← Back
Walk-up apt, over six families with stores
305 FLATBUSH AVENUE
BROOKLYN · BIN 3337835
💬 Discuss this project
1931Year Built
3Stories
C7Building Class
R7AZoning
5,541 sfGross Floor Area
13Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 111 REALTY LLC · 2,140 sf lot · 2.59 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 12p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FLOSAR REALTY1607/08/2026
DETROIT PIZZA VENTURES LLC DBA JET3007/08/2026
111 REALTY1103/22/2026
111 REATLY ASSOCIATES103/22/2026
HPD203/21/2026
SICHERMAN MANAGEMENT503/21/2026
CITY OF N Y C OSICHERMAN MNGT203/21/2026
CITY OF NY C O SICH MAGT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES304/24/2023
SY ENGINEERING PLLC404/21/2023
PROSPECT ENGINEERING P.C203/20/2023
ASDA ARCHITECTURE + DESIGN312/14/2022
JONG HAE CHANG ARCHITECT107/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
JONG HAE CHANG ARCHITECT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDS DESIGN AND CONSULTINGGeneral Contractor1203/21/2026
PSP NY CONSTRUCTION, INCGeneral Contractor303/21/2026
SERVICE SIGN ERECTORSScaffold307/08/2026
UNITECH DESIGN INCGeneral Contractor203/21/2026
POWER PLUMBING & HEATINGPlumbing107/08/2026
UNITECH DESIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOTIR ASSOCIATES7473204/24/2023
SY ENGINEERING PLLC5149404/21/2023
PROSPECT ENGINEERING P.C.2775103/20/2023
JONG HAE CHANG ARCHITECT6169107/27/2022
Building Lifecycle
All (77)Filed (13)Permit Issued (11)Signed Off (5)Violation (10)Inspection (8)Special Inspection (30)
06/24/2024
Signed off — Alteration
INTERIOR RENOVATION FOR A 1ST FLOOR MEDICAL OFFICE. PLUMBING WORK FILED UNDER APP #B00820821
B00820795-I1
06/02/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL TENANT SPACE. PLUMBING WORK INCLUDES THE INSTALLATION OF A NEW GAS METER, GAS COOKING EQUIPMENT, AND PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00777090-I1
06/01/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2023
Filed — Alteration
FILING TO OBTAIN EQ. PERMIT FOR (1) EXISTING OUTDOOR SPLIT SYSTEM HEAT PUMP CONDENSER
B00863570-I1
04/23/2023
Special inspection requirement — Maintenance information
SUNGBOM YI
04/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
04/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
04/23/2023
Special inspection requirement — Shutoff dampers
SUNGBOM YI
04/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
04/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
04/23/2023
Special inspection requirement — Mechanical Systems
SUNGBOM YI
04/23/2023
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
04/23/2023
Special inspection requirement — Final
SUNGBOM YI
04/21/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL TENANT SPACE. PLUMBING WORK INCLUDES THE INSTALLATION OF A NEW GAS METER, GAS COOKING EQUIPMENT, AND PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00777090-P2
04/21/2023
Special inspection requirement — Mechanical Systems
Hany Demetry
04/21/2023
Special inspection requirement — Final
Hany Demetry
04/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
04/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
04/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
04/16/2023
Special inspection requirement — Shutoff dampers
SUNGBOM YI
04/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
04/16/2023
Special inspection requirement — Maintenance information
SUNGBOM YI
04/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
04/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
04/16/2023
Special inspection requirement — Mechanical Systems
SUNGBOM YI
04/16/2023
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
04/16/2023
Special inspection requirement — Final
SUNGBOM YI
04/06/2023
Signed off — Alteration
B00843927-I1
04/06/2023
Signed off — Alteration
B00843955-I1
04/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/06/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
03/31/2023
Permit issued — Sign
B00843927-I1-SG
03/31/2023
Permit issued — General Construction
B00843955-I1-GC
03/20/2023
Filed — Alteration
B00843927-I1
03/20/2023
Filed — Alteration
B00843955-I1
03/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
JUSTIN KIM
03/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUSTIN KIM
03/15/2023
Special inspection requirement — Energy Code Compliance Inspections
JUSTIN KIM
03/14/2023
Special inspection requirement — Final
JUSTIN KIM
03/14/2023
Special inspection requirement — Final
JUSTIN KIM
02/28/2023
Filed — Alteration
B00836167-I1
02/17/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL TENANT SPACE. WORK INCLUDES NEW PARTITIONS, FINISHES, KITCHEN EQUIPMENT, CEILING, AND LIGHT FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00775815-I1
02/16/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/08/2023
Permit issued — General Construction
B00820795-I1-GC
01/31/2023
Filed — Alteration
INTERIOR RENOVATION FOR A 1ST FLOOR MEDICAL OFFICE. PLUMBING WORK FILED UNDER APP #B00820821
B00820795-I1
01/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2022
Permit issued — Sign
B08050778-I1-SG
12/16/2022
Permit issued — Sign
B08050780-I1-SG
12/16/2022
Permit issued — Sign
B08050779-I1-SG
12/14/2022
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B08050779-I1
12/14/2022
Filed — Alteration
B08050778-I1
12/14/2022
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B08050780-I1
12/09/2022
Special inspection requirement — Final
Alfonso DElia
12/09/2022
Special inspection requirement — Final
Alfonso DElia
