Elevator cooperative
Schuyler Arms
305 WEST 98 STREET · BIN 1084822
💬 Discuss this project
1930Year Built
7Stories
D4Building Class
R8BZoning
110,740 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized22 Open Violations 18 unresolved · 4 paperwork only ▸
Elevator cooperative · Owner of record: SCHUYLER ARMS TENANTS CORP · 22,657 sf lot · 4.89 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL707/08/2026
NEW FORCE CONSTRUCTION803/22/2026
MIDBORO MANAGEMENT603/21/2026
SANDBERG MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN P. FOX, ARCHITECT, PC.211/05/2024
NEW YORK ENGINEERING ASSOC., P.C.704/16/2024
PCS ENGINEERING310/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C1403/21/2026
NA & PARTNERS BUILDING CONSULTANTS403/21/2026
PCS ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTORS TRADES & SKIGeneral Contractor1607/08/2026
NEW FORCE CONSTRUCTION CORPGeneral Contractor803/21/2026
STUART ISER, INCFire Protection503/21/2026
NAT'L MECH. SVCS PLBG LLCPlumbing307/08/2026
ARISTON CHIMNEY LLCGeneral Contractor107/08/2026
ASA BUILDING MAINT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851704/16/2024
Building Lifecycle
All (132)Filed (13)Permit Issued (19)Signed Off (6)Violation (60)Inspection (4)Special Inspection (30)
09/23/2025
Permit issued — Sidewalk Shed
M08017449-I1-SH
09/02/2025
Permit issued — Sidewalk Shed
M08017449-I1-SF
07/21/2025
Permit issued — Suspended Scaffold
M01093112-I1-SC
06/12/2025
Violation issued (HPD, closed)
A
12/05/2024
Signed off — Alteration
M00823453-I1
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
John Fox
11/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
John Fox
11/07/2024
Special inspection requirement — Final
John Fox
11/05/2024
Filed — Alteration
M00823453-P1
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
John Fox
10/23/2024
Special inspection requirement — Final
John Fox
10/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
John Fox
10/22/2024
Signed off — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-S1
10/22/2024
Signed off — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-I1
10/22/2024
Signed off — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-S3
10/11/2024
Signed off — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-S2
10/01/2024
Permit issued — Supported Scaffold
M08017449-I1-SH
09/18/2024
Permit issued — Sidewalk Shed
M08017449-I1-SF
09/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/14/2024
Permit issued — Suspended Scaffold
M01093112-I1-SC
08/08/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD DURING FACADE INSPECTION / REPAIRS.
M01093112-I1
08/08/2024
Permit issued — Boiler Equipment
M00950974-S3-BE
07/05/2024
Permit issued — General Construction
M00823453-I1-GC
04/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/17/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
04/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/17/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
04/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/16/2024
Filed — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-S3
04/16/2024
Filed — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-P1
04/16/2024
Filed — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-P3
04/16/2024
Filed — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-P2
04/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/16/2024
Special inspection requirement — Final
LOUIS ARENA
04/16/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
03/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/15/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
03/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/15/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
03/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/14/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
03/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/14/2024
Special inspection requirement — Final
LOUIS ARENA
03/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/14/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/13/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
02/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/19/2024
Violation issued (HPD, closed)
C
02/19/2024
Violation issued (HPD, closed)
C
02/19/2024
Violation issued (HPD, closed)
C
02/19/2024
Violation issued (HPD, open)
B
02/15/2024
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/19/2023
Permit issued — General Construction
M00950974-S2-GC
12/07/2023
Filed — Alteration
REPLACEMENT HOT WATER HEATER WITH HOT WATER BOILER.
