← Back
BuildNYC
One story - permanent living quarter
3042 KINGSLAND AVENUE
BRONX · BIN 2062001
💬 Discuss this project
1901Year Built
1Stories
A2Building Class
R4-1Zoning
1,068 sfGross Floor Area
1Units
4 Active Violations ▸
One story - permanent living quarter · Owner of record: Kingsland 52 Assets · 2,375 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
Site & exterior6p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Banji Awosika Architect511/03/2026
Aminov Design Engineering110/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Banji Architect203/21/2026
A D Building Solutions203/21/2026
AC Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKY ConstructionGeneral Contractor104/09/2026
MKY ConstructionScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Banji Awosika Architect P2721204/16/2026
Building Lifecycle
11/03/2026
Filed — New Building
NEW CONSTRUCTION FENCE IN OPEN PREMISES
X01318631-S3
09/14/2026
At the time of inspection of a vacant in place with construction fence erected around, research of departments of buildings records i noticed no…
ECB violation · open
09/14/2026
At the time of inspection of a vacant lot in place, i observed a construction fence erected around the property line not maintained as per code…
ECB violation · open
05/29/2026
Closed: Remedy: repair fence approx.20' feet as follow: at exp#1 (kingsland avenue) approx. 15' feet and at exp#2 ( rear side) approx 5'ft
DOB violation · closed on the city's record
05/20/2026
Remedy: repair fence approx.20' feet as follow: at exp#1 (kingsland avenue) approx. 15' feet and at exp#2 ( rear side) approx 5'ft
DOB violation · closed
53 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMKY Construction10/30/2025
DOB NOWFull DemolitionSigned-offMKY Construction10/30/2025
1 project · most recent 11/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
11/03/2026——Heating and Air Conditioning Systems
1 project · most recent 11/03/2026
Sprinkler System
FiledStatusContractorScope
11/03/2026——Sprinkler System
1 project · most recent 11/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
11/03/2026——Storm, Water/Sanitary
1 project · most recent 11/03/2026
Steel Concrete Masonry
FiledStatusContractorScope
11/03/2026——Steel, Concrete, Masonry
2 projects · most recent 11/03/2026
Fence
FiledStatusContractorScope
11/03/2026——Fence
10/29/2025Signed-offMKY ConstructionFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
03/17/2026Fire-Resistant Penetrations and JointsOLABANJI AWOSIKAspecial
03/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationOLABANJI AWOSIKAspecial
03/17/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesOLABANJI AWOSIKAspecial
03/17/2026Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
03/17/2026HVAC-R and service water heating system controlsOLABANJI AWOSIKAenergy_progress
03/17/2026HVAC-R and service water heating equipmentOLABANJI AWOSIKAenergy_progress
03/17/2026HVAC-R and service water piping design and insulationOLABANJI AWOSIKAenergy_progress
03/17/2026Maintenance informationOLABANJI AWOSIKAenergy_progress
03/17/2026MeteringOLABANJI AWOSIKAenergy_progress
03/17/2026Permanent certificateOLABANJI AWOSIKAenergy_progress
03/16/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/16/2026Excavations - Sheeting, Shoring, and BracingOLABANJI AWOSIKAspecial
03/16/2026Subgrade InspectionsOLABANJI AWOSIKAspecial
03/03/2026Sprinkler Systems—special
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account