← Back
BuildNYC
Transportation, public ownership
3050 CRUGER AVENUE
BRONX Β· BIN 2055589
πŸ’¬ Discuss this project
0Year Built
β€”Stories
U7Building Class
R6Zoning
0 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report β†—
Transportation, public ownership Β· Owner of record: Verizon New York Β· 20,192 sf lot Β· 0 FAR built Β· Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof11 filings
Floor 71 filing
Floor 66 filings
Floor 55 filings
Floor 41 filing
Floor 33 filings
Floor 21 filing
Floor 12 filings
Cellar1 filing
Sub-Basement1 filing
Site & exterior3 filings
β–ΎOwner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Verizon New York8407/08/2026
NY Telephone Co303/21/2026
Nynex203/21/2026
NY Tel. Co103/21/2026
β–ΎDesign Consultants (Architect / Engineer of Record)
β–ΎFiling Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
KM Associates of New York803/21/2026
Angela Rivera303/21/2026
Merritt Engineering Consultant203/21/2026
K & M Associates1003/21/2026
β–ΎContractors (License-Anchored)
FirmTradeRolesMost Recent
Tishman InteriorsGeneral Contractor2807/08/2026
Robert B. SamuelsElectrical403/21/2026
York Scaffold EquipmentScaffold307/08/2026
RMT ElectricElectrical103/21/2026
Tru-Val ElectricElectrical103/21/2026
Allan/Brite-Way Electrical CoElectrical103/22/2026
New York Plumbing-Heating-CoolingPlumbing103/22/2026
Diane ElectricElectrical103/22/2026
Robert B. SamuelsElectrical103/22/2026
β–ΎSpecial Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services5441308/22/2024
Merritt Engineering Consulting460103/21/2022
Building Lifecycle
All (175)Filed (16)Permit Issued (16)Signed Off (16)Violation (72)Objection (4)Special Inspection (30)
05/18/2026
Boiler inspection report filed
Initial Β· no defects Β· Accepted
03/04/2026
Elevator Category 1 inspection report filed
12/15/2025
Signed off β€” Alteration
X00906591-I1
11/20/2025
FA-01-02A: Failed to install an approved type of fire alarm system consistent with the designated and/or actual occupancy of the building, in…
FDNY_ORDER violation Β· closed
10/31/2025
Signed off β€” Alteration
X00906642-I1
09/02/2025
Boiler inspection report filed
Initial Β· no defects Β· Accepted
08/29/2025
EPP-06-02: Failed to prepare and/or submit Amended Emergency Preparedness Plan for the premises, in violation of FC401.3.6.1, 2008 FC404.6, 3 RCNY…
FDNY_ORDER violation Β· closed
08/29/2025
VC12: failed to provide and/or maintain required fire protection and/or communication system at $$identify condition and location$$ and prevent…
FDNY_NOV violation Β· closed
06/03/2025
Signed off β€” Alteration
Installation of new in-row cooler AC units, dry cooler, and associated ducts and piping. No change to use, egress, or occupancy.
X00979817-S1
06/02/2025
Signed off β€” Alteration
Installation of new in-row cooler AC units, dry cooler, and associated ducts and piping. No change to use, egress, or occupancy.
X00979817-I1
03/05/2025
Closed: Failure to file 2023 external low pressure inspection
DOB violation Β· closed on the city's record
01/03/2025
Signed off β€” Alteration
X00906745-I1
12/23/2024
Closed: Elevator: elevatorrequired (DOB violation)
DOB violation Β· closed on the city's record
12/19/2024
Signed off β€” Alteration
X00719349-I1
11/12/2024
Permit renewed β€” General Construction
Renewed with changes
X00719349-I1-GC
09/24/2024
Boiler inspection report filed
Initial Β· no defects Β· Accepted
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation Β· closed
08/30/2024
Permit issued β€” General Construction
X00906591-I1-GC
08/30/2024
Permit issued β€” Mechanical Systems
X00906642-I1-MS
08/30/2024
Permit issued β€” Structural
X00906745-I1-ST
08/22/2024
Filed β€” Alteration
X00906591-I1
08/20/2024
Filed β€” Alteration
X00906642-I1
08/19/2024
Filed β€” Alteration
X00906745-I1
08/12/2024
VC14: failed to (provide/protect/maintain) required (fire- rated/self-closing/access) door or window at premises. VC17: failed to obtain and/or…
FDNY_NOV violation Β· closed
08/12/2024
VC8: failed to remove combustible waste and/or allowed the storage/accumulation of combustible material, waste and/or vegetation at $$identify…
FDNY_NOV violation Β· closed
08/12/2024
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation Β· closed
06/05/2024
VC12: failed to provide required water-based fire protection system. VC17: failed to obtain and/or produce required certificate of fitness for…
FDNY_NOV violation Β· closed
06/05/2024
VC6: failed to provide and/or maintain required (signs) (postings) (notices) (instructions) for standpipe and/or sprinkler system at valve. VC6:…
FDNY_NOV violation Β· closed
03/18/2024
Permit issued β€” Mechanical Systems
X00979817-S1-MS
03/18/2024
Permit issued β€” General Construction
X00979817-I1-GC
03/07/2024
Filed β€” Alteration
Installation of new in-row cooler AC units, dry cooler, and associated ducts and piping. No change to use, egress, or occupancy.
