← Back
Elevator apt, fireproof without stores
The 350 East 18th Street Condominium
305 FIRST AVENUE · BIN 1091805
💬 Discuss this project
2024Year Built
13Stories
D3Building Class
C1-8AZoning
69,408 sfGross Floor Area
54Units
Rent Stabilized0 Open Violations
Elevator apt, fireproof without stores · Owner of record: 305 FIRST AVE OWNER LLC · 7,360 sf lot · 9.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof8p · 6 filings · 20 docs
Bulkhead5p · 4 filings · 20 docs
Floor 136p · 5 filings · 20 docs
Floor 127p · 5 filings · 20 docs
Floor 118p · 5 filings · 20 docs
Floor 102p · 1 filing · 13 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 36p · 5 filings · 20 docs
Floor 27p · 7 filings · 20 docs
Floor 19p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
305 FIRST AVE OWNER5809/13/2026
ALBA SERVICES2207/08/2026
JAT CONSTRUCTION GROUP IN703/22/2026
ROSS ASSOCIATES303/22/2026
UGB CONSTRUCTION103/22/2026
AVESTA BUILDERS403/22/2026
TELEBEAM TELE CORP103/21/2026
CIM GROUP303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC2603/21/2026
GEIGER E A GROUP1403/21/2026
THE GREEN STUDIO303/21/2026
EUROCELT EXPEDITING, INC1603/21/2026
SELECT TYPE203/21/2026
KD DESIGNS403/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor4107/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor1207/08/2026
ALBA SERVICES INCGeneral Contractor1007/08/2026
ROSS & ASSOCIATES LLCGeneral Contractor907/08/2026
AVESTA BUILDERS INCGeneral Contractor807/08/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
CONSOLIDATED SCAFFOLD & BRIDGEGeneral Contractor307/08/2026
VAN VASSELLElectrical303/21/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
JAT CONSTRUCTION GROUP INGeneral Contractor207/08/2026
CM AND ASSOCIATES CONSTGeneral Contractor104/09/2026
STUART MOSKOWITZElectrical103/21/2026
RUDY WINKLERElectrical103/21/2026
CLIFTON WALDRONElectrical103/21/2026
LEVEL 10 CONSTRUCTION GR*General Contractor104/09/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
MOSKOWITZ STUARTElectrical103/21/2026
UGB CONSTRUCTION INCGeneral Contractor107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161511/10/2025
ENTHINK ENGINEERS LLC6247303/14/2024
Building Lifecycle
All (256)Filed (50)Permit Issued (59)Signed Off (26)Violation (16)Inspection (17)Objection (58)Special Inspection (30)
06/03/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH BUILDING DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00002794-I1
06/03/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00002572-I1
06/03/2026
Signed off — Alteration
M00002568-I1
06/03/2026
Signed off — Alteration
M00002800-I1
06/03/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH BUILDING DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00002801-I1
06/03/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00002564-I1
06/03/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH BUILDING DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
M00002571-I1
06/03/2026
Signed off — Alteration
M00002792-I1
01/09/2026
Signed off — Alteration
FILING MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION# 121209361.
M00503621-I1
01/09/2026
Signed off — Alteration
UNDERGROUND PLUMBING IN CONJUCTION WITH NEW BUILDING JOB NUMBER #121209361
M01085105-I1
01/09/2026
Signed off — Alteration
Install temporary standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB# 121209361.
M00504429-I1
01/08/2026
Signed off — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB# 121209361
M00503022-I1
12/29/2025
Violation issued (ECB, closed)
Unknown
12/29/2025
Violation issued (ECB, closed)
Construction
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/09/2025
Signed off — Alteration
PROPOSED CURB CUT IN CONJUNCTION WITH NB#121209361
M01234721-I1
12/09/2025
Violation issued (ECB, closed)
Unknown
12/08/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/02/2025
Signed off — Alteration
M00006975-I1
11/28/2025
Permit issued — Curb Cut
M01234721-I1-CC
11/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/28/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
11/26/2025
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING JOB # 121209361
M01066196-I1
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/26/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
FAHAD FATEH
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/26/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/26/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
11/26/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/26/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
11/26/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/26/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
11/26/2025
Special inspection requirement — Final
FAHAD FATEH
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/25/2025
Objection resolved — Addressed
11/21/2025
Signed off — Alteration
INSTALLATION OF FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01154151-I1
11/21/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01072033-I1
11/20/2025
Objection resolved — Addressed
11/20/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
11/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
11/18/2025
Objection raised — Scope
11/18/2025
Objection raised — Structural
11/17/2025
Filed — Alteration
UNDERGROUND PLUMBING IN CONJUCTION WITH NEW BUILDING JOB NUMBER #121209361
M01085105-P2
11/17/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/10/2025
Filed — Alteration
FILING MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION# 121209361.
