💬 Discuss this project
1950Year Built
6Stories
R4Building Class
R7BZoning
35,239 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized30 Open Violations ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: 305 CONDOMINIUM · 11,236 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Roof5p · 1 filing · 6 docs
Bulkhead1p · 1 filing · 6 docs
Cellar3p · 1 filing · 9 docs
7 jobs · most recent 04/08/2025
General Wiring
FiledStatusContractorScope
04/08/2025Permit IssuedRICHARD NEU—
07/01/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
06/29/2022CompleteSERENITY ELECTRIC CORPGeneral Wiring
03/30/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
04/13/2021CancelledBIL-MEL ELECTRIC CORPGeneral Wiring
09/02/2020CompleteTOP SHELF ELECTRIC CORP—
01/13/2019Permit IssuedFALCON ELECTRIC CORPGeneral Wiring
1 job · most recent 04/07/2025
Sidewalk Shed
FiledStatusContractorScope
04/07/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
Building Lifecycle
All (137)Filed (16)Permit Issued (13)Signed Off (9)Facade (FISP) (15)Violation (60)Inspection (5)Objection (2)Special Inspection (17)
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
A
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
B
12/03/2025
Cycle 9 facade report submitted
12/03/2025
Cycle 9 facade report signed — SAFE
11/04/2025
Cycle 9 facade inspection completed
10/16/2025
Signed off — Alteration
M01013554-I1
08/30/2025
Violation issued (HPD, open)
A
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
07/10/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01096637-I1
04/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01096637-P1
04/15/2025
Permit issued — General Construction
M01013554-I1-GC
04/08/2025
Permit issued — Sidewalk Shed
M01206028-I1-SH
04/07/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01206028-I1
04/04/2025
Permit issued — General Construction
M01013554-I1-GC
08/21/2024
Permit issued — Suspended Scaffold
M01096637-I1-SC
08/15/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01096637-I1
06/11/2024
Cycle 9 facade report signed — SWARMP
05/15/2024
Violation issued (HPD, closed)
B
05/15/2024
Violation issued (HPD, closed)
B
05/15/2024
Violation issued (HPD, closed)
A
05/15/2024
Violation issued (HPD, closed)
B
05/15/2024
Violation issued (HPD, closed)
A
05/07/2024
Violation issued (HPD, closed)
C
05/07/2024
Violation issued (HPD, open)
C
05/07/2024
Violation issued (HPD, closed)
C
04/09/2024
Filed — Alteration
M01013554-I1
03/29/2024
Special inspection requirement — Energy Code Compliance Inspections
OSVALDO BERTOLINI
03/01/2024
Special inspection requirement — Masonry
OSVALDO BERTOLINI
03/01/2024
Special inspection requirement — Post-installed Anchors
OSVALDO BERTOLINI
03/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RONALD GRAPIN
03/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
OSVALDO BERTOLINI
03/01/2024
Special inspection requirement — Final
OSVALDO BERTOLINI
02/20/2024
Cycle 9 facade report submitted
01/09/2024
Cycle 9 facade inspection completed
08/01/2023
Violation issued (HPD, closed)
B
08/01/2023
Violation issued (HPD, closed)
B
08/01/2023
Violation issued (HPD, closed)
B
08/01/2023
Violation issued (HPD, closed)
B
07/22/2023
Violation issued (HPD, open)
C
05/31/2023
Violation issued (HPD, closed)
B
05/31/2023
Violation issued (HPD, closed)
A
05/31/2023
Violation issued (HPD, closed)
B
05/31/2023
Violation issued (HPD, closed)
A
05/31/2023
Violation issued (HPD, closed)
B
05/31/2023
Violation issued (HPD, closed)
B
05/31/2023
Violation issued (HPD, closed)
A
05/31/2023
Violation issued (HPD, closed)
B
12/13/2022
Signed off — Alteration
Renovate Kitchen, remove non load bearing partitions,remove and replace finishes.
M00767265-I1
11/23/2022
Signed off — Alteration
Limited Basement Slab Installation. No change to use, egress or occupancy.
M00520414-I1
11/16/2022
Signed off — Alteration
Renovation of Apartment 3J in conjunction with application #M00600951.
