← Back
BuildNYC
Over six families without stores
305 WEST 126TH STREET
MANHATTAN · BIN 1059338
💬 Discuss this project
1910Year Built
5Stories
C1Building Class
R7-2Zoning
9,175 sfGross Floor Area
10Units
Rent Stabilized3 Active Violations ▸
Over six families without stores · Owner of record: Restoring Communities Housing Developmen T Fund · 2,448 sf lot · 3.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing and domestic water system renovation72p · 4 filings · 20 docs
BulkheadSprinkler system installation and fire booster pump3p · 1 filing · 6 docs
Floor 5Plumbing and domestic water system renovation73p · 4 filings · 20 docs
Floor 4Plumbing and domestic water system renovation70p · 4 filings · 20 docs
Floor 3Plumbing and domestic water system renovation69p · 4 filings · 20 docs
Floor 2Plumbing and domestic water system renovation69p · 4 filings · 20 docs
Floor 1Plumbing and domestic water system renovation79p · 5 filings · 20 docs
CellarPlumbing and domestic water system renovation76p · 4 filings · 20 docs
Site & exteriorPlumbing and domestic water system renovation26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development2507/08/2026
Restoring Communities HDFC1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Applied HVAC Engineering812/11/2025
Ocv Architects308/08/2025
Asr Engineering504/04/2025
James Sullivan JR109/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting503/21/2026
VCD203/21/2026
Ocv Architects903/21/2026
BMB Building Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic Electrical EvolutionsElectrical1003/21/2026
Avante ContractingGeneral Contractor707/08/2026
Katan P & HPlumbing407/08/2026
ZKW EnterprisesScaffold107/08/2026
Aujla ElectricElectrical103/22/2026
Mo ContractingFire Protection107/08/2026
Avante ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting16881012/11/2025
Building Lifecycle
All (116)Filed (17)Permit Issued (13)Signed Off (6)Violation (21)Inspection (5)Objection (24)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
A
01/12/2026
Signed off — Alteration
INSTALLATION OF THRU THE WALL HIGH EFFICIENCY HEAT PUMPS FOR HEATING & COOLING. TOILET AND KITCHEN EXHAUST SYSTEMS, MECHANICAL VENTILATION FOR COMMON AREAS VIA COOLING ONLY ROOF TOP UNIT WITH ENERGY RECOVERY SECTION.
M00667575-I1
01/12/2026
Signed off — Alteration
RENOVATION OF ENTIRE PLUMBING SYSTEM, REMOVAL OF GAS BOILER IN CELLAR, REPLACEMENT OF EXISTING SANITARY, VENT, STORM, COLD AND HOT WATER SYSTEMS UP TO EXISTING MAIN 6" COMBINED SEWER/STORM MAIN TO EXISTING CITY MAIN.
M00667589-I1
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
12/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
12/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
12/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/26/2025
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/11/2025
Filed — Alteration
RENOVATION OF ENTIRE PLUMBING SYSTEM, REMOVAL OF GAS BOILER IN CELLAR, REPLACEMENT OF EXISTING SANITARY, VENT, STORM, COLD AND HOT WATER SYSTEMS UP TO EXISTING MAIN 6" COMBINED SEWER/STORM MAIN TO EXISTING CITY MAIN.
M00667589-P5
12/04/2025
Permit issued — Plumbing
M00667589-I1-PL
12/03/2025
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, REPLACEMENT OF WINDOWS AND DOORS, AND REPLACEMENT OF KITCHEN AND BATHROOM FIXTURES. MINOR MASONRY REPAIR AND MINOR FACADE WORK. RELATED APPLICATIONS: M00667575, M00667589, M00841604.
M00627753-I1
10/10/2025
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM FOR THE ENTIRE BUILDING. PROVISION OF NEW COMBINED FIRE AND DOMESTIC WATER SYSTEM.
M00841604-I1
10/02/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
09/24/2025
Filed — Alteration
RENOVATION OF ENTIRE PLUMBING SYSTEM, REMOVAL OF GAS BOILER IN CELLAR, REPLACEMENT OF EXISTING SANITARY, VENT, STORM, COLD AND HOT WATER SYSTEMS UP TO EXISTING MAIN 6" COMBINED SEWER/STORM MAIN TO EXISTING CITY MAIN.
M00667589-P4
09/23/2025
Objection raised — Fire_Protection
09/23/2025
Objection raised — Fire_Protection
09/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
09/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
09/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
09/15/2025
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Filed — Alteration
INSTALLATION OF THRU THE WALL HIGH EFFICIENCY HEAT PUMPS FOR HEATING & COOLING. TOILET AND KITCHEN EXHAUST SYSTEMS, MECHANICAL VENTILATION FOR COMMON AREAS VIA COOLING ONLY ROOF TOP UNIT WITH ENERGY RECOVERY SECTION.
M00667575-P1
09/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Interior lighting power
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Lighting controls
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Air barrier - visual inspection
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2025
Special inspection requirement — Fenestration areas
SEBASTIAN SETTEDUCATE JR., P.E
08/20/2025
Objection resolved — Addressed
08/19/2025
Signed off — Alteration
M01095993-I1
08/19/2025
Objection raised — Cost
08/13/2025
Filed — Alteration
RENOVATION OF ENTIRE PLUMBING SYSTEM, REMOVAL OF GAS BOILER IN CELLAR, REPLACEMENT OF EXISTING SANITARY, VENT, STORM, COLD AND HOT WATER SYSTEMS UP TO EXISTING MAIN 6" COMBINED SEWER/STORM MAIN TO EXISTING CITY MAIN.
