← Back
BuildNYC
All parking garages
304 WEST 49TH STREET
MANHATTAN · BIN 1025145
💬 Discuss this project
1930Year Built
6Stories
G1Building Class
R8Zoning
28,245 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only 2 old, status unconfirmed ▸
All parking garages · Owner of record: 304 West 49th Garage · 5,028 sf lot · 5.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofIparkUnder Construction6p · 2 filings · 20 docs
Floor 6Garage repairsUnder Construction5p · 2 filings · 20 docs
Floor 5Garage repairsUnder Construction6p · 2 filings · 20 docs
Floor 4Garage repairsUnder Construction5p · 2 filings · 20 docs
Floor 3Garage repairsUnder Construction6p · 2 filings · 20 docs
Floor 2Garage repairsUnder Construction5p · 2 filings · 20 docs
Floor 1Garage repairsUnder Construction5p · 2 filings · 20 docs
CellarGarage repairsUnder Construction6p · 2 filings · 20 docs
BasementProbes and temporary shoring1p · 1 filing · 5 docs
Site & exteriorIparkUnder Construction21p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
304 West 49th Garage103/22/2026
304 Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Volume Space Consulting304/12/2026
EDG503/10/2025
Enthink Engineers105/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-Ace Services303/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Thomas MaintenanceGeneral Contractor1307/11/2026
MBR Restorationspecialty_contractor908/30/2026
Andamio ScaffoldingScaffold707/30/2026
Ace Group NYScaffold510/02/2026
HY-Lee Electric CoElectrical203/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Soni Engineering Consulting9819308/17/2026
EDG2578503/10/2025
Building Lifecycle
All (114)Filed (12)Permit Issued (29)Signed Off (1)Violation (59)Special Inspection (13)
10/01/2026
Permit issued — Sidewalk Shed
M01204078-I1-SH
08/27/2026
Permit issued — Structural
M01088226-I1-GC
08/17/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1 change in tieback, added outrigger detail and anchor detail
M01115022-P2
08/17/2026
Special inspection requirement — Post-installed Anchors
nayan soni
08/17/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
07/29/2026
Permit issued — Sidewalk Shed
M00875746-I1-SH
07/20/2026
Permit issued — Suspended Scaffold
M01115022-I1-SC
07/10/2026
Permit issued — Structural
M00879676-I1-ST
07/09/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1 change in tieback, added outrigger detail and anchor detail
M01115022-P1
07/07/2026
Permit issued — General Construction
M01088226-I1-GC
07/06/2026
Permit issued — Sidewalk Shed
M01204078-I1-SH
06/29/2026
Permit issued — General Construction
M01088226-I1-GC
06/10/2026
Signed off — Alteration
PROBES AND TEMPORARY SHORING AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00870717-I1
05/04/2026
Permit issued — Sidewalk Shed
M00875746-I1-SH
04/18/2026
Violation issued (ECB, closed)
Construction
04/18/2026
Violation issued (ECB, closed)
Construction
04/13/2026
Permit issued — Supported Scaffold
M01385543-I1-SF
04/12/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01385543-I1
04/02/2026
Permit issued — Sidewalk Shed
M01204078-I1-SH
04/01/2026
Permit issued — Suspended Scaffold
M01115022-I1-SC
03/12/2026
Permit issued — General Construction
M01088226-I1-GC
08/11/2025
Permit issued — Structural
M01088226-I1-GC
07/16/2025
Permit issued — Suspended Scaffold
M01115022-I1-SC
07/03/2025
Permit issued — Structural
M00879676-I1-ST
06/05/2025
Permit issued — Structural
M00870717-I1-ST
05/27/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01204078-P1
05/06/2025
Permit issued — Sidewalk Shed
M00875746-I1-SH
04/02/2025
Permit issued — Sidewalk Shed
M01204078-I1-SH
04/01/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01204078-I1
03/14/2025
Permit issued — Suspended Scaffold
M01115022-I1-SC
03/10/2025
Filed — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879676-P2
03/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
03/10/2025
Special inspection requirement — Sprayed fire-resistant materials
Anthony Stasio
03/10/2025
Special inspection requirement — Final
Anthony Stasio
03/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
03/10/2025
Special inspection requirement — Structural Steel - Welding
Anthony Stasio
10/01/2024
Permit issued — Structural
M01088226-I1-GC
10/01/2024
Permit issued — Structural
M01088226-I1-ST
09/27/2024
Permit issued — Suspended Scaffold
M01115022-I1-SC
09/20/2024
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1 change in tieback, added outrigger detail and anchor detail
M01115022-I1
08/20/2024
Filed — Alteration
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01088226-I1
07/30/2024
Special inspection requirement — Masonry
Anthony Stasio
07/30/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
07/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
07/30/2024
Special inspection requirement — Final
Anthony Stasio
07/01/2024
Permit issued — Structural
M00879676-I1-ST
06/04/2024
Permit issued — Structural
M00870717-I1-ST
05/09/2024
Permit issued — Sidewalk Shed
M00875746-I1-SH
12/28/2023
Violation issued (ECB, closed)
Construction
11/14/2023
Violation issued (ECB, closed)
Construction
11/02/2023
Filed — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879676-P1
09/22/2023
Violation issued (ECB, closed)
Construction
07/13/2023
Violation issued (ECB, closed)
Construction
06/30/2023
Permit issued — Structural
M00879676-I1-ST
06/23/2023
Filed — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00879676-I1
06/06/2023
