← Back
Elevator apt, semi-fireproof without stores
305 WEST 13 STREET
MANHATTAN · BIN 1011714
💬 Discuss this project
1964Year Built
6Stories
D1Building Class
C1-6Zoning
56,508 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized20 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: SUPREME COMPANY I · 14,517 sf lot · 3.89 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 13 docs
Bulkhead1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL SYSTEMS807/08/2026
HH BUILDING CONSULTING503/22/2026
SUPREME COMPANY2503/22/2026
SUPREME COMPANY 12803/22/2026
IGOR CONSTRUCTION103/22/2026
342 E 67 OWNERS CORPORATI103/22/2026
PRIME CONSTRUCTION RESTORATION103/22/2026
METRO REAL ESTATE103/22/2026
SUPREME COMPANY ONE403/21/2026
BERDAR EQUITUES703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAVANE & KWALBRUN108/23/2022
OLD STRUCTURES ENGINEERING, P.C.107/01/2022
LUKE LICALZI, P.E., P.C.205/26/2021
ASHRAF CORP205/18/2021
THOMAS A FENNIMAN ARCHITECT104/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
Rigid Structural Design, LLC203/21/2026
EDI CONSULTING GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL SYSTEMS LLCGeneral Contractor1607/08/2026
LINEAL CONSTRUCTION & RESGeneral Contractor303/21/2026
EMPIRE MECHANICAL SVCS*General Contractor303/21/2026
GALICIA CONTRACTING & REST.General Contractor307/08/2026
G. POULAKIS ELEC'L CONTR'Electrical103/22/2026
GEORGE BASSOLINOPlumbing103/21/2026
REAZ MOHAMMEDElectrical103/21/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
PRIME CONSTRUCTION & RESTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018108/23/2022
CHEN ENGINEERING SERVICES1826107/01/2022
THOMAS A. FENNIMAN ARCHIT260104/16/2021
Building Lifecycle
All (122)Filed (7)Permit Issued (11)Signed Off (5)Facade (FISP) (18)Violation (60)Inspection (1)Special Inspection (20)
11/17/2025
Violation issued (HPD, closed)
I
01/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2023
Signed off — Alteration
mechanial work as per plans filed herewith. no change to use, egress or occupancy.
M00781946-I1
01/05/2023
Signed off — Alteration
M00747816-I1
11/02/2022
Violation issued (HPD, closed)
I
10/31/2022
Permit issued — Mechanical Systems
M00781946-I1-MS
10/26/2022
Permit issued — Structural
M00747816-I1-ST
10/07/2022
Cycle 9 facade report signed — SAFE
08/23/2022
Filed — Alteration
mechanial work as per plans filed herewith. no change to use, egress or occupancy.
M00781946-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
07/26/2022
Special inspection requirement — Electrical motors and elevators
William Ryan
07/26/2022
Special inspection requirement — Maintenance information
William Ryan
07/26/2022
Special inspection requirement — Shutoff dampers
William Ryan
07/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
07/26/2022
Special inspection requirement — Mechanical Systems
William Ryan
07/26/2022
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
07/26/2022
Special inspection requirement — Final
William Ryan
07/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
07/18/2022
Cycle 9 facade report submitted
07/11/2022
Cycle 9 facade inspection completed
07/08/2022
Signed off — Alteration
M00476400-I1
07/01/2022
Filed — Alteration
M00747816-I1
07/01/2022
Cycle 9 facade report submitted
07/01/2022
Cycle 9 facade report signed — UNSAFE
06/29/2022
Cycle 9 facade inspection completed
05/31/2022
Special inspection requirement — Structural Steel - Welding
HENLIA CHEN
05/31/2022
Special inspection requirement — Final
HENLIA CHEN
05/31/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
HENLIA CHEN
05/31/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
HENLIA CHEN
05/31/2022
Special inspection requirement — Structural Steel - Details
HENLIA CHEN
05/31/2022
Special inspection requirement — Structural Steel - High Strength Bolting
HENLIA CHEN
05/16/2022
Permit issued — General Construction
M00476400-I1-GC
04/29/2022
Permit issued — Sidewalk Shed
M00492062-I1-SH
04/29/2022
Permit issued — Supported Scaffold
M00524159-I1-SF
02/18/2022
Cycle 9 facade report submitted
02/18/2022
Cycle 9 facade report signed — UNSAFE
02/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2022
Cycle 9 facade inspection completed
12/29/2021
Signed off — Alteration
M00496653-I1
12/15/2021
Signed off — Alteration
M00496613-I1
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2021
Violation issued (ECB, closed)
Unknown
09/17/2021
Violation issued (ECB, closed)
Unknown
07/12/2021
Permit issued — Sidewalk Shed
M00492062-I1-SH
07/09/2021
Permit issued — Supported Scaffold
M00524159-I1-SF
07/01/2021
Permit issued — General Construction
M00496613-I1-GC
05/26/2021
Filed — Alteration
M00496653-I1
05/26/2021
Filed — Alteration
