Elevator cooperative
305 WEST 86 STREET
MANHATTAN · Upper West Side (Central) · BIN 1033940
💬 Discuss this project
1926Year Built
15Stories
D4Building Class
R10AZoning
64,968 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 305 EQUITIES CORP · 6,110 sf lot · 10.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof2p · 2 filings · 6 docs
Floor 55p · 1 filing · 6 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COWLEY ENGINEERING407/08/2026
305 EQUITES CORP.2503/22/2026
MAXWELL KATES203/22/2026
CANIDO BASONAS CONST SVC503/22/2026
OWNER #305 WEST 86ST103/22/2026
MELOHN PROPERTIES403/22/2026
MEIOWN PROPERTIES103/22/2026
NEIOSN PROPERTIES103/22/2026
MEOHN PROPERTIES103/22/2026
345 EAST 69TH ST OWNERS803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT GERMAIN JR. PE607/14/2025
ALICIA A. INMAN512/02/2021
GREEN DESIGN205/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS403/21/2026
M W EXPEDITING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KNIGHTS INTERIORS INCGeneral Contractor603/21/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
CONSTANCE GARGIULOElectrical203/21/2026
WYNNE PLBG & HEATING CORPPlumbing207/08/2026
MICHAEL SCHMIDTElectrical103/21/2026
MOLLER, GEORGEElectrical103/21/2026
NYC DISTRICT COUNCIL OF CElectrical103/21/2026
BIRNBAUM, ALANElectrical103/21/2026
RICHARD GRIMAElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
BELL FUEL OIL, LLCPlumbing107/08/2026
IPS PLUMBING CORPPlumbing107/08/2026
NYC IRONWORKERS LOCAL 40Electrical103/21/2026
CAMENZULI, CARMINEElectrical103/21/2026
HINKE, WILLIAMElectrical103/21/2026
JACKUS, STEVEElectrical103/21/2026
METROPOLITAN OPERA ASSOCIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100607/14/2025
JUSTIN GEORGES ARCHITECT4445110/30/2020
Building Lifecycle
All (156)Filed (15)Permit Issued (14)Signed Off (8)Facade (FISP) (12)Violation (60)Inspection (5)Objection (26)Special Inspection (16)
06/10/2026
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE INSPECTION.
M01314120-I1
11/26/2025
Signed off — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-S1
11/10/2025
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE INSPECTION.
M01298741-I1
11/07/2025
Permit issued — Suspended Scaffold
M01314120-I1-SC
11/05/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE INSPECTION.
M01314120-I1
10/15/2025
Permit issued — Suspended Scaffold
M01298741-I1-SC
10/07/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE INSPECTION.
M01298741-I1
09/11/2025
Signed off — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-I1
09/11/2025
Signed off — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-S2
08/06/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2025
Filed — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-P1
07/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
07/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
07/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
07/14/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
07/03/2025
Filed — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-P2
07/03/2025
Filed — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-P3
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
07/01/2025
Permit issued — Boiler Equipment
M01093303-S2-BE
06/30/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
06/30/2025
Special inspection requirement — Final
Robert Germain Jr.
04/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2024
Permit issued — General Construction
M01093303-I1-GC
09/24/2024
Permit issued — Plumbing
M01093303-S1-PL
09/12/2024
Filed — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-S2
09/10/2024
Filed — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-S1
09/09/2024
Filed — Alteration
NEW CHIMNEY LINER. NEW GAS METER ROOM. REMOVE EXISTING 5000 GAL OIL TANK. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01093303-I1
04/25/2024
Violation issued (ECB, open)
Construction
02/10/2023
Cycle 9 facade report submitted
12/27/2022
Cycle 9 facade inspection completed
10/27/2022
Signed off — Alteration
Plumbing work being filed in conjunction with Alteration 2 application to renovate and combine units 4C and 4D on the 4th floor. No change to use, egress or occupancy.
M00290567-I1
10/21/2022
Signed off — Alteration
Plumbing work being filed in conjunction with Alteration 2 application to renovate and combine units 4C and 4D on the 4th floor. No change to use, egress or occupancy.
M00290567-S1
10/17/2022
Cycle 9 facade report signed — SAFE
09/29/2022
Signed off — Alteration
M00372789-I1
07/09/2022
Permit issued — Sidewalk Shed
M00372789-I1-SH
06/15/2022
Permit issued — Mechanical Systems
M00290567-S1-MS
04/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/15/2022
Permit issued — General Construction
M00525498-I1-GC
01/27/2022
Permit issued — Plumbing
M00290567-I1-PL
12/02/2021
Filed — Alteration
Plumbing work being filed in conjunction with Alteration 2 application to renovate and combine units 4C and 4D on the 4th floor. No change to use, egress or occupancy.