10/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
10/19/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL TENANT SPACE. PLUMBING WORK INCLUDES THE INSTALLATION OF A NEW GAS METER, GAS COOKING EQUIPMENT, AND PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00777090-P1
09/27/2022
Permit issued — Mechanical Systems
B00777090-I1-MS
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offUNITECH DESIGN INC03/31/2023
DOB NOWGeneral ConstructionSigned-offUNITECH DESIGN INC03/31/2023
DOB NOWGeneral ConstructionSigned-offPSP NY CONSTRUCTION, INC02/08/2023
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO12/16/2022
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO12/16/2022
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO12/16/2022
DOB NOWMechanical SystemsSigned-offCDS DESIGN AND CONSULTING09/27/2022
DOB NOWGeneral ConstructionSigned-offCDS DESIGN AND CONSULTING09/26/2022
DOB NOWPlumbingSigned-offPOWER PLUMBING & HEATING09/16/2022
DOB NOWMechanical SystemsSigned-offCDS DESIGN AND CONSULTING09/09/2022
DOB NOWGeneral ConstructionSigned-offCDS DESIGN AND CONSULTING09/09/2022
BISPLISSUEDNEW YORK STANDARD MECH CORP03/18/2009
BISOTISSUEDJBR CARPENTRY INC03/13/2009
BISEQISSUEDA-1 PREMIER SCAFFOLDING11/24/2008
BISOTISSUEDNEW YORK SIGN CITY INC.11/26/2004
BISBLISSUEDDYNAMIC MECH & PIP CONTR01/03/1992
BISPLISSUEDDYNAMIC MECH & PIP CONTR01/03/1992
BISPLISSUEDDYNAMIC MECHANICAL &PIPING CONTR03/05/1991
BISOTISSUEDM.G. HOME IMPROVEMENT03/05/1991
BISPLISSUEDDYNAMIC MECHANICAL & PIPING CONT02/21/1991
BISOTISSUEDM.G. HOME IMPROVEMENT02/21/1991
1 project · most recent 04/24/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/24/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-KA36NA2 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 04/21/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/21/2023Signed-offPOWER PLUMBING & HEATINGGas, Water/Sanitary
2 projects · most recent 03/23/2023
General Wiring Lighting
FiledStatusContractorScope
03/23/2023CompleteATMOS ELECTRIC SVCE CORP—
02/16/2023Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/06/2023Pass-Final Sign Permit InspectionPassView ↗
02/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
01/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
04/23/2023Maintenance informationSUNGBOM YIenergy_progress
04/23/2023HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
04/23/2023HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
04/23/2023Shutoff dampersSUNGBOM YIenergy_progress
04/23/2023HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
04/23/2023Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
04/23/2023Mechanical SystemsSUNGBOM YIspecial
04/23/2023Energy Code Compliance InspectionsSUNGBOM YIprogress
04/23/2023FinalSUNGBOM YIprogress
04/21/2023Mechanical SystemsHany Demetryspecial
04/21/2023FinalHany Demetryprogress
04/21/2023Energy Code Compliance InspectionsHany Demetryprogress
04/21/2023Tenant Protection Plan ComplianceHany Demetryspecial
04/16/2023HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
04/16/2023Shutoff dampersSUNGBOM YIenergy_progress
04/16/2023HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
04/16/2023Maintenance informationSUNGBOM YIenergy_progress
04/16/2023HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
04/16/2023Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
04/16/2023Mechanical SystemsSUNGBOM YIspecial
04/16/2023Energy Code Compliance InspectionsSUNGBOM YIprogress
04/16/2023FinalSUNGBOM YIprogress
03/15/2023Tenant Protection Plan ComplianceJUSTIN KIMspecial
03/15/2023Structural Stability – Alterations of existing buildingsJUSTIN KIMspecial
03/15/2023Energy Code Compliance InspectionsJUSTIN KIMprogress
Latest 25 of 35.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/28/2026B00777090-S1Request digital key ↗
08/28/2026B00777090-P2Request digital key ↗
08/28/2026B00777090-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
10/23/2009310302393Open ↗
09/02/2009310302393Open ↗
07/22/2009310302393Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
03/13/2009310302393Open ↗
11/24/2008310233271Open ↗
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature23
08/30/2026B08050780-I1Open ↗
08/28/2026B00775815-I1Open ↗
08/28/2026B00775815-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B00777090-I1Open ↗
08/28/2026B00777090-S1Open ↗
08/28/2026B08050779-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026B00777090-P1Open ↗
08/28/2026B00775815-I1Open ↗
08/27/2026B00777090-S1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/24/2008310233271Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/26/2009310302393Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/24/2008310233271Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING4
09/02/2009310302393Open ↗
07/22/2009310302393Open ↗
05/27/2009310302393Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00777090-I1Open ↗
08/28/2026B00777090-S1Open ↗
08/27/2026B00843927-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/24/2008310233271Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/26/2009310302393Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00777090-I1Open ↗
08/13/2026B00775815-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
02/26/2009310302393Open ↗
11/24/2008310233271Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
10/23/2009310302393Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/26/2009310302393Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
02/26/2009310302393Open ↗
11/24/2008310233271Open ↗