M00496613-I1
05/20/2021
Permit issued — General Construction
M00476400-I1-GC
05/19/2021
Permit issued — Supported Scaffold
M00524159-I1-SF
05/18/2021
Filed — Alteration
M00524159-I1
04/16/2021
Filed — Alteration
M00476400-I1
03/25/2021
Permit issued — Sidewalk Shed
M00492062-I1-SH
03/24/2021
Filed — Alteration
M00492062-I1
02/25/2021
Special inspection requirement — Air barrier - visual inspection
Thomas Fenniman
02/25/2021
Special inspection requirement — Final
Thomas Fenniman
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEMPIRE MECHANICAL SVCS*10/31/2022
DOB NOWStructuralSigned-offLINEAL CONSTRUCTION & RES10/26/2022
DOB NOWGeneral ConstructionSigned-offGALICIA CONTRACTING & RES05/16/2022
DOB NOWSidewalk ShedPermit IssuedSTEEL SYSTEMS LLC04/29/2022
DOB NOWSupported ScaffoldPermit IssuedSTEEL SYSTEMS LLC04/29/2022
DOB NOWSidewalk ShedPermit IssuedSTEEL SYSTEMS LLC07/12/2021
DOB NOWSupported ScaffoldPermit IssuedSTEEL SYSTEMS LLC07/09/2021
DOB NOWGeneral ConstructionSigned-offPRIME CONSTRUCTION & REST07/01/2021
DOB NOWGeneral ConstructionSigned-offGALICIA CONTRACTING & RES05/20/2021
DOB NOWSupported ScaffoldPermit IssuedSTEEL SYSTEMS LLC05/19/2021
DOB NOWSidewalk ShedPermit IssuedSTEEL SYSTEMS LLC03/25/2021
BISMHISSUEDPRIME CONSTRUCTION & REST06/24/2019
BIS—ISSUEDPRIME CONSTRUCTION & REST06/14/2019
BISOTISSUEDC C CONTROLLED COMBUSTION05/28/2019
BISPLISSUEDMASTER 2 PLBG & HTG INC04/17/2019
BISOTISSUEDPRIME CONSTRUCTION & REST04/09/2019
BISOTISSUEDGALICIA CONTRACTING & REST.01/10/2019
BISPLISSUEDMASTER 2 PLBG & HTG INC07/27/2018
BISPLISSUEDADVANTAGE PLBG & MECH.COR06/12/2018
BISOTISSUEDPRIME CONSTRUCTION & REST06/05/2018
BISOTISSUEDPRIME CONSTRUCTION & REST05/23/2018
BISPLISSUEDADVANTAGE PLBG & MECH.COR03/30/2018
BISPLISSUEDADVANTAGE PLBG & MECH.COR03/30/2018
BISPLISSUEDADVANTAGE PLBG & MECH.COR03/16/2018
BISOTISSUEDHOME CONSTRUCTION CORP02/28/2018
BISPLISSUEDBT'S PLUMBING AND HEATING07/06/2017
BISPLISSUEDBT'S PLUMBING AND HEATING07/03/2017
BISMHISSUEDGA LANDMARK CONSTRUCTION06/02/2017
BISOTISSUEDGA LANDMARK CONSTRUCTION06/02/2017
BISPLISSUEDADVANTAGE PLBG & MECH.COR05/18/2017
BISOTISSUEDHOME CONSTRUCTION CORP05/11/2017
BISPLISSUEDADVANTAGE PLBG & MECH.COR05/10/2017
BISOTISSUEDGA LANDMARK CONSTRUCTION05/09/2017
BISOTISSUEDHOME CONSTRUCTION CORP04/20/2017
BISPLISSUEDADVANTAGE PLBG & MECH.COR10/24/2016
BISOTISSUEDGA LANDMARK CONSTRUCTION10/20/2016
BISPLISSUEDADVANTAGE PLBG & MECH.COR09/14/2016
BISOTISSUEDHOME CONSTRUCTION CORP09/07/2016
BISOTISSUEDC C CONTROLLED COMBUSTION07/28/2015
BISFSISSUEDC C CONTROLLED COMBUSTION05/14/2015
+ 21 more permits on file
8 projects · most recent 11/27/2024
General Wiring
FiledStatusContractorScope
11/27/2024CompleteTHE METRO GROUP ELECTRICGeneral Wiring
07/06/2022Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
10/19/2021CompleteRESPONSE ELECTRIC INC.General Wiring
10/19/2021CompleteRESPONSE ELECTRIC INC.General Wiring
09/16/2021Permit IssuedROBERT CHIMENTI86 meters, 1 new_meters
05/17/2021CompleteG. POULAKIS ELEC'L CONTR'General Wiring
03/18/2021Permit IssuedTOP SHELF ELECTRIC CORP—
01/02/2018CompleteGEMINI ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/26/2022HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
07/26/2022Electrical motors and elevatorsWilliam Ryanenergy_progress
07/26/2022Maintenance informationWilliam Ryanenergy_progress
07/26/2022Shutoff dampersWilliam Ryanenergy_progress
07/26/2022HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
07/26/2022Mechanical SystemsWilliam Ryanspecial
07/26/2022Energy Code Compliance InspectionsWilliam Ryanprogress
07/26/2022FinalWilliam Ryanprogress
07/26/2022HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
05/31/2022Structural Steel - WeldingHENLIA CHENspecial
05/31/2022FinalHENLIA CHENprogress
05/31/2022Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
05/31/2022Mastic and Intumescent Fire-resistant CoatingsHENLIA CHENspecial
05/31/2022Structural Steel - DetailsHENLIA CHENspecial
05/31/2022Structural Steel - High Strength BoltingHENLIA CHENspecial
02/25/2021Air barrier - visual inspectionThomas Fennimanenergy_progress
02/25/2021FinalThomas Fennimanprogress
02/25/2021Energy Code ComplianceThomas Fennimanprogress
02/25/2021Structural Stability – Alterations of existing buildingsThomas Fennimanspecial
02/25/2021MasonryThomas Fennimanspecial
▾Documents — 557 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/04/2026M00492062-I1Request digital key ↗
09/03/2026M00524159-I1Request digital key ↗
09/03/2026M00496653-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00476400-I1Request digital key ↗
▸Applications & Permits106
▸BISPLAN / WORK APPROVAL APPLICATION53
05/05/2023104714908Open ↗
04/25/2023104714908Open ↗