M00290567-P1
11/10/2021
Permit issued — Plumbing
M00525504-I1-PL
11/02/2021
Violation issued (ECB, closed)
Unknown
10/19/2021
Violation issued (ECB, closed)
Construction
10/01/2021
Permit issued — General Construction
M00525498-I1-GC
09/28/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Violation issued (ECB, closed)
Unknown
09/28/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Violation issued (ECB, closed)
Unknown
07/28/2021
Objection raised — Scope
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection raised — Inspections
07/28/2021
Objection resolved — Addressed
07/15/2021
Filed — Alteration
Replace bathroom fixtures in unit 5D on the 5th floor. Work being done in conjunction with Alteration. No change to use, egress or occupancy.
M00525504-I1
07/15/2021
Filed — Alteration
Renovate unit 5D on the 5th floor. Work to include removing and replacing existing floors, cabinets and finish work in the kitchen and bathroom. No change to use, egress or occupancy.
M00525498-I1
07/15/2021
Permit issued — Sidewalk Shed
M00372789-I1-SH
05/20/2021
Special inspection requirement — Final
Sunil Saigal
05/19/2021
Special inspection requirement — Interior lighting power
ALICIA INMAN
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC11/07/2025
DOB NOWSuspended ScaffoldPermit IssuedTRIBUTE RESTORATION INC10/15/2025
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN07/01/2025
DOB NOWGeneral ConstructionSigned-offGUARANTEED HOME IMPROVEME10/10/2024
DOB NOWPlumbingSigned-offBELL FUEL OIL, LLC09/24/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/09/2022
DOB NOWMechanical SystemsSigned-offKNIGHTS INTERIORS INC06/15/2022
DOB NOWGeneral ConstructionPermit IssuedKNIGHTS INTERIORS INC02/15/2022
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP01/27/2022
DOB NOWPlumbingSigned-offIPS PLUMBING CORP11/10/2021
DOB NOWGeneral ConstructionPermit IssuedKNIGHTS INTERIORS INC10/01/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/15/2021
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP01/26/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/20/2020
BISOTISSUEDCANIDO BASONAS CONST SVC03/03/2022
BISOTISSUEDKNIGHTS INTERIORS INC09/27/2021
BISOTISSUEDCANIDO BASONAS CONST SVC03/10/2021
BISOTISSUEDKNIGHTS INTERIORS INC12/21/2020
BISOTISSUEDCANIDO BASONAS CONST SVC12/17/2020
BISOTISSUEDCANIDO BASONAS CONST SVC10/23/2020
BISPLISSUEDP.S.I. MECHANICAL01/23/2020
BISOTISSUEDMJ PAINTING & RENOVATIONS02/11/2019
BISPLISSUEDP.S.I. MECHANICAL12/17/2018
BISOTISSUEDLOS DOS ASES INC05/29/2018
BISOTISSUEDCRAFTED INTERIORS DESIGN03/12/2018
BISPLISSUEDPROTO P & H SERVICES CORP03/05/2018
BISPLISSUEDDEMAR PLUMBING CORP10/06/2016
BISOTISSUEDARI GROUP, INC10/05/2016
BISPLISSUEDBROOK PLUMBING & HTG CORP06/09/2016
BISPLISSUEDFRED SMITH P&H CO INC06/03/2016
BISMHISSUEDASA BUILDING MAINT INC06/02/2016
BISOTISSUEDASA BUILDING MAINT INC05/31/2016
BISOTISSUEDFOX FORCE FIVE CONSTRUCT03/25/2016
BISPLISSUEDFLEET PLBG AND HTG INC09/04/2014
BISOTISSUEDSPINDLE L & C CORP05/15/2014
BISOTISSUEDR.O. COMPLETE SOLUTIONS C05/13/2013
BISOTISSUEDINTER CONSTRUCTION CORP05/13/2013
BISEQISSUEDEVEREST SCAFFOLDING INC03/04/2013
BISEQISSUEDEVEREST SCAFFOLDING INC03/26/2012
BISOTISSUEDRICONDA MAINTENANCE INC10/21/2008
+ 14 more permits on file
1 project · most recent 07/15/2021
Water/Sanitary
FiledStatusContractorScope
07/15/2021Signed-offIPS PLUMBING CORPWater/Sanitary
10 projects · most recent 08/19/2026
General Wiring Boiler Controls
FiledStatusContractorScope
08/19/2026Permit IssuedVALLEY ELECTRIC OF NY INCGeneral Wiring
09/16/2025CompleteLAURA ELEC'L LIGHTING &Boiler Controls
09/05/2024CompleteLAURA ELEC'L LIGHTING &—
06/27/2024CompleteERIC & NG ELEC'L, INC.—
01/22/2021CompletePAUL M. & SON'S ELECL CONGeneral Wiring
10/03/2020CompleteGSA ELECTRIC CORP.—
07/09/2020CompleteELPO ELECTRICAL CONTG INC—
02/06/2020Permit IssuedCSI SEC & ELECTRIC INCGeneral Wiring
09/17/2018CompleteCENTURY ELECTRIC LLCGeneral Wiring
08/24/2018CompleteGSA ELECTRIC CORP.General Wiring
1 project · most recent 11/05/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/05/2025Signed-offTRIBUTE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/14/2025HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
07/14/2025HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
07/14/2025HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
07/14/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
07/14/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
07/03/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
06/30/2025Chimneys and ventsRobert Germain Jr.special
06/30/2025FinalRobert Germain Jr.progress
05/20/2021FinalSunil Saigalprogress
05/19/2021Interior lighting powerALICIA INMANenergy_progress
05/19/2021FinalALICIA INMANprogress
03/03/2020HVAC insulation and sealing ALICIA INMANenergy_progress
03/03/2020HVAC and service water heating equipment ALICIA INMANenergy_progress
03/03/2020Mechanical SystemsJUSTIN GEORGES, RAspecial
03/03/2020FinalALICIA INMANprogress
03/03/2020HVAC and service water heating system controls ALICIA INMANenergy_progress
▾Documents — 384 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch10
09/03/2026M00525498-I1Request digital key ↗
08/22/2026M01093303-P3Request digital key ↗