Permit issued — Structural
M00870717-I1-ST
05/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2023
Filed — Alteration
M00875746-I1
05/19/2023
Permit issued — Sidewalk Shed
M00875746-I1-SH
05/12/2023
Filed — Alteration
PROBES AND TEMPORARY SHORING AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00870717-I1
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAce Group NY10/01/2026
DOB NOWStructuralPermit IssuedMBR Restoration08/27/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding07/29/2026
DOB NOWSuspended ScaffoldPermit IssuedAvenue Contracting07/20/2026
DOB NOWStructuralPermit IssuedThomas Maintenance07/10/2026
DOB NOWGeneral ConstructionPermit IssuedMBR Restoration07/07/2026
DOB NOWSidewalk ShedPermit IssuedAce Group NY07/06/2026
DOB NOWGeneral ConstructionPermit IssuedMBR Restoration06/29/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding05/04/2026
DOB NOWSupported ScaffoldPermit IssuedAce Group NY04/13/2026
DOB NOWSidewalk ShedPermit IssuedAce Group NY04/02/2026
DOB NOWSuspended ScaffoldPermit IssuedAvenue Contracting04/01/2026
DOB NOWGeneral ConstructionPermit IssuedMBR Restoration03/12/2026
DOB NOWStructuralPermit IssuedMBR Restoration08/11/2025
DOB NOWSuspended ScaffoldPermit IssuedAvenue Contracting07/16/2025
DOB NOWStructuralPermit IssuedThomas Maintenance07/03/2025
DOB NOWStructuralSigned-offThomas Maintenance06/05/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding05/06/2025
DOB NOWSidewalk ShedPermit IssuedAce Group NY04/02/2025
DOB NOWSuspended ScaffoldPermit IssuedAvenue Contracting03/14/2025
DOB NOWStructuralPermit IssuedMBR Restoration10/01/2024
DOB NOWStructuralPermit IssuedMBR Restoration10/01/2024
DOB NOWSuspended ScaffoldPermit IssuedAvenue Contracting09/27/2024
DOB NOWStructuralPermit IssuedThomas Maintenance07/01/2024
DOB NOWStructuralSigned-offThomas Maintenance06/04/2024
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding05/09/2024
DOB NOWStructuralPermit IssuedThomas Maintenance06/30/2023
DOB NOWStructuralSigned-offThomas Maintenance06/06/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding05/19/2023
BISOTISSUEDThomas Maintenance06/04/2014
BISOTISSUEDThomas Maintenance12/02/2013
BISEQISSUEDL&B Construction NY06/30/2005
BIS—ISSUEDGoing Sign Co08/23/1993
2 projects · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026Permit IssuedHigh Quality Electric of NYC—
05/16/2023Permit IssuedBorowide Elect'l Contractors—
3 projects · most recent 03/10/2025
Concrete
FiledStatusContractorScope
03/10/2025Permit IssuedThomas MaintenanceConcrete
08/20/2024Permit IssuedMBR Restoration1 scope_items
05/12/2023Signed-offThomas Maintenance1 scope_items
2 projects · most recent 04/12/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/12/2026Permit IssuedAce Group NYScaffold
05/27/2025Permit IssuedAce Group NYSidewalk Shed
1 project · most recent 08/17/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/17/2026Permit IssuedAvenue ContractingSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/17/2026Post-installed Anchorsnayan sonispecial
08/17/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
03/10/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
03/10/2025Sprayed fire-resistant materialsAnthony Stasiospecial
03/10/2025FinalAnthony Stasioprogress
03/10/2025Concrete - Cast-In-PlaceAnthony Stasiospecial
03/10/2025Structural Steel - WeldingAnthony Stasiospecial
07/30/2024MasonryAnthony Stasiospecial
07/30/2024Post-installed AnchorsAnthony Stasiospecial
07/30/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
07/30/2024FinalAnthony Stasioprogress
05/05/2023FinalAnthony Stasioprogress
05/05/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
IparkParking—
Project M01088226 Alteration · Permit Entire · 08/20/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026M00870717-I1Request digital key ↗
08/31/2026M00875746-I1Request digital key ↗
08/31/2026M00875746-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
06/18/2014121733614Open ↗
12/05/2013121733614Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026M00870717-I1Open ↗
08/31/2026M00875746-P1Open ↗
08/31/2026M00875746-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/30/2026M00879676-I1Open ↗
08/30/2026M00879676-I1Open ↗
08/30/2026M00879676-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026M00879676-I1Open ↗
08/29/2026M00870717-I1Open ↗
08/28/2026M01088226-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/29/2017121733614Open ↗
▸Safety & Tenant Protection11
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist10
08/31/2026M00875746-P1Open ↗
08/13/2026M00875746-I1Open ↗
08/13/2026M01204078-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M01088226-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026M00879676-I1Open ↗
08/24/2026M00879676-P2Open ↗
08/24/2026M00879676-P1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026M01088226-I1Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS1
06/29/2017121733614Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/29/2017121733614Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/29/2017121733614Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/29/2017121733614Open ↗
▸Other Documents8
▸DOB NOWManufacturer's Specifications4
08/26/2026M01115022-I1Open ↗
08/26/2026M01115022-P1Open ↗
08/19/2026M01115022-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/26/2026M01115022-I1Open ↗
08/26/2026M01115022-P1Open ↗
08/19/2026M01115022-P2Open ↗
Showing 3 of 4 on file for this type