← Back
Three families
3039 YOUNG AVENUE
BRONX · Pelham Gardens · BIN 2130874
💬 Discuss this project
2025Year Built
2Stories
C0Building Class
R5Zoning
2,950 sfGross Floor Area
3Units
10 Open Violations ▸
Three families · Owner of record: LISUS PROPERTIES LLC · 2,500 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionGeneral
Roof1p · 1 filing · 8 docs
Floor 214p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Basement12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UPSTRATE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/20/2023$530K—Private party → LISUS PROPERTIES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAKOV SARIC408/12/2026
TOM PETERSEN ARCHITECT, LLC105/07/2026
RADOMIR DELIC1002/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING1603/21/2026
NODE ARCHITECTURE,ENGINEERING,CON803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BDB CONSTRUCTION ENTERPRIGeneral Contractor407/08/2026
STRUCTURELINE INCGeneral Contractor306/28/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
VOLTAIC SOLAIRE LLCGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE67991208/12/2026
THOMAS PETERSEN ARCHITECT7854105/07/2026
INTERNATIONAL GEOTEHCNICA1795702/26/2026
Building Lifecycle
All (76)Filed (15)Permit Issued (9)Signed Off (8)Violation (1)Inspection (13)Special Inspection (30)
08/19/2026
Signed off — Alteration
Installation of PV solar on existing roof no change to egress or use of occupancy
X01391081-I1
08/12/2026
Filed — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-P7
08/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/03/2026
Special inspection requirement — Insulation placement and R values
Radomir Delic
08/03/2026
Special inspection requirement — Fenestration areas
Radomir Delic
08/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
08/03/2026
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
08/03/2026
Special inspection requirement — Ventilation and air distribution system
Radomir Delic
08/03/2026
Special inspection requirement — Fenestration air leakage
Radomir Delic
08/03/2026
Special inspection requirement — Interior lighting power
Radomir Delic
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
08/03/2026
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
08/03/2026
Special inspection requirement — Metering
Radomir Delic
08/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Radomir Delic
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
08/03/2026
Special inspection requirement — Permanent certificate
Radomir Delic
08/03/2026
Special inspection requirement — Maintenance information
Radomir Delic
08/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
Radomir Delic
08/03/2026
Special inspection requirement — Air barrier — testing
Radomir Delic
08/03/2026
Special inspection requirement — Electric vehicle service equipment requirements
Radomir Delic
07/20/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S2
07/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S7
07/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/26/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/22/2026
Permit issued — Mechanical Systems
X00917240-S2-MS
06/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Radomir Delic
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
06/11/2026
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
06/11/2026
Special inspection requirement — Interior lighting power
Radomir Delic
06/11/2026
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
06/11/2026
Special inspection requirement — Permanent certificate
Radomir Delic
06/11/2026
Special inspection requirement — Fenestration areas
Radomir Delic
06/11/2026
Special inspection requirement — Electric vehicle service equipment requirements
Radomir Delic
06/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
Radomir Delic
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
06/11/2026
Special inspection requirement — Air barrier — testing
Radomir Delic
06/11/2026
Special inspection requirement — Fenestration air leakage
Radomir Delic
06/11/2026
Special inspection requirement — Ventilation and air distribution system
Radomir Delic
05/26/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S1
05/22/2026
Permit issued — Foundation
X00917240-S1-FO
05/21/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S6
05/21/2026
Permit issued — Construction Fence
X00917240-S6-FN
05/13/2026
Filed — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-P6
05/11/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S5
05/11/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S4
05/11/2026
Permit issued — Curb Cut
X00917240-S7-CC
05/08/2026
Permit issued — Solar
X01391081-I1-SL
05/07/2026
Filed — Alteration
Installation of PV solar on existing roof no change to egress or use of occupancy
X01391081-I1
05/06/2026
Signed off — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-S3
04/27/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/26/2026
Filed — New Building
NEW PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB #X00917240 AS PER PLANS.
