Condo, commercial tower (mixed-use) [derived]
The 3 Dag Condominium
305 EAST 47TH STREET · BIN 1038906
💬 Discuss this project
1928Year Built
14Stories
RCBuilding Class
C1-9Zoning
132,057 sfGross Floor Area
29Units
LL97 Covered0 Active ViolationsFISP: SAFE
Condo, commercial tower (mixed-use) [derived] · 12,552 sf lot · 10.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstall split AC systems1p · 1 filing · 7 docs
Floor 8American University Beirut2p · 1 filing · 6 docs
Floor 7U.A.E Embassy2p · 1 filing · 2 docs
Floor 6Install split AC systems3p · 1 filing · 7 docs
Floor 5Install split AC systems3p · 1 filing · 7 docs
Floor 4
Floor 3Consulate of Kazakhstan3p · 1 filing · 2 docs
Floor 2
Floor 1Fifth Avenue Surgery Center Extension Clinic47p · 3 filings · 20 docs
CellarFifth Avenue Surgery Center Extension Clinic44p · 5 filings · 20 docs
Sub-CellarFifth Avenue Surgery Center Extension Clinic3p · 2 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stahl 3 Dag5203/21/2026
3 Dag Condominium2203/21/2026
SNP Realty1703/21/2026
Casey Equities1303/21/2026
Tower Plaza Associates903/21/2026
Thorne Lau Chin703/21/2026
277 Park Avenue703/21/2026
Above603/21/2026
Stahl York Avenue Co203/21/2026
Stahl Associates103/21/2026
Gva Williams103/21/2026
2 Dag Hammarskiold Condo103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Newtec Engineering108/20/2024
Me Engineering1001/27/2023
New York & Company101/05/2022
MSS Engineering111/10/2021
Nicholas Michnevitz, III108/05/2021
Murphy Burnham & Buttrick Architects103/15/2021
Baileys Engineering105/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants1603/21/2026
New York & Company203/21/2026
JMV Assosiates103/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Eastman Cooke & AssociateGeneral Contractor607/08/2026
Everest ScaffoldingScaffold403/21/2026
SKY Heights ConstructionGeneral Contractor303/21/2026
Advanced PlumbingPlumbing307/08/2026
Advanced PlumbingFire Protection307/08/2026
Call Electric CoElectrical203/21/2026
RPM ElectricElectrical103/21/2026
Laura Electrical LightingElectrical103/21/2026
Quinn & Feiner Service CoGeneral Contractor107/08/2026
Sea-Dar EnterprisesGeneral Contractor107/08/2026
Donnelly Mechanicalspecialty_contractor107/08/2026
E-J Electric Installation CoElectrical103/22/2026
Acg Electrical ContractorsElectrical103/21/2026
R.C.M. ElectricElectrical103/21/2026
Sidney Electrical Cont'gElectrical103/22/2026
K-10 ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Obaid Mian849108/20/2024
Skyline Engineering267801/27/2023
New York Engineering Associates851101/05/2022
Building Lifecycle
All (144)Filed (17)Permit Issued (17)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (8)Objection (6)Special Inspection (13)
06/16/2026
Permit issued — Suspended Scaffold
M01412130-I1-SC
06/04/2026
Filed — Alteration
Installation of suspended scaffold to perform facade inspections
M01412130-I1
10/17/2024
Signed off — Alteration
M01081409-I1
08/23/2024
Permit issued — Mechanical Systems
M01081409-I1-MS
08/20/2024
Filed — Alteration
M01081409-I1
02/28/2023
Signed off — Alteration
M00677674-I1
02/28/2023
Signed off — Alteration
Modification to existing Plumbing fixtures as per plans filed herewith. Modification to existing Sprinkler system as per plans filed herewith.
M00323442-I1
01/27/2023
Filed — Alteration
Modification to existing Plumbing fixtures as per plans filed herewith. Modification to existing Sprinkler system as per plans filed herewith.
M00323442-P3
01/27/2023
Special inspection requirement — Sprinkler Systems
Matthew Wavro
01/19/2023
Filed — Alteration
M00677674-P1
12/02/2022
Cycle 9 facade report submitted
12/02/2022
Cycle 9 facade report signed — SAFE
11/29/2022
Cycle 9 facade inspection completed
11/15/2022
Signed off — Alteration
M00677680-I1
11/10/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/06/2022
Signed off — Alteration
M00677345-I1
09/21/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2022
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
09/09/2022
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
09/09/2022
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
09/09/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/31/2022
Signed off — Alteration
INSTALL SPLIT AC SYSTEMS AS PER PLANS.