04/07/2023104714908Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION51
11/25/2019123538662Open ↗
08/14/2019123668682Open ↗
06/24/2019123668682Open ↗
Showing 3 of 51 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/03/2020123538662Open ↗
▸BISPLAN / WORK APPROVAL APPLICATIONPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications94
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
02/21/2020123529066Open ↗
02/21/2020123529066Open ↗
11/06/2019123668682Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026M00747816-I1Open ↗
08/29/2026M00476400-I1Open ↗
08/29/2026M00476400-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026M00747816-I1Open ↗
08/29/2026M00747816-I1Open ↗
08/29/2026M00747816-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/04/2026M00492062-I1Open ↗
08/13/2026M00496653-I1Open ↗
08/13/2026M00476400-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/24/2019140850461Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/24/2019140850461Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/24/2019140850461Open ↗
▸Trade Schedules & Equipment44
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE28
05/02/2019123668682Open ↗
04/01/2019123733709Open ↗
03/25/2019123538662Open ↗
Showing 3 of 28 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
05/24/2019140850461Open ↗
Showing 1 of 5 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
10/04/2022123538662Open ↗
10/04/2022123538662Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
10/04/2022123538662Open ↗
10/04/2022123538662Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection22
▸BISTenant Protection Plan and Notes16
05/02/2019123668682Open ↗
04/23/2019123538662Open ↗
04/01/2019123733709Open ↗
Showing 3 of 16 on file for this type
▸BISSTREET TREE CHECKLIST4
11/05/2022123538662Open ↗
11/05/2022123538662Open ↗
11/05/2022123538662Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
10/20/2022123538662Open ↗
▸Environmental & Asbestos28
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
05/02/2019123668682Open ↗
04/01/2019123733709Open ↗
11/29/2018123538662Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026M00496613-I1Open ↗
08/13/2026M00496653-I1Open ↗
08/13/2026M00747816-I1Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance76
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
02/21/2020123529066Open ↗
02/21/2020123529066Open ↗
11/06/2019123668682Open ↗
Showing 3 of 40 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
09/08/2022123538662Open ↗
10/05/2021123538662Open ↗
02/21/2020123529066Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
10/27/2022140850461Open ↗
01/21/2022123538662Open ↗
10/05/2021123538662Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00476400-I1Open ↗
08/13/2026M00496613-I1Open ↗
08/13/2026M00781946-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/27/2022140850461Open ↗
10/04/2022123538662Open ↗
▸BIS* HVAC INSULATION AND SEALING2
10/04/2022123538662Open ↗
10/04/2022123538662Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/24/2019140850461Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/24/2023104714908Open ↗
10/27/2022140850461Open ↗
10/05/2021123538662Open ↗
Showing 3 of 7 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/24/2023104714908Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
05/30/2023104714908Open ↗
12/01/2022140850461Open ↗
02/21/2020123529066Open ↗
Showing 3 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/01/2019123733709Open ↗
01/16/2019123538662Open ↗
Showing 2 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF1
05/30/2023104714908Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
11/29/2018123538662Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT50
01/21/2022123538662Open ↗
11/23/2021123538662Open ↗
02/21/2020123529066Open ↗
Showing 3 of 50 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/24/2023104714908Open ↗
10/27/2022140850461Open ↗
10/04/2022123538662Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
11/05/2022123538662Open ↗
▸Filing & Intake Forms66
▸BISEFILING COVER SHEET25
05/02/2019123668682Open ↗
04/01/2019123733709Open ↗
11/29/2018123538662Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM22
02/21/2020123529066Open ↗
11/06/2019123668682Open ↗
11/06/2019123668682Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION17
05/11/2023104714908Open ↗
03/20/2020123538662Open ↗
05/08/2019123538662Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/24/2019140850461Open ↗
Showing 1 of 2 on file for this type
▸Other Documents5
▸BISPLOT DIAGRAM2
05/08/2019123538662Open ↗
11/29/2018123538662Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDHCR Document1
08/13/2026M00476400-I1Open ↗