M00600943-I1
11/14/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/08/2022
Permit issued — General Construction
M00600943-I1-GC
Latest 60 of 137 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LOVETT GROUP1007/08/2026
RELIABLE ENTERPRISES404/09/2026
THE 305 CONDOMINUM C/O3103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)603/21/2026
SNR EXPEDITING DESIGN203/21/2026
HS DESIGN STUDIO403/21/2026
BERTOLINI ARCHITECTURAL WORKS DPC203/21/2026
ROBERT PAPAZIAN ARCHITECT PC203/21/2026
JULIAN A. GOMEZ403/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EKA CONTRACTING LLCGeneral Contractor707/08/2026
KIKO'S CONSTRUCTION CORPGeneral Contractor407/08/2026
MCKENNA RENOVATIONS LLCGeneral Contractor203/21/2026
RICHARD NEUElectrical103/21/2026
SERENITY ELECTRIC CORPElectrical103/22/2026
SERGIO GIANNACHIElectrical103/21/2026
JERUSALEM CONSTRUCTION INGeneral Contractor107/08/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor104/09/2026
BIL-MEL ELECTRIC CORPElectrical103/22/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC8011104/09/2024
BERTOLINI ARCHITECUTRAL W6488104/09/2024
ROBERT PAPAZIAN ARCHITECT3491107/11/2022
BONSIGNORE ARCHITECTS, PC1109110/21/2021
C.M. TESTING LABORATORY,1352107/23/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC04/15/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC04/08/2025
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC04/04/2025
DOB NOWSuspended ScaffoldSigned-offOSMANI NYC INC08/21/2024
DOB NOWGeneral ConstructionSigned-offKIKO'S CONSTRUCTION CORP11/08/2022
DOB NOWGeneral ConstructionSigned-offMCKENNA RENOVATIONS LLC08/25/2022
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO06/28/2022
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC06/16/2022
DOB NOWGeneral ConstructionSigned-offKIKO'S CONSTRUCTION CORP03/08/2022
DOB NOWGeneral ConstructionSigned-offJERUSALEM CONSTRUCTION IN10/27/2021
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC09/03/2021
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC08/10/2021
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU08/20/2020
BISOTISSUEDNEW GENERATION IRON02/09/2022
BISOTISSUEDNEW GENERATION IRON10/28/2021
BISOTISSUEDPROTO RESTORATION CONSTRUCTION06/22/2020
BISOTISSUEDNEW GENERATION CONSTRUCTI05/20/2020
BISOTISSUEDAMAZING BUILDERS AND RENO12/17/2019
BISOTISSUEDNEW GENERATION CONSTRUCTI09/20/2019
BISPLISSUEDBENT MECHANICAL CORP05/30/2017
BISOTISSUEDAMAZING BUILDERS AND RENO05/26/2017
BISPLISSUEDDH EAGLE PLBG & HTG INC11/09/2016
BISOTISSUEDMENENDEZ CONSTRUCTION INC11/07/2016
BISOTISSUEDMENENDEZ CONSTRUCTION INC11/07/2016
BISOTISSUEDMENENDEZ CONSTRUCTION INC09/28/2016
BISOTISSUEDTERRA NOVA RESTORATION CO03/20/2015
BISPLISSUEDDEROZA-WATSON PLBG & HTG07/08/2010
BISEQISSUEDEVEREST SCAFFOLDING INC08/11/2008
BISOTISSUEDS & M CONSULTANTS INC06/30/2008
BISOTISSUEDKAY WATERPROOFING CORP12/02/1999
BISPLISSUEDPACIFIC PLBG&HTG CORP04/09/1999
BISOTISSUEDEISNER MADELINE03/31/1999
BISFBISSUEDABILENE, INC05/14/1998
BISOTISSUEDW LARRY FLYNN04/15/1996
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/14/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/29/2024Energy Code Compliance InspectionsOSVALDO BERTOLINIprogress
03/01/2024MasonryOSVALDO BERTOLINIspecial
03/01/2024Post-installed AnchorsOSVALDO BERTOLINIspecial
03/01/2024Structural Stability – Alterations of existing buildingsRONALD GRAPINspecial
03/01/2024Tenant Protection Plan ComplianceOSVALDO BERTOLINIspecial
03/01/2024FinalOSVALDO BERTOLINIprogress
05/24/2022FinalJames Vignolaprogress
05/24/2022Fire-Resistance Rated ConstructionJames Vignolaprogress
04/06/2022Fire-Resistance Rated ConstructionJames Vignolaprogress
03/29/2022FinalJames Vignolaprogress
10/10/2021Interior lighting powerRichard Bonsignoreenergy_progress
10/10/2021Lighting in dwelling unitsRichard Bonsignoreenergy_progress
10/10/2021MeteringRichard Bonsignoreenergy_progress
10/10/2021Fire-Resistant Penetrations and JointsRichard Bonsignorespecial
10/10/2021FinalRichard Bonsignoreprogress
07/15/2021Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
07/13/2021FinalRICHARD AYOTTEprogress
▾Documents — 248 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch15
09/03/2026M00520414-I1Request digital key ↗
09/03/2026M00520414-P1Request digital key ↗
09/03/2026M00556748-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00375368-I1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION23
