ECB02/26/2024FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #906792. REMEDY: FILE ACCEPTABLE REPORT.$-30 due
DOB11/12/2019V-DOB VIOLATION - ACTIVE
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
ECB12/18/200739Z10.39-REPAIR ROOM OVERHEAD CEILING.$-180 due
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
ECB10/02/2024OBSERVED IN THE BASEMENT. SPRINKLER HEADS FOR EVERETT LOUNGE AND MILBANK CHAPEL TIED INTO DOMESTIC WATER LINE AND NOT THE DEDICATED FIRE LINE IN THE BUILDING. ALSO NO BACK FLOW PREVENTER ON SPRINKLER SYSTEM. RENothing owed — awaiting certificate of correction
ECB07/21/2021FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITON OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#806793.AGG1:PRIOR NOV 37010535X UNDER 28Nothing owed — awaiting certificate of correction
ECB12/05/2019FAILURE TO MAINTAIN EXTERIOR BUILDING TOWER-COLUMNS SPALLING BRICK CO-VING. BOILER CHIMNEY BRICK NORTHSIDE MISSING GROUT. SOUTH ROOF MISSING TILES. COOLING TOWER INSULATION MISSING. DEFECTIVE, DUNNAGE RUSTING.Nothing owed — awaiting certificate of correction
ECB08/09/2018FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#806793. REMEDY: SUBMIT REQUIRED TECHNICAL REPORTNothing owed — awaiting certificate of correction
ECB11/22/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000393 HASBEEN INSPECTED,TESTED,AND DISINFECTED,AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED,BY NOVEMBER 1,2016.REM:FILE ANNUAL CERTNothing owed — awaiting certificate of correction
ECB05/31/2017FAILURE TO MAINTAIN EXTERIOR BUILDIGN FACDE AND APPURTENANCES.NOTE:SOUTH ELEVATIN EXPOSURE #1 LOOSE AND DETERIORATING MOTAR JOINTS AT TWO LOCATIONS ABOVE 5TH FLOOR.SPALLED EYEBROW AT 2ND FLOOR.SPALLING BRICK ALNothing owed — awaiting certificate of correction
ECB10/30/1992FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION ON DIFFERENT LOCATIONS. CAFERTERING GYMNASIUMS, AUDITORIUMS, LECTURE LOUNG. REMEDY: OBTAIN & PROVIDE APPROVED PA PLANS FORTHWITH.Nothing owed — awaiting certificate of correction