M00588424-I1
08/02/2022
Permit issued — Mechanical Systems
M00677345-I1-MS
07/26/2022
Signed off — Alteration
M00476273-I1
05/31/2022
Permit issued — Sprinklers
M00677680-I1-EW-SP
05/25/2022
Signed off — Alteration
REMOVAL AND INSTALLATION OF INTERIOR NONBEARING PARTITIONS AND OTHER ASSOCIATED DOORS, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00628327-I1
05/25/2022
Permit issued — Sprinklers
M00323442-I1-EW-SP
05/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2022
Permit issued — Plumbing
M00323442-I1-PL
04/27/2022
Permit issued — Plumbing
M00677674-I1-PL
03/29/2022
Filed — Alteration
M00677345-I1
03/25/2022
Filed — Alteration
M00677674-I1
03/25/2022
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M00323385-I1
03/23/2022
Filed — Alteration
M00677680-I1
02/09/2022
Special inspection requirement — Mechanical Systems
Matthew Wavro
02/09/2022
Special inspection requirement — Final
Matthew Wavro
01/05/2022
Filed — Alteration
INSTALL SPLIT AC SYSTEMS AS PER PLANS.
M00588424-I1
01/05/2022
Permit issued — Mechanical Systems
M00588424-I1-MS
11/15/2021
Permit issued — General Construction
M00628327-I1-GC
11/11/2021
Signed off — Alteration
M00537359-I1
11/10/2021
Filed — Alteration
REMOVAL AND INSTALLATION OF INTERIOR NONBEARING PARTITIONS AND OTHER ASSOCIATED DOORS, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00628327-I1
11/10/2021
Special inspection requirement — Final
SHARIF MOHAMMAD
10/13/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Permit issued — General Construction
M00537359-I1-GC
09/09/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
09/03/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/03/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
09/03/2021
Special inspection requirement — Final
LOUIS ARENA
09/03/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/03/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
09/03/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/05/2021
Filed — Alteration
M00537359-I1
06/10/2021
Permit issued — General Construction
M00476273-I1-GC
06/02/2021
Objection resolved — Addressed
05/20/2021
Permit issued — Mechanical Systems
M00323385-I1-MS
05/18/2021
Objection raised — Other
05/13/2021
Filed — Alteration
Modification to existing Plumbing fixtures as per plans filed herewith. Modification to existing Sprinkler system as per plans filed herewith.
M00323442-P2
05/03/2021
Special inspection requirement — Sprinkler Systems
Matthew Wavro
04/16/2021
Permit issued — Sprinklers
M00323442-I1-PL
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedJC Contracting Management06/16/2026
DOB NOWMechanical SystemsSigned-offDonnelly Mechanical08/23/2024
DOB NOWMechanical SystemsSigned-offEastman Cooke & Associate08/02/2022
DOB NOWSprinklersSigned-offAdvanced Plumbing05/31/2022
DOB NOWSprinklersSigned-offAdvanced Plumbing05/25/2022
DOB NOWPlumbingSigned-offAdvanced Plumbing05/03/2022
DOB NOWPlumbingSigned-offAdvanced Plumbing04/27/2022
DOB NOWMechanical SystemsSigned-offQuinn & Feiner Service Co01/05/2022
DOB NOWGeneral ConstructionSigned-offSKY Heights Construction11/15/2021
DOB NOWGeneral ConstructionSigned-offEastman Cooke & Associate09/28/2021
DOB NOWGeneral ConstructionSigned-offSea-Dar Enterprises06/10/2021
DOB NOWMechanical SystemsSigned-offEastman Cooke & Associate05/20/2021
DOB NOWPlumbingSigned-offAdvanced Plumbing04/16/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing04/16/2021
DOB NOWMechanical SystemsSigned-offEastman Cooke & Associate03/15/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/26/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding05/18/2018
BISPLISSUEDArch Plumbing & Heating01/20/2023
BISOTISSUEDEastman Cooke & Associate04/21/2022
BISOTISSUEDEastman Cooke & Associate08/12/2021
BISOTISSUEDEastman Cooke & Associate02/17/2021
BISPLISSUEDAce-Atlas Plbing & Heating10/11/2018
BISOTISSUEDJC Contracting Management09/28/2018
BISPLISSUEDMichael Gangi P&H Contracting07/26/2018
BISOTISSUEDJC Contracting Management06/06/2018
BISEQISSUEDEverest Scaffolding04/19/2018
BISPLISSUEDMichael Gangi P&H Contracting03/23/2018
BISOTISSUEDConstructomics01/10/2018
BISPLISSUEDAqua Plumbing & Heating10/18/2017
BISEQISSUEDE&M Maintenance10/03/2017
BISMHISSUEDConstructomics09/26/2017
BISOTISSUEDE&M Maintenance09/13/2017
BISOTISSUEDSimply Elegant General Co08/04/2017