M00503621-P2
11/10/2025
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# 121209361
M00502015-P3
11/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/05/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/05/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/05/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
FAHAD FATEH
10/29/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
10/23/2025
Filed — Alteration
Plumbing work as per plans filed. Filed in conjunction with NB# 121209361
M00503022-P4
Latest 60 of 256 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offAVESTA BUILDERS INC11/28/2025
DOB NOWConstruction FenceSigned-offROSS & ASSOCIATES LLC09/26/2025
DOB NOWSupported ScaffoldPermit IssuedMC SUPERSTRUCTURE INC07/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/30/2025
DOB NOWMechanical SystemsSigned-offJAT CONSTRUCTION GROUP IN07/09/2025
DOB NOWConstruction FenceSigned-offJAT CONSTRUCTION GROUP IN07/09/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC06/11/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/06/2025
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC12/23/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC12/04/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/04/2024
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC09/12/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC09/03/2024
DOB NOWSupported ScaffoldPermit IssuedMC SUPERSTRUCTURE INC08/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC08/28/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN08/05/2024
DOB NOWConstruction FenceSigned-offROSS & ASSOCIATES LLC07/12/2024
DOB NOWEarth WorkSigned-offROSS & ASSOCIATES LLC07/12/2024
DOB NOWMechanical SystemsSigned-offROSS & ASSOCIATES LLC07/12/2024
DOB NOWStructuralSigned-offROSS & ASSOCIATES LLC07/12/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/11/2024
DOB NOWSupport of ExcavationSigned-offROSS & ASSOCIATES LLC06/12/2024
DOB NOWFoundationSigned-offROSS & ASSOCIATES LLC06/12/2024
DOB NOWSupport of ExcavationSigned-offAVESTA BUILDERS INC03/14/2024
DOB NOWSupport of ExcavationSigned-offAVESTA BUILDERS INC02/14/2024
DOB NOWFoundationSigned-offAVESTA BUILDERS INC02/05/2024
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC12/12/2023
DOB NOWConstruction FenceSigned-offLEVEL 10 CONSTRUCTION06/27/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/31/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/10/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/09/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/09/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/09/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/01/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/28/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/05/2018
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/05/2018
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/05/2018
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/05/2018
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/05/2018
+ 32 more permits on file
1 project · most recent 11/10/2025
FiledStatusContractorScope
11/10/2025Signed-offPRIME PIPING & HEATING IN840 heads, 2 outlets
1 project · most recent 11/10/2025
FiledStatusContractorScope
11/10/2025———
7 projects · most recent 07/14/2026
General Wiring
FiledStatusContractorScope
07/14/2026CompletePOWER DIRECT ELECTRIC INC55 meters, 55 new_meters
01/20/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
03/06/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
10/07/2024CompletePOWER DIRECT ELECTRIC INC—
09/25/2024CompletePOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
09/05/2024CompleteNASH ELECTRIC SERVICES IN—
07/11/2024CompleteNASH ELECTRIC SERVICES IN—
5 projects · most recent 06/09/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/09/2025Permit IssuedMC SUPERSTRUCTURE INCScaffold
11/21/2017Signed-offCONSOLIDATED SCAFFOLDINGScaffold
11/16/2017Signed-offCONSOLIDATED SCAFFOLDINGSidewalk Shed
11/16/2017Signed-offCONSOLIDATED SCAFFOLDINGSidewalk Shed
11/16/2017Signed-offCONSOLIDATED SCAFFOLDINGSidewalk Shed
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/28/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2025Pass-Final PL - UndergroundPassView ↗
10/29/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
06/12/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/10/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/08/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/02/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/14/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/14/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/28/2024Pass-Final PL - UndergroundPassView ↗
01/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
11/26/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/26/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
11/26/2025Mechanical SystemsFAHAD FATEHspecial
11/26/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/26/2025Heating SystemsFAHAD FATEHspecial
11/26/2025Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsFAHAD FATEHspecial
11/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/26/2025FinalFAHAD FATEHprogress
11/26/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/26/2025Maintenance informationFAHAD FATEHenergy_progress
11/26/2025Permanent certificateFAHAD FATEHenergy_progress
11/26/2025Shutoff dampersFAHAD FATEHenergy_progress
11/26/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
11/19/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/05/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/05/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/05/2025Post-installed AnchorsFAHAD FATEHspecial
11/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
11/05/2025Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsFAHAD FATEHspecial
11/05/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/05/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/05/2025Maintenance informationFAHAD FATEHenergy_progress
11/05/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/09/2025Standpipe SystemsFAHAD FATEHspecial
Latest 25 of 107.