M00667589-P3
08/08/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, REPLACEMENT OF WINDOWS AND DOORS, AND REPLACEMENT OF KITCHEN AND BATHROOM FIXTURES. MINOR MASONRY REPAIR AND MINOR FACADE WORK. RELATED APPLICATIONS: M00667575, M00667589, M00841604.
M00627753-P2
08/07/2025
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM FOR THE ENTIRE BUILDING. PROVISION OF NEW COMBINED FIRE AND DOMESTIC WATER SYSTEM.
M00841604-P1
07/31/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01095902-I1
07/15/2025
Permit issued — Mechanical Systems
M00667575-I1-MS
07/14/2025
Permit issued — General Construction
M00627753-I1-GC
06/04/2025
Violation issued (HPD, closed)
A
04/04/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01095902-P4
04/02/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01095902-P3
04/01/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01095902-P2
01/15/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01095902-P1
01/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKatan P & H12/04/2025
DOB NOWMechanical SystemsSigned-offAvante Contracting07/15/2025
DOB NOWGeneral ConstructionSigned-offAvante Contracting07/14/2025
DOB NOWPlumbingSigned-offKatan P & H11/15/2024
DOB NOWConstruction FenceSigned-offAvante Contracting11/08/2024
DOB NOWSprinklersSigned-offMo Contracting11/07/2024
DOB NOWGeneral ConstructionSigned-offAvante Contracting10/10/2024
DOB NOWMechanical SystemsSigned-offAvante Contracting10/10/2024
DOB NOWSidewalk ShedSigned-offZKW Enterprises08/15/2024
DOB NOWSprinklersSigned-offKatan P & H08/14/2024
DOB NOWPlumbingSigned-offKatan P & H08/13/2024
DOB NOWGeneral ConstructionSigned-offAvante Contracting04/12/2024
DOB NOWMechanical SystemsSigned-offAvante Contracting04/12/2024
BIS—ISSUEDAvante Contracting10/03/2025
BISOTISSUEDPatti Construction07/02/2003
BISEQISSUEDHI Tech Bridging07/30/2002
BISOTISSUEDNa Dhillon Gen Construction08/05/1999
BISOTISSUEDRaja Z I Construction10/11/1996
5 projects · most recent 02/20/2026
General Wiring
FiledStatusContractorScope
02/20/2026CompleteDynamic Electrical EvolutGeneral Wiring
02/05/2026CompleteDynamic Electrical EvolutGeneral Wiring
11/14/2025CompleteNew Century Electrical ContractingGeneral Wiring
08/16/2024CompleteRichard Neu—
11/08/2020CompleteAujla ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
12/26/2025Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/26/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
12/26/2025HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/26/2025HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/26/2025HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/26/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
12/03/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
12/03/2025HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2025Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2025HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2025HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2025HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
09/15/2025HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
09/15/2025HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
09/15/2025Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
09/15/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/03/2025Exterior Insulation and Finish Systems (EIFS)SEBASTIAN SETTEDUCATE JR., P.Especial
09/03/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/03/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
09/03/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/03/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/03/2025Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/03/2025Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 81.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00627753-I1Request digital key ↗
09/03/2026M00627753-P2Request digital key ↗
08/26/2026M01095902-P4Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
01/20/2026140961939Open ↗
11/10/2025121253865Open ↗
09/30/2025121253865Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
10/03/2025121253865Open ↗
11/18/2010120525734Open ↗
08/17/2009120132668Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/22/2025121253865Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026M00627753-P2Open ↗
09/03/2026M00627753-I1Open ↗
09/03/2026M00627753-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/27/2026M00627753-I1Open ↗
09/27/2026M00627753-I1Open ↗
08/28/2026M00667589-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026M00627753-I1Open ↗
09/27/2026M00627753-I1Open ↗
08/28/2026M00667589-P5Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/16/2010120525734Open ↗
10/20/2009120132668Open ↗
10/03/2009120132668Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/16/2010120525734Open ↗
08/15/2009120132668Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/16/2010120525734Open ↗
08/15/2009120132668Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/13/2026121253865Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/13/2026121253865Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
06/17/2024121253865Open ↗
08/15/2009120132668Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00627753-P2Open ↗
09/03/2026M00627753-I1Open ↗
08/21/2026M00667589-P4Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/16/2010120525734Open ↗
11/16/2010120525734Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/15/2009120132668Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00667589-I1Open ↗
08/13/2026M00667575-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/03/2026M00627753-I1Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/03/2026M00627753-P2Open ↗
09/03/2026M00627753-I1Open ↗
08/26/2026M01095993-I1Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/22/2025121253865Open ↗
06/17/2024121253865Open ↗
06/17/2024121253865Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/30/2025103216565Open ↗
10/20/2009120132668Open ↗
10/03/2009120132668Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
09/03/2026M00627753-P2Open ↗
09/03/2026M00627753-I1Open ↗
08/14/2026M00627753-P1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
11/10/2025121253865Open ↗
03/26/2024121253865Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/16/2010120525734Open ↗
08/15/2009120132668Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
06/17/2024121253865Open ↗
02/11/2011120525734Open ↗
11/16/2010120525734Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/13/2026121253865Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
11/12/2025121253865Open ↗
06/17/2024121253865Open ↗
▸BISEFILING COVER SHEET2
11/16/2010120525734Open ↗
08/15/2009120132668Open ↗
▸Other Documents2
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M00841604-I1Open ↗
08/13/2026M00841604-P1Open ↗