X00979817-S1
03/07/2024
Filed β€” Alteration
Installation of new in-row cooler AC units, dry cooler, and associated ducts and piping. No change to use, egress, or occupancy.
X00979817-I1
02/05/2024
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation Β· closed on the city's record
01/05/2024
Elevator Category 5 inspection report filed
12/19/2023
Special inspection requirement β€” Mechanical Systems
EUGENE BIFULCO
12/19/2023
Special inspection requirement β€” HVAC-R and service water heating equipment
EUGENE BIFULCO
12/19/2023
Special inspection requirement β€” HVAC-R and service water heating system controls
EUGENE BIFULCO
12/19/2023
Special inspection requirement β€” HVAC-R and service water piping design and insulation
EUGENE BIFULCO
12/19/2023
Special inspection requirement β€” Maintenance information
EUGENE BIFULCO
12/19/2023
Special inspection requirement β€” Energy Code Compliance Inspections
EUGENE BIFULCO
12/19/2023
Special inspection requirement β€” Final
EUGENE BIFULCO
12/15/2023
Permit renewed β€” General Construction
Renewed without changes
X00719349-I1-GC
12/07/2023
Signed off β€” Alteration
Mechanical work for installation of HVAC as part of elevator modernization.
X00666588-I1
12/07/2023
Signed off β€” Alteration
Mechanical work for installation of HVAC as part of elevator modernization.
X00666588-S1
12/05/2023
VC19: failed to (prepare/produce/submit) required documentation: approval for fire protection and/or communication system
FDNY_NOV violation Β· closed
11/15/2023
Boiler inspection report filed
Initial Β· no defects Β· Accepted
10/11/2023
Signed off β€” Alteration
Removal of six dry coolers on roof with associated pipes. Installation of two adiabatic coolers and associated pipes
X00621265-I1
10/11/2023
Signed off β€” Alteration
General Construction work related the 3rd & 6th Floor AC Unit rehabilitation and installation of new rooftop adiabatic coolers.
X00621264-I1
09/15/2023
Signed off β€” Alteration
Structural dunnage for Rooftop adiabatic coolers
X00621266-I1
08/08/2023
VC19: failed to (prepare/produce/submit) required documentation: approval for fire protection and/or communication system VC5: failed to…
FDNY_NOV violation Β· closed
07/06/2023
Permit renewed β€” General Construction
Renewed without changes
X00719349-I1-GC
06/30/2023
Permit issued β€” General Construction
X00666588-I1-GC
06/30/2023
Permit issued β€” Mechanical Systems
X00666588-S1-MS
01/06/2023
Permit issued β€” Structural
X00621266-I1-ST
11/21/2022
Filed β€” Alteration
Structural dunnage for Rooftop adiabatic coolers
X00621266-I1
10/14/2022
Filed β€” Alteration
Mechanical work for installation of HVAC as part of elevator modernization.
X00666588-S1
10/13/2022
Filed β€” Alteration
Mechanical work for installation of HVAC as part of elevator modernization.
X00666588-I1
10/13/2022
Special inspection requirement β€” Mechanical Systems
EUGENE BIFULCO
10/13/2022
Special inspection requirement β€” Final
EUGENE BIFULCO
10/13/2022
Special inspection requirement β€” Heating Systems
EUGENE BIFULCO
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”York Scaffold Equipmentβ€”
DOB NOWβ€”York Scaffold Equipmentβ€”
DOB NOWβ€”York Scaffold Equipmentβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
DOB NOWβ€”Tishman Interiorsβ€”
BISβ€”Tishman Interiorsβ€”
BISβ€”Tishman Interiorsβ€”
BISβ€”Tishman Interiorsβ€”
BISβ€”RC3 Electricβ€”
BISβ€”RC3 Electricβ€”
BISβ€”Gdo Contractingβ€”
BISβ€”Sugrue Contractingβ€”
BISβ€”Spring Scaffoldingβ€”
BISβ€”Tishman Constructionβ€”
BISβ€”Tishman Constructionβ€”
BISβ€”MH Kaneβ€”
BISβ€”MH Kaneβ€”
BISβ€”M & A Plumbingβ€”
BISβ€”MH Kaneβ€”
BISβ€”M & A Plumbingβ€”
BISβ€”Tishman Constructionβ€”
BISβ€”Tishman Constructionβ€”
BISβ€”Tishman Constructionβ€”
+ 32 more permits on file
Nothing on file for this building.
Nothing on file for this building.