M00950974-S2
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI09/23/2025
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI09/02/2025
DOB NOWSuspended ScaffoldPermit IssuedNEW FORCE CONSTR CORP07/21/2025
DOB NOWSupported ScaffoldPermit IssuedCONSTRUCTORS TRADES & SKI10/01/2024
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI09/18/2024
DOB NOWSuspended ScaffoldPermit IssuedNEW FORCE CONSTR CORP08/14/2024
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC08/08/2024
DOB NOWGeneral ConstructionSigned-offASA BUILDING MAINT07/05/2024
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC12/19/2023
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC11/06/2023
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC11/06/2023
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI10/31/2023
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI10/16/2023
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI10/31/2022
DOB NOWSupported ScaffoldPermit IssuedCONSTRUCTORS TRADES & SKI10/31/2022
DOB NOWSidewalk ShedSigned-offNEW FORCE CONSTRUCTION CO12/02/2020
DOB NOWSupported ScaffoldSigned-offNEW FORCE CONSTRUCTION CO12/02/2020
DOB NOWSupported ScaffoldSigned-offNEW FORCE CONSTRUCTION CO11/23/2020
DOB NOWSupported ScaffoldSigned-offNEW FORCE CONSTRUCTION CO11/23/2020
BISOTISSUEDCONSTRUCTORS TRADES & SKI07/18/2025
BISOTISSUEDCONSTRUCTORS TRADES & SKI08/04/2024
BISOTISSUEDCONSTRUCTORS TRADES & SKI02/13/2024
BISOTISSUEDCONSTRUCTORS TRADES & SKI08/07/2023
BISOTISSUEDCONSTRUCTORS TRADES & SKI11/25/2022
BISOTISSUEDNEW FORCE CONSTRUCTION CORP02/10/2021
BISEQISSUEDSPRING SCAFFOLDING LLC04/29/2015
BISMHISSUEDGRECO ROMAN DESIGN CORP06/11/2010
BISOTISSUEDTOMASEVIC GENERAL CONTRACTING03/23/2005
BISBLISSUEDVENDOLA INC09/22/2004
BISPLISSUEDVENDOLA INC09/22/2004
BISEQISSUEDSPRING SCAFF.03/09/2004
BISPLISSUEDA. STEINMAN PLUMBING01/22/2002
BISOTISSUEDARC CONSTRUCTION CORP03/28/2001
BISOTISSUEDATLANTIC RESOTRATION06/11/1996
1 project · most recent 02/02/2021
FiledStatusContractorScope
02/02/2021Permit IssuedACCURATE ELEC'L CORP.—
1 project · most recent 10/31/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/31/2022Permit IssuedCONSTRUCTORS TRADES & SKIScaffold, Sidewalk Shed
1 project · most recent 08/08/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/08/2024Permit IssuedCONSTRUCTORS TRADES & SKISuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2024Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
11/07/2024Energy Code Compliance InspectionsJohn Foxprogress
11/07/2024Fenestration and door U-factor and product ratingsJohn Foxenergy_progress
11/07/2024FinalJohn Foxprogress
10/23/2024Energy Code Compliance InspectionsJohn Foxprogress
10/23/2024FinalJohn Foxprogress
10/23/2024Fenestration and door U-factor and product ratingsJohn Foxenergy_progress
04/17/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/17/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/17/2024Heating SystemsLOUIS ARENAspecial
04/17/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/17/2024Maintenance informationLOUIS ARENAenergy_progress
04/17/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/16/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/16/2024FinalLOUIS ARENAprogress
04/16/2024Chimneys and ventsLOUIS ARENAspecial
03/15/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/15/2024Maintenance informationLOUIS ARENAenergy_progress
03/15/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/15/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
03/15/2024Heating SystemsLOUIS ARENAspecial
03/15/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/14/2024Chimneys and ventsLOUIS ARENAspecial
03/14/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
03/14/2024FinalLOUIS ARENAprogress
03/14/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
Latest 25 of 32.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
09/01/2026M08017449-I1Request digital key ↗
08/27/2026M00950974-I1Request digital key ↗
08/27/2026M00950974-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00420760-P1Request digital key ↗
09/04/2026M00420760-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00420760-I1Request digital key ↗
09/04/2026M00420760-P1Request digital key ↗
▸Applications & Permits23
▸DOB NOWLPC Approval/Permit9
08/25/2026M00823453-I1Open ↗
08/13/2026M00950974-S3Open ↗
08/13/2026M00950974-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
05/10/2023140949357Open ↗
04/04/2023140949357Open ↗
01/19/2021140949357Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
11/28/2022140949357Open ↗
02/10/2021140949357Open ↗
05/07/2015122380869Open ↗
Showing 3 of 5 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
02/02/2021140949357Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
02/02/2021140949357Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/17/2015122380869Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/04/2026M00420760-I1Open ↗
09/04/2026M00420760-P1Open ↗
08/27/2026M00950974-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/30/2026M00950974-I1Open ↗
09/01/2026M00950974-S3Open ↗
08/29/2026M00950974-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/30/2026M00950974-I1Open ↗
09/01/2026M00950974-S3Open ↗
08/29/2026M00950974-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/23/2010120378894Open ↗
06/11/2010120378894Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/05/2015122380869Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2020140949357Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/05/2015122380869Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/11/2010120378894Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
09/04/2026M00420760-P1Open ↗
09/04/2026M00420760-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
01/15/2021140949357Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026M00950974-S1Open ↗
08/27/2026M00950974-I1Open ↗
08/27/2026M00950974-S3Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/11/2010120378894Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/20/2021140949357Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026M00950974-S1Open ↗
08/13/2026M00950974-I1Open ↗
08/13/2026M00950974-S3Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/22/2020140949357Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/22/2020140949357Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/17/2015122380869Open ↗
10/23/2010120378894Open ↗
▸BISLANDMARKS APPROVAL1
05/30/2023140949357Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/11/2010120378894Open ↗
▸BISSUPERSEDING LETTER1
11/28/2022140949357Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
05/05/2023140949357Open ↗
04/03/2023140949357Open ↗
01/14/2021140949357Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM3
11/28/2022140949357Open ↗
11/25/2022140949357Open ↗
11/16/2022140949357Open ↗
▸BISEFILING COVER SHEET2
05/05/2015122380869Open ↗
06/11/2010120378894Open ↗
▸BISADDITIONAL INFORMATION2
05/30/2023140949357Open ↗
01/14/2021140949357Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2020140949357Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/23/2010120378894Open ↗
▸DOB NOWCalculations1
08/13/2026M01093112-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01093112-I1Open ↗