▾Documents — 367 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch51
09/06/2026M00002571-I1Request digital key ↗
09/06/2026M00002564-I1Request digital key ↗
09/06/2026M00002572-I1Request digital key ↗
Showing 3 of 51 on file for this type
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION52
02/18/2026121209361Open ↗
02/02/2026121209361Open ↗
12/29/2025141027289Open ↗
Showing 3 of 52 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
11/27/2025123907460Open ↗
11/27/2025123907460Open ↗
11/27/2025123907460Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
01/08/2026141027289Open ↗
11/05/2025141027289Open ↗
07/30/2025141027289Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
09/19/2025121209361Open ↗
07/09/2025121209361Open ↗
10/15/2024121209361Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records11
▸BISZONING EXHIBIT I: CERTIFICATION3
11/27/2025123907460Open ↗
11/06/2025123907460Open ↗
10/21/2021121209361Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
11/27/2025123907460Open ↗
10/21/2021121209361Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
11/27/2025123907460Open ↗
10/21/2021121209361Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/21/2021121209361Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/27/2025123907460Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/06/2026121209361Open ↗
▸BISZONING DIAGRAM1
10/21/2021121209361Open ↗
▸Seals & Professional Certifications100
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/06/2026M00002572-I1Open ↗
09/06/2026M00002568-I1Open ↗
09/06/2026M00002801-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026M00481243-P1Open ↗
09/01/2026M00481243-P2Open ↗
09/01/2026M00481243-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026M00481243-P1Open ↗
09/23/2026M00481243-P1Open ↗
09/01/2026M00481243-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/10/2018123466212Open ↗
09/10/2018123466212Open ↗
09/10/2018123466212Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/14/2025141027289Open ↗
08/03/2021141004213Open ↗
10/02/2018140803272Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
01/06/2026121209361Open ↗
10/21/2021121209361Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/06/2026121209361Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/06/2026121209361Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/10/2018123466212Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
10/21/2021121209361Open ↗
▸BISPROVIDE THE SMOKE DETECTOR/CARBON MONOXIDE.1
02/20/2026121209361Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
06/17/2021121209361Open ↗
03/03/2021121209361Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/10/2024121209361Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/12/2025141027289Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
02/18/2026121209361Open ↗
01/30/2026121209361Open ↗
01/30/2026121209361Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/10/2018123466212Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00503621-I1Open ↗
08/13/2026M00503022-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/06/2026121209361Open ↗
▸BISINTERIOR LIGHTING POWER1
01/06/2026121209361Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/06/2026121209361Open ↗
▸BISFENESTRATION AREAS1
01/06/2026121209361Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/06/2026121209361Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/06/2026121209361Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/06/2026121209361Open ↗
▸BISELECTRIC MOTORS1
01/06/2026121209361Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/14/2025140687264Open ↗
07/14/2025140687264Open ↗
06/18/2024121209361Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
01/06/2026121209361Open ↗
10/10/2024121209361Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026M00481243-P2Open ↗
08/13/2026M00481243-I1Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/10/2024121209361Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/06/2026121209361Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/06/2026121209361Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/26/2024140687264Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
01/06/2026121209361Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00481243-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026M00481243-I1Open ↗
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE14
11/07/2025121209361Open ↗
03/25/2025121209361Open ↗
03/06/2025121209361Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/27/2025123907460Open ↗
11/27/2025123907460Open ↗
11/27/2025123907460Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/14/2025140687264Open ↗
03/18/2025104359329Open ↗
03/18/2025101253983Open ↗
▸BISFINAL1
11/26/2024140687264Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/09/2025121209361Open ↗
10/10/2024121209361Open ↗
▸BISSUBMIT AN AFFIDAVIT FROM THE APPLICANTATTESTING THAT THE UNSAFE SITE CONDITIONVIOLATION IS ADDRESSED, MAKING THE SITE SAFE. PROVIDE PROGRESS REPORT FORTCO.1
02/20/2026121209361Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET6
11/06/2025123907460Open ↗
09/10/2018123466212Open ↗
09/10/2018123466212Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
01/07/2026141027289Open ↗
11/05/2025141027289Open ↗
10/10/2024121209361Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/30/2025141027289Open ↗
08/03/2021141004213Open ↗
10/02/2018140803272Open ↗
Showing 3 of 4 on file for this type
▸Other Documents17
▸BISPLOT DIAGRAM5
11/27/2025123907460Open ↗
11/06/2025123907460Open ↗
06/17/2021121209361Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT2
08/12/2025141027289Open ↗
08/25/2021141004213Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00486578-I1Open ↗
08/13/2026M00481243-S2Open ↗
▸BISSHUTOFF DAMPERS1
01/06/2026121209361Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/20/2026121209361Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/02/2024141004213Open ↗
▸BISVESTIBULES1
02/02/2026121209361Open ↗
▸BISMAINTENANCE INFORMATION1
01/06/2026121209361Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/06/2026121209361Open ↗
▸BISTCO - Supporting Documents1
11/06/2025123907460Open ↗
▸BISPRIOR TO TCO REVIEW SUBMIT THE TCO WORKSHEET.1
02/20/2026121209361Open ↗