08/22/2026M01093303-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00372789-I1Request digital key ↗
08/15/2026M00372789-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00290567-P1Request digital key ↗
09/05/2026M00290567-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00290567-S1Request digital key ↗
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION39
03/06/2026123795599Open ↗
08/24/2022123795599Open ↗
04/01/2021123795599Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION28
12/21/2020123794171Open ↗
11/17/2020123794171Open ↗
10/26/2020123795599Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit5
09/05/2026M00290567-I1Open ↗
09/05/2026M00290567-P1Open ↗
08/14/2026M00290567-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/21/2020123795599Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
11/27/2020123794171Open ↗
▸Seals & Professional Certifications66
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
10/26/2020123795599Open ↗
03/13/2020123794171Open ↗
02/27/2020123794171Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00290567-P1Open ↗
09/05/2026M00290567-I1Open ↗
09/05/2026M00290567-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00372789-I1Open ↗
08/27/2026M01093303-S2Open ↗
08/27/2026M01093303-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026M01093303-S2Open ↗
08/27/2026M01093303-S2Open ↗
08/27/2026M01093303-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/10/2017140664350Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2020140959782Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/30/2020140959782Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/30/2020140959782Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING11
05/03/2018140664350Open ↗
04/18/2018140664350Open ↗
02/15/2018140664350Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/25/2019123365553Open ↗
12/28/2018123365553Open ↗
05/08/2018123365553Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
09/26/2016122844351Open ↗
▸Safety & Tenant Protection22
▸BISSRO MD ANTI-HARASSMENT CHECKLIST8
09/30/2020140959782Open ↗
09/11/2020123795599Open ↗
05/23/2018123365553Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes6
04/21/2020123795599Open ↗
01/06/2020123794171Open ↗
05/08/2018123365553Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan5
09/05/2026M00290567-I1Open ↗
09/05/2026M00290567-P1Open ↗
09/04/2026M00372789-I1Open ↗
Showing 3 of 5 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT2
08/09/2017140664350Open ↗
09/26/2016122844351Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/11/2020123794171Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
04/21/2020123795599Open ↗
01/28/2020123794171Open ↗
06/01/2018140664350Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00290567-I1Open ↗
09/05/2026M00290567-P1Open ↗
08/22/2026M01093303-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
02/11/2020123794171Open ↗
01/06/2020123794171Open ↗
11/25/2019123365553Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
09/13/2019121895592Open ↗
08/29/2019121895592Open ↗
11/28/2018140664350Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/16/2021123795599Open ↗
11/18/2020123794171Open ↗
04/21/2020123795599Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/02/2021123795599Open ↗
03/25/2021123794171Open ↗
02/16/2021123795599Open ↗
Showing 3 of 5 on file for this type
▸BISMASONRY1
10/24/2020123795599Open ↗
▸Approvals, Objections & Sign-offs35
▸BISLANDMARKS APPROVAL12
09/30/2020140959782Open ↗
09/11/2020123795599Open ↗
02/11/2020123794171Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/25/2021123794171Open ↗
09/13/2019121895592Open ↗
08/29/2019121895592Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/11/2020123795599Open ↗
09/13/2019121895592Open ↗
08/29/2019121895592Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
04/28/2021123795599Open ↗
02/19/2019123365553Open ↗
12/04/2018123365553Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLANDMARKS SIGNOFF1
11/28/2018140664350Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
09/30/2020140959782Open ↗
04/21/2020123795599Open ↗
01/06/2020123794171Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms48
▸BISADDITIONAL INFORMATION18
10/14/2022123795599Open ↗
03/25/2021123795599Open ↗
09/23/2020123795599Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET13
04/21/2020123795599Open ↗
04/20/2020123795599Open ↗
01/06/2020123794171Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM12
10/26/2020123795599Open ↗
04/20/2020123795599Open ↗
11/25/2019123365553Open ↗
Showing 3 of 12 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/30/2020140959782Open ↗
07/10/2017140664350Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/23/2020123795599Open ↗
09/23/2020123795599Open ↗
06/13/2016122527818Open ↗
▸BISSupporting Document: Fee Exempt2
02/21/2018140664350Open ↗
10/12/2016122844351Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form2
04/06/2016122527514Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01314120-I1Open ↗
08/13/2026M01298741-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01298741-I1Open ↗
08/13/2026M01314120-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/21/2020123794171Open ↗