X00917240-P5
12/03/2025
Permit issued — Sprinklers
X00917240-S5-EW-SP
11/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2025
Permit issued — Plumbing
X00917240-S4-PL
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBDB CONSTRUCTION ENTERPRI06/22/2026
DOB NOWFoundationSigned-offBDB CONSTRUCTION ENTERPRI05/22/2026
DOB NOWConstruction FenceSigned-offBDB CONSTRUCTION ENTERPRI05/21/2026
DOB NOWCurb CutSigned-offBDB CONSTRUCTION ENTERPRI05/11/2026
DOB NOWSolarSigned-offVOLTAIC SOLAIRE LLC05/08/2026
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/03/2025
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/15/2025
DOB NOWStructuralSigned-offSTRUCTURELINE INC08/19/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURELINE INC08/19/2025
1 project · most recent 08/12/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Signed-offBDB CONSTRUCTION ENTERPRIHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric MXZ-4D30NL 35,400 BTU · Condensing Unit ×3
Heating
Qmark 25126NW 1,706 BTU · Electric Heater ×1
1 project · most recent 08/12/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/12/2026Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
2 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedJD ELECTRICAL ENTERPRISESGeneral Wiring
04/19/2026CompleteBERGER QUALITY ELEC'L CON—
1 project · most recent 05/07/2026
FiledStatusContractorScope
05/07/2026Signed-offVOLTAIC SOLAIRE LLC10 panels, 4.4 kw, 2,950 roof_area_sqft
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
06/26/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
04/27/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
08/03/2026Electric vehicle service equipment requirementsRadomir Delicenergy_progress
08/03/2026Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
08/03/2026Protection of exposed foundation insulationRadomir Delicenergy_progress
08/03/2026MeteringRadomir Delicenergy_progress
08/03/2026Air barrier - visual inspectionRadomir Delicenergy_progress
08/03/2026Insulation placement and R valuesRadomir Delicenergy_progress
08/03/2026Ventilation and air distribution systemRadomir Delicenergy_progress
08/03/2026Permanent certificateRadomir Delicenergy_progress
08/03/2026Maintenance informationRadomir Delicenergy_progress
08/03/2026Fenestration air leakageRadomir Delicenergy_progress
08/03/2026Fenestration areasRadomir Delicenergy_progress
08/03/2026Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
08/03/2026Fire-Resistant Penetrations and JointsRadomir Delicspecial
08/03/2026Energy Code Compliance InspectionsRadomir Delicprogress
08/03/2026Interior lighting powerRadomir Delicenergy_progress
08/03/2026Duct leakage testing, insulation and designRadomir Delicenergy_progress
08/03/2026Air barrier — testing Radomir Delicenergy_progress
06/11/2026Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
06/11/2026Fire-Resistant Penetrations and JointsRadomir Delicspecial
06/11/2026Energy Code Compliance InspectionsRadomir Delicprogress
06/11/2026Interior lighting powerRadomir Delicenergy_progress
06/11/2026Duct leakage testing, insulation and designRadomir Delicenergy_progress
06/11/2026Air barrier — testing Radomir Delicenergy_progress
06/11/2026Fenestration areasRadomir Delicenergy_progress
06/11/2026Permanent certificateRadomir Delicenergy_progress
Latest 25 of 93.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/19/2026X00917240-P5Request digital key ↗
08/19/2026X00917240-P3Request digital key ↗
08/19/2026X00917240-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026X00917240-P7Open ↗
08/19/2026X00917240-P6Open ↗
08/13/2026X00917240-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/19/2026X00917240-P7Open ↗
08/19/2026X00917240-P6Open ↗
08/13/2026X00917240-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00917240-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWSpecial Inspector Seal & Signature22
09/25/2026X00917240-P5Open ↗
09/25/2026X00917240-P5Open ↗
09/02/2026X00917240-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/25/2026X00917240-P5Open ↗
09/25/2026X00917240-P5Open ↗
09/02/2026X00917240-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/19/2026X00917240-P3Open ↗
08/19/2026X00917240-P2Open ↗
08/19/2026X00917240-P1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/09/2024240359492Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X00917240-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/19/2026X00917240-P7Open ↗
08/19/2026X00917240-P6Open ↗
08/13/2026X00917240-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00917240-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026X00917240-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00917240-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/26/2026X01391081-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/09/2024240359492Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/19/2026X00917240-P6Open ↗
08/19/2026X00917240-P7Open ↗
08/13/2026X00917240-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026X00917240-P6Open ↗
08/19/2026X00917240-P7Open ↗
08/13/2026X00917240-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026X00917240-I1Open ↗
08/19/2026X00917240-P7Open ↗
08/19/2026X00917240-P6Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/06/2024240359492Open ↗