← Back
Two stories - detached, small or mid-size
3050 GERRITSEN AVENUE
BROOKLYN · BIN 3248684
💬 Discuss this project
1920Year Built
1.5Stories
A1Building Class
R4-1Zoning
1,775 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 1,800 sf lot · 0.99 FAR built · Flood zone AE
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT505/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW J.D. GEN. CONSTR. INCGeneral Contractor603/21/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642405/13/2026
TRIANGLE INSPECTION & TES7495205/13/2026
Building Lifecycle
All (92)Filed (5)Permit Issued (3)Violation (1)Inspection (11)Objection (42)Special Inspection (30)
07/28/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Metering
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
06/08/2026
Special inspection requirement — Masonry
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Lowest Floor Elevation
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Electric vehicle service equipment requirements
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
06/08/2026
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
05/28/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Other
05/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
05/21/2026
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
05/13/2026
Filed — Alteration CO
Addition, alteration, and conversion of an existing one-family house to convert it into a two-family house as per drawings herewith filed to obtain a new C/O.
B01218253-P1
05/13/2026
Filed — Alteration CO
Addition, alteration, and conversion of an existing one-family house to convert it into a two-family house as per drawings herewith filed to obtain a new C/O.
B01218253-P2
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/11/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/29/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/23/2025
Permit issued — Plumbing
B01218253-S1-PL
11/07/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Energy
10/20/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Energy
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
09/18/2025
Permit issued — Foundation
B01218253-I1-GC-CX
08/29/2025
Permit issued — Construction Fence
B01218256-I1-FN
08/27/2025
Objection resolved — Addressed
07/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2025
Objection raised — Energy
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG12/23/2025
DOB NOWFoundationPermit IssuedNEW J.D. GEN. CONSTR. INC09/18/2025
DOB NOWConstruction FencePermit IssuedNEW J.D. GEN. CONSTR. INC08/29/2025
BISOTISSUEDVOLTAIC SOLAIRE LLC04/03/2018
BIS—ISSUEDN/A01/30/2013
1 project · most recent 05/13/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026Permit IssuedNEW J.D. GEN. CONSTR. INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu ASU7RLF1 7,000 BTU · Fan Coil Indoor ×16
Ventilation
Greenheck SP-B90 100 CFM · Exhaust Fan ×4
1 project · most recent 05/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/13/2026Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Storm, Water/Sanitary
2 projects · most recent 11/07/2025
General Wiring
FiledStatusContractorScope
11/07/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
05/25/2018CompleteBERGER QUALITY ELEC'L CON—
1 project · most recent 05/13/2026
Concrete Masonry Wood
FiledStatusContractorScope
05/13/2026Permit IssuedJOHN FITZGERALD PLBG &HTGConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/28/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
06/08/2026Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
06/08/2026FinalTARIQ SIDDIQUIprogress
06/08/2026MasonryMUZAFFAR JAMALspecial
06/08/2026Mechanical SystemsMUZAFFAR JAMALspecial
06/08/2026Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
06/08/2026Subgrade InspectionsMUZAFFAR JAMALspecial
06/08/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
06/08/2026Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
06/08/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
06/08/2026Lowest Floor ElevationMUZAFFAR JAMALprogress
06/08/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
06/08/2026Footing and FoundationMUZAFFAR JAMALprogress
06/08/2026Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
06/08/2026Fenestration areasMUZAFFAR JAMALenergy_progress
06/08/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
06/08/2026Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
06/08/2026Electric vehicle service equipment requirementsMUZAFFAR JAMALenergy_progress
06/08/2026Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
06/08/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
06/08/2026Fenestration air leakageMUZAFFAR JAMALenergy_progress
06/08/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
06/08/2026Permanent certificateMUZAFFAR JAMALenergy_progress
06/08/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
06/08/2026Maintenance informationMUZAFFAR JAMALenergy_progress
06/08/2026Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
Latest 25 of 61.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01218256-I1Request digital key ↗
08/17/2026B01218253-P2Request digital key ↗
08/17/2026B01218253-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
01/11/2019340587948Open ↗
03/21/2018340587948Open ↗
09/21/2012320587708Open ↗
▸BISWORK PERMIT APPLICATION2
04/03/2018340587948Open ↗
02/01/2013320587708Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/06/2013320587708Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01218253-P1Open ↗
08/13/2026B01218253-I1Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
09/21/2012320587708Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
03/21/2018340587948Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01218253-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature26
08/30/2026B01218253-S1Open ↗
08/30/2026B01218253-S1Open ↗
08/28/2026B01218253-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
08/30/2026B01218253-S1Open ↗
08/30/2026B01218253-S1Open ↗
08/28/2026B01218253-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01218256-I1Open ↗
08/17/2026B01218253-S1Open ↗
08/17/2026B01218253-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/21/2018340587948Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/21/2012320587708Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/15/2026B01218253-P1Open ↗
08/13/2026B01218253-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/21/2012320587708Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
03/21/2018340587948Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01218253-P2Open ↗
08/17/2026B01218253-P3Open ↗
08/17/2026B01218253-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
09/21/2012320587708Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/21/2018340587948Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/26/2019340587948Open ↗
03/21/2018340587948Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/26/2019340587948Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/21/2018340587948Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/26/2019340587948Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/28/2019340587948Open ↗
03/21/2018340587948Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01218253-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE2
12/20/2012320587708Open ↗
09/21/2012320587708Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/10/2013320587708Open ↗
12/10/2013320587708Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/26/2019340587948Open ↗
12/10/2013320587708Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/26/2019340587948Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/26/2019340587948Open ↗
03/21/2018340587948Open ↗
12/10/2013320587708Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/14/2019340587948Open ↗
03/30/2018340587948Open ↗
12/10/2013320587708Open ↗
▸BISEFILING COVER SHEET1
09/21/2012320587708Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/21/2018340587948Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/15/2026B01218253-P1Open ↗
08/13/2026B01218253-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01218253-P1Open ↗
08/13/2026B01218253-I1Open ↗
▸DOB NOWPlot Diagram2
08/15/2026B01218253-P1Open ↗
08/13/2026B01218253-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026B01218253-I1Open ↗
08/15/2026B01218253-P1Open ↗
▸BISPLOT DIAGRAM1
09/21/2012320587708Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01218253-I1Open ↗