPD, closed)
I
11/21/2024
Permit issued — Plumbing
X01062507-S1-PL
10/13/2024
Filed — Alteration
SUBSEQUENT FILING TO ADD PLUMBING WORK TYPE RELATED TO JOB# X01062507-I1, REPLACING SANITARY & GAS FIXTURES AT EXISTING BATHROOMS & KITCHENS. ALSO REPLACING EXISTING BOILER WITH (3) INDIVIDUAL BOILERS AND (3) NEW GAS HWHs. WORK AS PER PLANS.
X01062507-S1
09/27/2024
Permit issued — Construction Fence
X01067924-I1-FN
08/29/2024
Permit issued — General Construction
X01062507-I1-GC
07/13/2024
Filed — Alteration
SUBSEQUENT FILING TO ADD PLUMBING WORK TYPE RELATED TO JOB# X01062507-I1, REPLACING SANITARY & GAS FIXTURES AT EXISTING BATHROOMS & KITCHENS. ALSO REPLACING EXISTING BOILER WITH (3) INDIVIDUAL BOILERS AND (3) NEW GAS HWHs. WORK AS PER PLANS.
X01062507-I1
06/25/2024
Filed — Alteration
INSTALLATION OF THE TEMPORARY CONSTRUCTION PLYWOOD FENCE AT 3038 COLDEN AVENUE, BRONX 10469 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01067924-I1
05/13/2024
Violation issued (ECB, closed)
Construction
05/13/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/13/2024
Violation issued (ECB, closed)
Construction
04/24/2024
Violation issued (HPD, closed)
B
04/02/2024
Violation issued (HPD, open)
A
12/19/2023
Violation issued (HPD, closed)
B
12/19/2023
Violation issued (HPD, closed)
B
12/19/2023
Violation issued (HPD, closed)
B
12/19/2023
Violation issued (HPD, closed)
C
12/19/2023
Violation issued (HPD, closed)
B
12/19/2023
Violation issued (HPD, closed)
B
12/19/2023
Violation issued (HPD, closed)
C
12/19/2023
Violation issued (HPD, closed)
A
12/19/2023
Violation issued (HPD, open)
C
12/19/2023
Violation issued (HPD, closed)
B
12/19/2023
Violation issued (HPD, open)
C
12/19/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, closed)
C
12/16/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, closed)
A
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, closed)
C
12/16/2023
Violation issued (HPD, closed)
A
12/16/2023
Violation issued (HPD, closed)
C
12/16/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, closed)
A
12/16/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, open)
C
12/16/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, closed)
C
12/16/2023
Violation issued (HPD, closed)
B
12/16/2023
Violation issued (HPD, closed)
A
12/16/2023
Violation issued (HPD, closed)
A
12/16/2023
Violation issued (HPD, closed)
B
11/16/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, open)
A
12/30/2022
Violation issued (HPD, open)
C
12/30/2022
Violation issued (HPD, closed)
C
12/30/2022
Violation issued (HPD, closed)
B
11/04/2022
Violation issued (HPD, closed)
I
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUMAR HOME IMPROVEMENT &03/11/2025
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C11/21/2024
DOB NOWConstruction FencePermit IssuedINNOVATIVE CONSTRUCTION &09/27/2024
DOB NOWGeneral ConstructionPermit IssuedUMAR HOME IMPROVEMENT &08/29/2024
1 project · most recent 07/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/06/2025Signed-offJL PLUMBING, LLCGas, Water/Sanitary
1 project · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedSUPREME ELECTRIC CORPGeneral Wiring
1 project · most recent 06/25/2024
Fence
FiledStatusContractorScope
06/25/2024Permit IssuedINNOVATIVE CONSTRUCTION &Fence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/13/2024Structural Stability – Alterations of existing buildingsLuis Pichardospecial
07/12/2024Fire-Resistant Penetrations and JointsLuis Pichardospecial
06/14/2024FinalMOHAMMAD BILLAHprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026X01067924-I1Request digital key ↗
08/19/2026X01062507-S1Request digital key ↗
08/19/2026X01062507-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026X01062507-S1Open ↗
08/19/2026X01062507-I1Open ↗
08/19/2026X01062507-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X01062507-I1Open ↗
08/26/2026X01062507-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026X01062507-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026X01062507-I1Open ↗
08/19/2026X01062507-P1Open ↗
08/19/2026X01062507-S1Open ↗