β–ΎDocuments β€” 181 on file (BIS + DOB NOW)
β–ΈPlans & Drawings16
β–ΈDOB NOWPlans/Sketch14
08/25/2026X00530356-I1Request the plans β†—
08/24/2026X00692915-I1Request the plans β†—
08/24/2026X00686803-I1Request the plans β†—
Showing 3 of 14 on file for this type
β–ΈDOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026X00252834-I1Request the plans β†—
08/26/2026X00284729-I1Request the plans β†—
β–ΈApplications & Permits20
β–ΈBISPLAN / WORK APPROVAL APPLICATION10
11/21/2019220720343Open β†—
11/21/2019220720263Open β†—
10/18/2016220552916Open β†—
Showing 3 of 10 on file for this type
β–ΈBISWORK PERMIT APPLICATION9
03/05/2020220720263Open β†—
12/30/2019220720343Open β†—
01/13/2017220546611Open β†—
Showing 3 of 9 on file for this type
β–ΈBISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/30/2015220458984Open β†—
β–ΈSeals & Professional Certifications59
β–ΈDOB NOWProgress Inspector Seal & Signature17
10/04/2026X00686803-I1Open β†—
09/01/2026X00621266-I1Open β†—
09/01/2026X00621264-I1Open β†—
Showing 3 of 17 on file for this type
β–ΈDOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026X00252834-I1Open β†—
08/26/2026X00284729-I1Open β†—
08/25/2026X00530356-I1Open β†—
Showing 3 of 16 on file for this type
β–ΈBISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/05/2020220720263Open β†—
03/05/2020220720263Open β†—
12/30/2019220720343Open β†—
Showing 3 of 14 on file for this type
β–ΈDOB NOWSpecial Inspector Seal & Signature8
10/04/2026X00686803-I1Open β†—
09/01/2026X00621266-I1Open β†—
09/01/2026X00621264-I1Open β†—
Showing 3 of 8 on file for this type
β–ΈBISPROFESSIONAL CERTIFICATION STATEMENT2
11/21/2019220720343Open β†—
05/20/2015220458984Open β†—
β–ΈBISPROFESSIONAL CERTIFIED CHECKLIST2
11/21/2019220720343Open β†—
05/20/2015220458984Open β†—
β–ΈTrade Schedules & Equipment8
β–ΈBISEQUIPMENT USE PERMITS6
06/26/2017220552916Open β†—
06/26/2017220552916Open β†—
08/17/2016220488808Open β†—
Showing 3 of 6 on file for this type
β–ΈBISFA - FDNY APPROVAL : FD-FAA1
11/15/2016220546611Open β†—
β–ΈBISEQUIPMENT USE APPLICATION/PERMIT1
08/12/2016220488808Open β†—
β–ΈSafety & Tenant Protection2
β–ΈBISTenant Protection Plan and Notes2
11/21/2019220720343Open β†—
11/21/2019220720263Open β†—
β–ΈEnvironmental & Asbestos19
β–ΈDOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026X00252834-I1Open β†—
08/26/2026X00284729-I1Open β†—
08/24/2026X00686803-I1Open β†—
Showing 3 of 12 on file for this type
β–ΈBISASBESTOS: CERTIFICATION (DEP ACP5)5
11/21/2019220720343Open β†—
11/21/2019220720263Open β†—
10/19/2016220552916Open β†—
Showing 3 of 5 on file for this type
β–ΈDOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026X00666588-I1Open β†—
08/13/2026X00666588-S1Open β†—
β–ΈEnergy Compliance21
β–ΈBISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
11/21/2019220720343Open β†—
11/21/2019220720263Open β†—
03/08/2018220546611Open β†—
Showing 3 of 12 on file for this type
β–ΈBISAS-BUILT ENERGY ANALYSIS5
03/19/2021220720343Open β†—
03/08/2018220546611Open β†—
06/26/2017220552916Open β†—
Showing 3 of 5 on file for this type
β–ΈDOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00252834-I1Open β†—
08/13/2026X00621265-I1Open β†—
β–ΈBISAS-BUILT ENERGY ANALYSIS (EN2)1
06/30/2021220720263Open β†—
β–ΈDOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00979817-S1Open β†—
β–ΈInspections & Test Reports3
β–ΈBISTECHNICAL REPORT: RESPONSIBILITY3
06/30/2021220720263Open β†—
03/19/2021220720343Open β†—
03/19/2021220720343Open β†—
β–ΈApprovals, Objections & Sign-offs11
β–ΈBISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
06/30/2021220720263Open β†—
03/19/2021220720343Open β†—
03/09/2018220546611Open β†—
Showing 3 of 9 on file for this type
β–ΈBISLETTERS - SUPPORTING DOCUMENTATION2
05/09/2017220552916Open β†—
07/13/2016220488808Open β†—
β–ΈCost, Insurance & Ownership11
β–ΈBISCOST AFFIDAVIT11
06/30/2021220720263Open β†—
03/19/2021220720343Open β†—
03/03/2020220720263Open β†—
Showing 3 of 11 on file for this type
β–ΈFiling & Intake Forms11
β–ΈBISEFILING COVER SHEET6
11/21/2019220720343Open β†—
11/21/2019220720263Open β†—
09/29/2016220552916Open β†—
Showing 3 of 6 on file for this type
β–ΈBISADDITIONAL INFORMATION4
07/11/2016220488808Open β†—
06/23/2016220488808Open β†—
04/22/2016220488808Open β†—
Showing 3 of 4 on file for this type
β–ΈBISBOROUGH INTAKE FORM1
03/08/2018220546611Open β†—