Two family frame
3038 WILSON AVENUE
BRONX · Pelham Gardens · BIN 2056093
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R5Zoning
1,584 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Two family frame · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed photovoltaic solar array installation4p · 1 filing · 13 docs
Penthouse1 filing · 14 docs
Floor 41 filing · 14 docs
Floor 3
Floor 21 filing · 2 docs
Floor 1Unit 1A, Unit 1B2 filings · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs410/09/2026
R & S Associates208/04/2026
Green River Environmental Engineering201/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor303/21/2026
Proscia Electl ContrngElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841201/20/2025
Building Lifecycle
10/30/2026
Objection raised — Scope
10/09/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01429188-S4
09/16/2026
Objection raised — Zoning
09/08/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01429188-S3
09/01/2026
Objection raised — Scope
44 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS03/01/2024
3 projects · most recent 07/12/2024
General Wiring Lighting
FiledStatusContractorScope
07/12/2024Permit IssuedNY Solar Electrical—
06/26/2024CompleteNY Solar Electrical—
06/15/2018Permit IssuedProscia Electl ContrngGeneral Wiring, Lighting
1 project · most recent 10/09/2026
Steel
FiledStatusContractorScope
10/09/2026——Steel
1 project · most recent 10/09/2026
Fence
FiledStatusContractorScope
10/09/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/04/2026Structural Cold-Formed Steel—special
08/04/2026Structural Stability – Alterations of existing buildings—special
08/04/2026Post-installed Anchors—special
08/04/2026Structural Steel - Welding—special
08/04/2026Structural Steel - High Strength Bolting—special
08/04/2026Structural Steel - Details—special
08/03/2026Final—progress
07/14/2026Final—progress
07/10/2026Fenestration air leakage—energy_progress
07/10/2026Air barrier — testing —energy_progress
07/10/2026Fenestration areas—energy_progress
07/10/2026Fenestration and door U-factor and product ratings—energy_progress
07/10/2026Maintenance information—energy_progress
07/10/2026Interior lighting power—energy_progress
07/10/2026Air barrier - visual inspection—energy_progress
07/10/2026Metering—energy_progress
07/10/2026Permanent certificate—energy_progress
07/10/2026Insulation placement and R values—energy_progress
07/10/2026Protection of exposed foundation insulation—energy_progress
07/10/2026Exterior Insulation and Finish Systems (EIFS)—special
07/10/2026Fire-Resistant Penetrations and Joints—special
07/10/2026Energy Code Compliance Inspections—progress
07/10/2026Fire-Resistance Rated Construction—progress
01/21/2025FinalROBERT MASONEprogress
01/21/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
Latest 25 of 33.