02/20/2026123693887Open ↗
02/02/2026123693887Open ↗
01/07/2026123693887Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION13
10/28/2021123693887Open ↗
06/22/2020123867057Open ↗
05/22/2020123693887Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
02/27/2020123693887Open ↗
02/27/2020123693887Open ↗
01/16/2020123867057Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00375368-I1Open ↗
09/03/2026M00520414-P1Open ↗
09/03/2026M00520414-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/05/2026M00520414-I1Open ↗
09/05/2026M00520414-I1Open ↗
09/02/2026M00556748-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/13/2017123070470Open ↗
09/20/2016122845467Open ↗
06/21/2010120388115Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M00556748-I1Open ↗
08/29/2026M00609253-I1Open ↗
08/28/2026M01013554-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/21/2010120388115Open ↗
08/08/2008110313214Open ↗
06/23/2008110205965Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/13/2017123070470Open ↗
09/20/2016122845467Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE4
10/18/2010120388115Open ↗
10/18/2010120388115Open ↗
08/30/2010120388115Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/30/2017123070470Open ↗
10/20/2017123070470Open ↗
06/13/2017123070470Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
06/21/2010120388115Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes7
01/16/2020123867057Open ↗
12/11/2019123845009Open ↗
10/03/2019123693887Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/05/2019123253442Open ↗
10/18/2016122909969Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00375368-I1Open ↗
▸Environmental & Asbestos25
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
01/16/2020123867057Open ↗
12/11/2019123845009Open ↗
08/15/2019123693887Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00556748-I1Open ↗
09/03/2026M00609253-I1Open ↗
09/03/2026M00600943-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/21/2010120388115Open ↗
06/23/2008110205965Open ↗
06/23/2008110205965Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/09/2008110313214Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00520414-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/16/2020123867057Open ↗
12/17/2019123070470Open ↗
12/11/2019123845009Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
12/17/2019123070470Open ↗
07/19/2017122845467Open ↗
07/14/2017122909969Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/24/2022123867057Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/24/2022123867057Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/23/2022123867057Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00609253-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/30/2026123693887Open ↗
08/23/2022123867057Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
08/24/2022123867057Open ↗
12/26/2019123070470Open ↗
07/19/2017122845467Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/21/2010120388115Open ↗
08/08/2008110313214Open ↗
06/23/2008110205965Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/28/2021123693887Open ↗
11/08/2010120388115Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT17
07/29/2022123867057Open ↗
01/16/2020123867057Open ↗
12/26/2019123070470Open ↗
Showing 3 of 17 on file for this type
▸BISWELDERS AFFIDAVIT2
11/14/2016122909969Open ↗
11/14/2016122909969Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
08/24/2022123867057Open ↗
08/24/2022123867057Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
07/01/2008110205965Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET10
01/16/2020123867057Open ↗
12/11/2019123845009Open ↗
08/15/2019123693887Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
10/28/2021123693887Open ↗
05/22/2020123693887Open ↗
05/11/2020123693887Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
08/24/2022123867057Open ↗
02/27/2020123693887Open ↗
02/27/2020123693887Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet1
06/23/2008110205965Open ↗
▸Other Documents7
▸DOB NOWCalculations2
08/26/2026M01096637-I1Open ↗
08/13/2026M01096637-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/26/2026M01096637-I1Open ↗
08/13/2026M01096637-P1Open ↗
▸BISSupporting Document: Fee Exempt1
11/14/2016122909969Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
06/13/2017123070470Open ↗
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
11/02/2016122909969Open ↗