BISPLISSUEDMPC Plumbing & Heating07/26/2017
BISOTISSUEDSimply Elegant General Co07/19/2017
BISMHISSUEDPSI Construction06/09/2017
BISSPISSUEDFull Capacity Fire04/10/2017
BISPLISSUEDPlumbing NYC03/27/2017
BISPLISSUEDEnobrac Plumbing11/28/2016
BISSPISSUEDEnobrac Plumbing11/28/2016
+ 27 more permits on file
7 projects · most recent 04/28/2022
General Wiring
FiledStatusContractorScope
04/28/2022CompleteA.S.H. ElectricGeneral Wiring
11/11/2021CompleteJim ElectricGeneral Wiring
03/25/2021CompleteApollo Electric InsdusGeneral Wiring
04/28/2020CompleteE-J Electric Installation CoGeneral Wiring
05/20/2019CompleteSidney Electrical Cont'gGeneral Wiring
02/12/2019CompleteSidney Electrical Cont'gGeneral Wiring
05/02/2018CompleteBorowide Elect'l Contractors—
1 project · most recent 06/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/04/2026Permit IssuedJC Contracting ManagementSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/21/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/13/2022Certified Medical Gas - MG - PL - FinishCertifiedView ↗
09/09/2022Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
09/09/2022Certified Medical Gas - MG - PL - TestCertifiedView ↗
09/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
01/27/2023Sprinkler SystemsMatthew Wavrospecial
02/09/2022Mechanical SystemsMatthew Wavrospecial
02/09/2022FinalMatthew Wavroprogress
11/10/2021FinalSHARIF MOHAMMADprogress
09/09/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
09/03/2021HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/03/2021Mechanical SystemsLOUIS ARENAspecial
09/03/2021FinalLOUIS ARENAprogress
09/03/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/03/2021Maintenance informationLOUIS ARENAenergy_progress
09/03/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
05/03/2021Sprinkler SystemsMatthew Wavrospecial
02/25/2021FinalJeffrey Murphyprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consulate of KazakhstanGovernment / CivicFloor 3
Project M01081409 Alteration · LOC Issued · 08/20/2024
Fifth Avenue Surgery Center Extension ClinicMedical / HealthcareCellar, Floor 1
Project M00677345 Alteration · LOC Issued · 03/29/2022
Project M00677674 Alteration · LOC Issued · 03/25/2022
Project M00677680 Alteration · LOC Issued · 03/23/2022
Project M00537359 Alteration · LOC Issued · 08/05/2021
Project M00323442 Alteration · LOC Issued · 03/16/2020
Project M00323385 Alteration · LOC Issued · 03/13/2020
U.A.E EmbassyGovernment / CivicFloor 7
Project M00628327 Alteration · LOC Issued · 11/10/2021
American University BeirutEducationFloor 8
Project M00476273 Alteration · LOC Issued · 03/15/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 739 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch10
09/06/2026M00039810-I1Request digital key ↗
09/03/2026M00537359-I1Request digital key ↗
09/03/2026M00628327-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/03/2026M00323442-I1Request digital key ↗
09/03/2026M00323442-P3Request digital key ↗
08/15/2026M00323442-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/03/2026M00323442-I1Request digital key ↗
09/03/2026M00323442-P1Request digital key ↗
09/03/2026M00323442-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00323385-I1Request digital key ↗
08/15/2026M00323385-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00476273-I1Request digital key ↗
▸Applications & Permits144
▸BISPLAN / WORK APPROVAL APPLICATION84
09/03/2024122135064Open ↗
12/13/2022121714591Open ↗
02/25/2022123867226Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION59
01/20/2023121714591Open ↗
02/17/2021123867226Open ↗
12/17/2019123743011Open ↗
Showing 3 of 59 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications153
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION97
03/09/2020123743011Open ↗
02/25/2020123867226Open ↗
02/25/2020123867226Open ↗
Showing 3 of 97 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/06/2026M00039810-I1Open ↗
09/05/2026M00323385-P1Open ↗
09/05/2026M00323385-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
03/16/2018123388146Open ↗
Showing 1 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/05/2018140809524Open ↗
04/17/2018140757964Open ↗
03/16/2018123388146Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00588424-I1Open ↗
09/01/2026M00588424-I1Open ↗
