← Back
BuildNYC
Condo, hotel / boatel
Artel Time Square
305 WEST 39TH STREET · BIN 1088180
💬 Discuss this project
2004Year Built
20Stories
RHBuilding Class
C6-4Zoning
22,841 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized10 Active Violations 5 unresolved · 5 paperwork only ▸FISP: SAFE
Condo, hotel / boatel · Owner of record: Yad · 2,469 sf lot · 9.25 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Cellar1 filing
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YED407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Azimuth Engineering103/02/2022
Leon Skvirsky PE106/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group103/21/2026
Building Brothers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A Electrical Main ServiceElectrical103/21/2026
Powerone Elect'l ContractingElectrical103/21/2026
Fried Electric CoElectrical103/21/2026
A Cell CommunicationsGeneral Contractor107/08/2026
R.G.M. SignsSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jeremy K McKeon, P.E7263103/02/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/09/2026
Elevator Category 1 inspection report filed
08/05/2026
Class 2: separating car doors at the bottom in closed position creates excessive gap and exposes access to the hoistway while the car is in motion,…
ECB violation · open
08/05/2026
Class 2: in-car position indicator inoperative. As per asme A17.1 8.6. Remedy: repair or replace indicator and verify proper floor display.…
ECB violation · open
08/05/2026
At the time of inspection observed severely rusted nuts and bolts also corroded copper piping was soaked and leaking with water on the main…
ECB violation · open
120 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—A Cell Communications—
DOB NOW—R.G.M. Signs—
BIS—HPC Wireless Services—
BIS—Billy Contractors—
BIS—Billy Cont—
BIS—Miesam Construction—
BIS—Mikesan Construction—
BIS—North Shore Sign Co—
BIS—Chief Fire Contracting Co—
BIS—Jack Piccini—
BIS—Colgate Scaffolding & Equipment—
BIS—Mikesam Construction—
BIS—Mikesan Construction—
BIS—MPS Plumbing & Heating—
BIS—Mikesam Construction—
BIS—Colgate Scaff. Equ—
BIS—Mikesan Construction—
BIS—Colgate Scaffolding & Equipment—
BIS—Colgate Scaff. Equ—
BIS—Mikesam Construction—
BIS—Colgate Scaffolding & Eq—
BIS—Mikesan Construction—
BIS—Mikesam Construction—
BIS—Mikesam Construction—
BIS—Chief Fire Contracting Co—
BIS—Colgate Scaff. Equ—
BIS—Mikesan Construction—
BIS—Mikesam Construction—
BIS—Wasoff Plumbing & Utility Co—
BIS—Mikesan Construction—
Nothing on file for this building.
Nothing on file for this building.
42 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account