08/31/2026M00628327-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/05/2018140809524Open ↗
04/17/2018140757964Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/05/2018140809524Open ↗
04/17/2018140757964Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00588424-I1Open ↗
08/25/2026M00323442-P2Open ↗
08/24/2026M00323442-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment66
▸BISEQUIPMENT USE PERMITS21
06/03/2022121714591Open ↗
09/19/2018122376525Open ↗
09/19/2018122376525Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
02/19/2019140809524Open ↗
02/13/2019140809524Open ↗
02/06/2018122376525Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING11
10/05/2018140809524Open ↗
Showing 1 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
09/19/2018122376525Open ↗
09/19/2018122376525Open ↗
Showing 2 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
05/23/2019122528657Open ↗
11/29/2018122368865Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
06/03/2022121714591Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/03/2022121714591Open ↗
▸Safety & Tenant Protection7
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
10/05/2018140809524Open ↗
04/17/2018140757964Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos46
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
02/25/2020123867226Open ↗
11/29/2018122368865Open ↗
10/05/2018140809524Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/05/2026M00323385-I1Open ↗
09/03/2026M00323442-P1Open ↗
09/03/2026M00323442-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00476273-I1Open ↗
▸Energy Compliance57
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
03/09/2020123743011Open ↗
02/25/2020123867226Open ↗
12/09/2019123743011Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
03/09/2020123743011Open ↗
05/29/2019140809524Open ↗
12/03/2018122376534Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/05/2018140809524Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/31/2022123867226Open ↗
06/03/2022121714591Open ↗
▸BIS* HVAC INSULATION AND SEALING1
06/03/2022121714591Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00588424-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/01/2022123867226Open ↗
08/31/2022123867226Open ↗
09/08/2021140701159Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/03/2018122376534Open ↗
Showing 1 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/13/2019122376534Open ↗
▸BISMECHANICAL SYSTEMS1
06/03/2022121714591Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs64
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
06/21/2023123867226Open ↗
03/31/2023122528657Open ↗
03/23/2023121714591Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/20/2023121714591Open ↗
04/14/2020123867226Open ↗
04/01/2020123867226Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
01/20/2023121714591Open ↗
07/26/2018121714591Open ↗
Showing 2 of 4 on file for this type
▸BISFINAL1
06/03/2022121714591Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
05/29/2019140809524Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00476273-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00476273-I1Open ↗
▸Cost, Insurance & Ownership61
▸BISCOST AFFIDAVIT57
03/09/2020123743011Open ↗
02/25/2020123867226Open ↗
12/13/2019122376534Open ↗
Showing 3 of 57 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/16/2023122528657Open ↗
08/31/2022123867226Open ↗
06/03/2022121714591Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms88
▸BISADDITIONAL INFORMATION33
05/02/2022123867226Open ↗
03/21/2022123867226Open ↗
01/05/2021123867226Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET29
02/25/2020123867226Open ↗
11/19/2019123743011Open ↗
11/14/2019123743011Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM22
01/20/2023121714591Open ↗
03/09/2020123743011Open ↗
12/13/2019122376534Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/05/2018140809524Open ↗
04/17/2018140757964Open ↗
Showing 2 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
03/31/2023122528657Open ↗
05/29/2019140809524Open ↗
12/03/2018122376534Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
04/14/2022123867226Open ↗
03/21/2022123867226Open ↗
03/21/2022123867226Open ↗
▸BISCPC: HUDSON YARDS FINAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/16/2026M01412130-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01412130-I1Open ↗